Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Replace existingsingle paneled aluminum windows with double panel vinyl replacement windows. 15 windows will be replaced on 2nd and 3rd floor front and 1st 2nd and 3rd floors in the rear as per code. Per chap: replace deteriorated second story cement asn Permit id: Com2009-11651 | |||||
Replace existingsingle paneled aluminum windows with double panel vinyl replacement windows. 15 windows will be replaced on 2nd and 3rd floor front and 1st 2nd and 3rd floors in the rear as per code. Per chap: replace deteriorated second story cement asnd wood window sills as needed with new marble sills to match replacements; replace 15 deteriorated windows on second and third floors with dual or triple glazed windows (vinyl) in "beige" finish. Expiration date: November 20, 2009 | Permit id: Com2009-11651 |