Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Reconstruction of a portion of the aircraft parking apron. Expansion of pavement. Replacement of elevated apron security lighting and installation of new air craft tie downs. Urban forestry approval note: this is considered phase 1 of 4. Phase 4 (perimeter with trees) requires tree protection, needing a complete urban forestry plan check arb tree protection compliance review. Check directly with derek sproat, familiar with the airport tree related project needs. Permit status: In plan check | Permit id: 17000-02682 | |||||
SCORE 59 Run electrical to existing gate to allow for automatic opening closing. No change to existing gate or fence and no change to appearance. Fees paid in original permit (16000-03284) adding to scope in revision (17rev-00428) adding a (n) subpanel 125amp at aviation building (n) auto gate (n) pad & bollards for (n) battery back up system 7 13 2017 r. O. Permit status: Permit issued | Permit id: 16000-03284 | |||||
Demo of (e) non ada compliant entry rear ramps, back side stairs, back deck. Replace with (n) access infastructure (827 sf) to meet ada requirements as well fixing deteriorating quality of existing materials Permit status: Permit issued | Permit id: 16000-03275 | |||||
16000-03284: adding a (n) subpanel 125amp at aviation building (n) auto gate (n) pad & bollards for (n) battery back up system. Fees paid in original permit (16000-03284) Permit status: Permit issued | Permit id: 17rev-00428 |