New million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: November 4, 2010 | Permit id: 2009-148418-000 | |||||
Revision to trail alignment because of site conditions (steep slope). Permit type: Application | Permit status: Approved | Completion date: July 6, 2012 | Permit id: 2009-148418-Rev | |||||
Revision to preserve trees north of maintenance yard by changing slope of yard area from 2h:1v to 1h:1v by using an engineered reinforced support Permit type: Application | Permit status: Approved | Completion date: September 20, 2012 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Application | Permit status: Approved | Completion date: March 6, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 6, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Process management | Permit status: Closed | Completion date: March 6, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Process management | Permit status: Closed | Completion date: October 2, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Site development | Permit status: Approved | Completion date: March 6, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Life safety | Permit status: Approved | Completion date: March 19, 2014 | Permit id: 2009-148418-Rev | |||||
Revise sheet 642 (by adding 642a ) of permitted set. Details to limit the span between foundation members on the bridges to 6 which was insufficient to span some waterways. The standard details have now been revised to allow for greater spans between support. Bridge locations, lenths and overall spans have not changed. Permit type: Structural | Permit status: Approved | Completion date: March 11, 2014 | Permit id: 2009-148418-Rev | |||||
New maintenance bldg as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: November 4, 2010 | Permit id: 2010-190904-000 | |||||
New mechanical bldg as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: November 4, 2010 | Permit id: 2010-190908-000 | |||||
Vaults (1-5) as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: November 4, 2010 | Permit id: 2010-190923-000 | |||||
New interpretive ctr as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: November 4, 2010 | Permit id: 2010-190924-000 | |||||
Dfs 2: hvac and solar panel skylightsnew interpretive ctr as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: December 18, 2013 | Permit id: 2010-190924-Dfs | |||||
Dfs for bi-fold doors Permit type: Application | Permit status: Approved | Completion date: June 24, 2014 | Permit id: 2010-190924-Dfs | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Application | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Issuance/intake | Permit status: Intake | Completion date: May 5, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Process management | Permit status: Closed | Completion date: May 5, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Process management | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Life safety | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Structural | Permit status: Approved | Completion date: May 15, 2015 | Permit id: 2010-190924-Rev | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Issuance | Permit status: Approved | Completion date: May 20, 2015 | Permit id: 2010-190924-Rev | |||||
Demolish chlorine analyzer building. No basement Permit type: Application | Permit status: Approved | Completion date: February 17, 2012 | Permit id: 2012-113705-000 | |||||
3 new buildings and site work/ add 400-amp service Permit type: Intake | Permit status: Closed | Completion date: March 8, 2012 | Permit id: 2012-119124-000 | |||||
Install (1) 4 amp temporary servicefaxed Permit type: Electrical inspections | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2012-134345-000 | |||||
Install water module display inside the interpretive center Permit type: Application | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Life safety | Permit status: Not reqd | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Fire bureau | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Environmental services | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Transportation | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Parks bureau | Permit status: Approved w/ cond | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
Dfs 1 trusses new maintenance bldg as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: April 11, 2013 | Permit id: 2010-190904-Dfs | |||||
Dfs 2 jib crane new maintenance bldg as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: April 11, 2013 | Permit id: 2010-190904-Dfs | |||||
Dfs 03: seismic anchorage of 7 miscellaneous equipment: hvac fans, electrical unit heater, vehicle exhaust fan, mdp & ic transformer, booster pump and storage tank, hot water heater, generator room layout and seismic. Permit type: Application | Permit status: Approved | Completion date: December 18, 2013 | Permit id: 2010-190904-Dfs | |||||
Dfs 1: skylightsnew interpretive ctr as part of new million gallon drinking water reservoir (powell butte reservoir #2). Permit type: Application | Permit status: Approved | Completion date: April 11, 2013 | Permit id: 2010-190924-Dfs | |||||
Revis1on 1 : revison to type of attachment of rain screen to new interpretive ctr Permit type: Application | Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2010-190924-Rev | |||||
