Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
"exterior work - demo & replace shingles off existing roof. Replace plywood w/ 3 /4"" as needed. Install 30lb. Layment paper to entire roof & 25 yr shingles. Install flashing pipe collars drip edge ice & water shields valleys to roof. Capping fascia" Permit id: Com2010-19519 | |||||
Exterior work - demo & replace shingles off existing roof. Replace plywood w/ 3 /4" as needed. Install 30lb. Layment paper to entire roof & 25 yr shingles. Install flashing pipe collars drip edge ice & water shields valleys to roof. Capping fascia & doument. Install 67 of gutters. Remove rolled fascia & replace as needed as per code. Notice to proceed awc - no work to be done on towers w/out seperate application - remove and replace roof shingles in-kind on church with the exception of the towers. Remove and replace any rotting plywood under shingles. Install pipe collars and ice and water shields. Cap off 2 fascia boards and install 67 of gutters as per plans submitted to chap. Expiration date: March 10, 2011 | Permit id: Com2010-19519 | |||||
Exterior work - demo & replace shingles off existing roof. Replace plywood w 3 4" as needed. Install 30lb. Layment paper to entire roof & 25 yr shingles. Install flashing pipe collars drip edge ice & water shields valleys to roof. Capping fascia & doument. Install 67 of gutters. Remove rolled fascia & replace as needed as per code. Notice to proceed awc - no work to be done on towers w out seperate application - remove and replace roof shingles in-kind on church with the exception of the towers. Remove and replace any rotting plywood under shingles. Install pipe collars and ice and water shields. Cap off 2 fascia boards and install 67 of gutters as per plans submitted to chap. Expiration date: March 10, 2011 | Permit id: Com2010-19519 |