Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Misc mech for replace duct work for existing sfd Permit type: Mechanical : 80 - ac | Permit status: Permit finaled | Completion date: June 10, 2011 | Permit id: Pds2011-1009-20 | |||||
SCORE 89 Misc mech for replace duct work for existing sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 10, 2011 | Permit id: Pds2011-1009-20 | |||||
SCORE 72 5,3 sqft re-roof w sheathing replacement for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material clay tiles proposed roofing material asphalt shingles manufacturer owens corning brand and model oaleridge color (if cool roof required) sand castle, crrc product id #0890-00 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes replacing roof sheathing with 7 16" osb, 8d nails @ 6" e. N. B. N. & 12" o. C f. N. Note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: June 16, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Addn | Permit status: Issued about to expire | Completion date: July 21, 2017 | Permit id: Pds2017-Resalt- | |||||
Roof nail Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2011-1009-20 |