Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
13 sf re-roof like for like for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingle proposed roofing material asphalt shingle manufacturer owens corning brand and model tru definition duration color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) old roofing completely removed note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2016-Resalt- | |||||
Misc elec - main service panel upgrade for sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 23, 2016 | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 5, 2016 | Permit id: Pds2015-Resalt- | |||||
SCORE 88 13 sf re-roof like for like for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingle proposed roofing material asphalt shingle manufacturer owens corning brand and model tru definition duration color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) old roofing completely removed note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 86 Misc elec - main service panel upgrade for sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 23, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 88 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 5, 2016 | Permit id: Pds2015-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2016-Resalt- |