Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building-330864 Permit type: Electrical permit | Permit status: Finaled | Completion date: September 2, 2004 | Current use: Single family dwelling | Permit id: 340448 | |||||
2-bonding and wiring for underground pool and hottub Permit type: Electrical permit | Permit status: Issued | Current use: Swimming pool | Permit id: 409649 | |||||
Per applicant- exact replacement Permit type: Mechanical permit | Permit status: Finaled | Completion date: June 23, 2015 | Current use: Single family dwelling | Permit id: 716852 | |||||
Inground pool - refer back #336287 Permit type: Building residential | Permit status: Issued | Current use: Swimming pool | Permit id: 401030 | |||||
Alteration of basement & family room and 2fl add Permit type: Building residential | Permit status: Finaled | Completion date: September 2, 2004 | Current use: Single family dwelling | Permit id: 330864 | |||||
Mechanical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 344708 | |||||
Dw permit: construct the following type driveways in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 03 Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 245272 | |||||
Replacegas service in accordance with washington gas plan no. 302613. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 314899 |