Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Remodel unit 2 full bathrooms powder room laundry kitchen and water heater all fixtures. Replace same size & location as per code. Bldg2011-04201 Permit id: Com2011-13939 | |||||
Request for time extension on permit# com2010-17982 issued on 08/30/ with original/amended completion date of 03/01/11original permit description:(com2010-17982)rework interior layout of condos making two units to one. All demolition is already comple Permit id: Com2011-04201 | |||||
Rework interior layout of condos making two units to one. All demolition is already complete from years past. Plumbing electrical hvac sprinkler will all be pulled seperate. We will follow drawings sprinkler rework only as needed finishes-drywall Permit id: Com2010-17982 | |||||
Rework interior layout of condos making two units to one. All demolition is already complete from years past. Plumbing electrical hvac sprinkler will all be pulled seperate. We will follow drawings sprinkler rework only as needed finishes-drywall trim paint cabinets will remain with one kitchen. C/o required on seperate upon completion for the du. Expiration date: March 1, 2011 | Permit id: Com2010-17982 | |||||
Request for time extension on permit# com2010-17982 issued on 08/30/ with original/amended completion date of 03/01/11original permit description:(com2010-17982)rework interior layout of condos making two units to one. All demolition is already complete from years past. Plumbing electrical hvac sprinkler will all be pulled seperate. We will follow drawings sprinkler rework only as needed finishes-drywall trim paint cabinets will remain with one kitchen. C/o required on seperate upon completion for the du. Expiration date: September 1, 2011 | Permit id: Com2011-04201 | |||||
Replace two existing heat pump systems and two existing supply ducts with same type and size. Exhaust 125 cfm. As per code. Expiration date: September 1, 2016 | Permit id: Com2016-04572 | |||||
Relocate 8 add 7 fire spinkler heads as per code. No plans required. Expiration date: October 12, 2016 | Permit id: Com2016-09195 | |||||
Install 26 circuits as per code Expiration date: October 18, 2016 | Permit id: Com2016-09887 | |||||
Rectro fitt existing electricaladd 2 catv 2 phoneadd upto lights (med base) Expiration date: July 8, 2003 | Permit id: Com2003-19061 | |||||
Relocate one lav sink one toilet and one shower work to be done in unit 612 Expiration date: July 22, 2003 | Permit id: Com2003-19908 | |||||
Replace all fixtures and water lines and some drain line add electric water heater as per code. Expiration date: November 3, 2016 | Permit id: Com2016-11274 | |||||
Rework interior layout of condos making two units to one. All demolition is already complete from years past. Plumbing electrical hvac sprinkler will all be pulled seperate. We will follow drawings sprinkler rework only as needed finishes-drywall trim paint cabinets will remain with one kitchen. C o required on seperate upon completion for the du. Expiration date: March 1, 2011 | Permit id: Com2010-17982 | |||||
Request for time extension on permit# com2010-17982 issued on 08 30 with original amended completion date of 03 01 11original permit description:(com2010-17982)rework interior layout of condos making two units to one. All demolition is already complete from years past. Plumbing electrical hvac sprinkler will all be pulled seperate. We will follow drawings sprinkler rework only as needed finishes-drywall trim paint cabinets will remain with one kitchen. C o required on seperate upon completion for the du. Expiration date: September 1, 2011 | Permit id: Com2011-04201 |