Sanitary, storm, water service, (14) catch basins, (2) backflow preventers and (1) drinking fountain for new powell butte water reservoir #2 Permit type: Intake | Permit status: Closed | Completion date: January 26, 2012 | Permit id: 2012-107455-000 | |||||
6108 lf of 6 perforated cpe foundation drain/underdrain located under new reservoir Permit type: Intake | Permit status: Closed | Completion date: February 22, 2012 | Permit id: 2012-111640-000 | |||||
3 storm line for subdrain/footing drain for new maintenance bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121317-000 | |||||
4 storm line for subdrain/footing drain for new enterpretive center bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121318-000 | |||||
11 storm line for subdrain/footing drain for new reservoir Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121321-000 | |||||
5 storm sewer for subdrain/footing drain for new mechanical bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121322-000 | |||||
Above ground plumbing for maintenance building Permit type: Intake | Permit status: Closed | Completion date: January 15, 2013 | Permit id: 2013-105117-000 | |||||
(11) fixtures for mechanical building at reservoir Permit type: Intake | Permit status: Closed | Completion date: March 6, 2013 | Permit id: 2013-123937-000 | |||||
Install water module display inside the interpretive center Permit type: Application | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Life safety | Permit status: Not reqd | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Fire bureau | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Environmental services | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Transportation | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 12, 2016 | Permit id: 2016-148161-000 | |||||
Install water module display inside the interpretive center Permit type: Parks bureau | Permit status: Approved w/ cond | Completion date: April 19, 2016 | Permit id: 2016-148161-000 | |||||
6108 lf of 6 perforated cpe foundation drain underdrain located under new reservoir Permit type: Intake | Permit status: Closed | Completion date: February 22, 2012 | Permit id: 2012-111640-000 | |||||
3 new buildings and site work add 400-amp service Permit type: Intake | Permit status: Closed | Completion date: March 8, 2012 | Permit id: 2012-119124-000 | |||||
3 storm line for subdrain footing drain for new maintenance bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121317-000 | |||||
4 storm line for subdrain footing drain for new enterpretive center bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121318-000 | |||||
11 storm line for subdrain footing drain for new reservoir Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121321-000 | |||||
5 storm sewer for subdrain footing drain for new mechanical bldg Permit type: Intake | Permit status: Closed | Completion date: March 27, 2012 | Permit id: 2012-121322-000 | |||||
"new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: March 18, 2016 | Current use: Utility | Permit id: 2009-148418-000 | |||||
Nsfr as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." nfpa 13d fire sprinkler system being installed electrical work covered under 12-119124et Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: June 21, 2013 | Current use: Single family dwelling | Permit id: 2010-190896-000 | |||||
New maintenance bldg as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: March 17, 2016 | Current use: Business | Permit id: 2010-190904-000 | |||||
Dfs 1: trusses nsfr detached garage as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: December 31, 2013 | Current use: Garage/carport | Permit id: 2010-190938-000 | |||||
Demo caretakers residence. Demo delay - issue 5-5-11 Client: East Portland Neighborhood Office | Permit type: Demolition | Permit status: Final | Completion date: August 31, 2012 | Current use: Single family dwelling | Permit id: 2011-124710-000 | |||||
New mechanical bldg as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: March 18, 2016 | Current use: Utility | Permit id: 2010-190908-000 | |||||
Vaults (1-5) as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: March 18, 2016 | Current use: Utility | Permit id: 2010-190923-000 | |||||
New interpretive ctr as part of "new million gallon drinking water reservoir (powell butte reservoir #2)." Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: March 18, 2016 | Current use: Business | Permit id: 2010-190924-000 | |||||
Demolish restroom storage building. No basement Client: East Portland Neighborhood Office | Permit type: Demolition | Permit status: Final | Completion date: September 4, 2012 | Current use: Utility | Permit id: 2012-113708-000 | |||||
Kw systemsolar pv panel solar installation of roof top pv system - 6 kva Client: East Portland Neighborhood Office | Permit type: Alteration | Permit status: Final | Completion date: August 26, 2013 | Current use: Business | Permit id: 2013-112487-000 | |||||
Install water module display inside the interpretive center Client: East Portland Neighborhood Office | Permit type: Alteration | Permit status: Final | Completion date: May 17, 2016 | Current use: Business | Permit id: 2016-148161-000 |