Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
@ p/h:: remove the existing free standing radiator from top flr p/h. Date: September 5, 2012 Permit type: Gc | Permit id: Ed05672 | |||||
(apt #3l) at bedroom: install (1) new approved window guard at front room window #2. Date: November 27, 2007 Value: $132 Permit type: Gc | Permit id: E813314 | |||||
Apt 3r) at kitchen and bedroom#2 : re-install (1 each rooms) window guard and stops. Remove all work related debris. Date: September 20, 2007 Value: $107 Permit type: Gc | Permit id: E807248 | |||||
Apt 3l) at kitchen : re-install (1) window guard and stops, and at bedroom#2 install (1) missing stops. Remove all work related debris. Date: September 20, 2007 Value: $107 Permit type: Gc | Permit id: E807243 | |||||
@ p h:: remove the existing free standing radiator from top flr p h. Date: September 5, 2012 Permit type: Gc | Permit id: Ed05672 | |||||
SCORE 96 Fence Date: July 12, 2017 Contractor: Transilvania Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 32161683601 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: January 23, 2002 Permit type: Delead | Permit id: E213224 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: May 10, 2002 Permit type: Delead | Permit id: E219882 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: January 27, 2005 Permit type: Delead | Permit id: E519451 |