Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use 1st floor of premises for a carry out coffee shop. Per planning dept.: continue a non- conforming commercial use Permit id: Use2007-00173 | |||||
(use) - use a portion of premises 2nd floor as a gift shop (party favors) Permit id: Use2007-00063 | |||||
Install an exhaust fan on existing 6 hood exhaust 40 cfm as per code. Expiration date: July 13, 2009 | Permit id: Com2009-00823 | |||||
Reinstall stove replaced (3) comp sink with faucet as per code Expiration date: July 16, 2009 | Permit id: Com2009-01135 | |||||
Amend permit # com2004-210 w plan # 2004-1073 to add thrid floor apartment and rooftop deck as per engineer plans. Per bmza 91-05 approved 2 22 05. Separate permit required for electrical mechanical and plumbing work. Expiration date: February 25, 2006 | Permit id: Com2005-00565 | |||||
Tie on to excesting 4" maine and run new pvc pipe to all fixtures tie on to exvesting water maine in house and run new 3 4 copper pipe to all fixtures. Run gas line to furnace and stove also water heater. Expiration date: July 31, 2005 | Permit id: Com2005-02496 | |||||
Amend permit#com2004-210 issued date 11-26-04 with plans#2004-1093 to name electrical contractor as listed above. And add additional 26 ckts and 4 amp Expiration date: May 26, 2005 | Permit id: Com2005-10963 | |||||
Temporary 400amp service for new retail space temporay 2 amp service for new appartment total 600amp Expiration date: October 20, 2005 | Permit id: Com2005-10964 | |||||
Installing heating and air conditioning to building include three separate gas furnace a c systems. Gas piping done by others. Maintain 3 ft setback. Expiration date: October 25, 2005 | Permit id: Com2005-11516 | |||||
Reinstate permit # com2005-11516 for final inspection Expiration date: December 18, 2005 | Permit id: Com2005-35930 | |||||
Reinstate permit # com2005-02496 final inspection Expiration date: December 18, 2005 | Permit id: Com2005-35932 | |||||
Amend permit# com2005-10963 for final inspection only. Expiration date: December 21, 2005 | Permit id: Com2005-36029 | |||||
(use) continue to use 1st floor of premises as a carry-out restaurant. Permit id: Use2010-03842 | |||||
Demolish the entire building except for 4 perimeter masonry walls construct 2 new floors and roof new stairs paritions systems and finishes. Restore existing storefront on lombard st. Contractors will be added to the permit as they are selected in the near future. Amended permit must be obtained to name contractor prior to contruction. Separate permit will be required for tenant fit-out. Per bmza 563-04 approved 11 9 04 Expiration date: May 26, 2005 | Permit id: Com2004-21030 |