Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 739853 | |||||
Pre-construction meeting required contact mc. Dps inspector adam curtin @ 301-370-3688 install a roof/sump pump drain within the county right of way with the following conditions: place a maximum 4" diameter pvc drainage pipe into a 18" rcp. Roof/sump pump drain will be connected into the county storm drain structure or pipe as directed by the dps inspector. Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 229360 | |||||
Place one 6" and one 8" pipe into the storm drain. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 224856 |