Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electrical Date: August 29, 2011 Contractor: Marvin Hatch Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-90000-183 | |||||
SCORE 98 Electrical Date: August 2, 2011 Contractor: George Wagner Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-90000-161 | |||||
SCORE 93 Elevator Date: February 9, 2011 Contractor: Luz Garibay Permit status: Issued | Current use: Commercial | Permit id: 11046-90000-001 | |||||
SCORE 98 Electrical Date: July 31, 2012 Contractor: George Wagner Permit status: Issued | Current use: Commercial | Permit id: 12041-90000-178 | |||||
SCORE 100 Hot water piping supports Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 12016-20000-146 | |||||
Electrical Date: March 22, 2011 Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-056 | |||||
SCORE 93 Electrical Date: August 12, 2011 Contractor: Keith Pengilley Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-90000-170 | |||||
SCORE 56 Plan check power for installaing new branch ckts and replacing existin Date: March 3, 2011 Contractor: Larry Borland Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-20000-249 | |||||
Elevator Date: September 21, 2010 Permit status: Permit finaled | Current use: Apartment | Permit id: 10046-10000-010 | |||||
SCORE 100 Elevator Date: September 29, 2010 Contractor: Tim Varbel Permit status: Issued | Current use: Commercial | Permit id: 10046-90000-010 | |||||
SCORE 73 Extend pad & restripe service zone Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-20000-227 | |||||
SCORE 100 Plumbing Date: November 9, 2011 Contractor: Rex Horney Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-90000-198 | |||||
SCORE 100 Electrical Date: October 19, 2010 Contractor: Dokhi Behnam Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-207 | |||||
SCORE 96 Hvac Date: August 7, 2013 Contractor: Amy Emett Permit status: Permit finaled | Current use: Commercial | Permit id: 12044-20001-076 | |||||
SCORE 100 Electrical Date: December 19, 2013 Contractor: Marvin Hatch Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-90000-354 | |||||
SCORE 68 Install (1) new, on-site, illuminated, double-sided, pole sign (l9) @ Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-20000-030 | |||||
SCORE 82 Replace and rebalance the existing hot water piping and branches to im Date: June 18, 2013 Contractor: Kc Morrow Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-20000-134 | |||||
SCORE 100 Elevator Date: April 29, 2014 Contractor: Mary Ortega Permit status: Permit finaled | Current use: Commercial | Permit id: 14046-90000-006 | |||||
SCORE 98 Electrical Date: August 7, 2015 Contractor: Gabriel Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-256 | |||||
SCORE 96 Pc for power for dermatologist facility. The scope of work is based on Date: November 13, 2015 Contractor: My Vuong Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-263 | |||||
SCORE 96 Plan check for power only; scope includes (1) new circuit for exam roo Date: November 13, 2015 Contractor: My Vuong Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-289 | |||||
SCORE 98 Electrical Date: April 5, 2016 Contractor: Gabriel Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-117 | |||||
SCORE 100 Electrical Date: May 21, 2015 Contractor: Sean Permit status: Issued | Current use: Commercial | Permit id: 15041-20000-156 | |||||
SCORE 86 Installation of a chained-hydro wheelchair lift located at exterior of Date: January 7, 2016 Contractor: Bill Ossandon Permit type: Elevator | Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-000 | |||||
SCORE 65 Site grading for new drainage, landscaping and fencing of the existing Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 15030-10000-077 | |||||
SCORE 68 Install (1) new, on-site, illuminated, double-sided projecting sign (n Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-20000-029 | |||||
SCORE 59 Upgrade and replacement of existing systems/equipment. Existing ductwo Date: June 18, 2013 Contractor: Ed Bacic Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 12044-20000-076 | |||||
SCORE 99 Install (1) new, on-site, illuminated, double-sided pole sign (f8) @ 2 Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 14048-20000-005 | |||||
SCORE 99 Supplemental to permit 17020-10000-00116 to revise details and locatio Date: November 9, 2017 Contractor: James Matthews Permit status: Issued | Current use: Commercial | Permit id: 17020-10001-001 | |||||
SCORE 63 Grading for permit 17020-10000-00116 "concrete pads for the installati Permit status: Issued | Current use: Commercial | Permit id: 17030-10000-080 | |||||
SCORE 72 Supplemental to permit 17030-10000-08046 to replace existing storm dra Date: November 28, 2017 Contractor: J Matthews Permit status: Issued | Current use: Commercial | Permit id: 17030-10001-080 | |||||
SCORE 89 Date: November 28, 2017 Contractor: Wachs Electric Permit status: Issued | Current use: Special equipment | Permit id: 17041-20000-427 | |||||
SCORE 95 High pressure gas system for fuel cell generator. Date: October 24, 2017 Contractor: Jennifer Horta Permit status: Issued | Current use: Commercial | Permit id: 17042-10000-008 | |||||
SCORE 95 Concrete pads for the installation of fuel cell genertors ( es1- thru Permit status: Issued | Current use: Commercial | Permit id: 17020-10000-001 | |||||
SCORE 100 Date: May 31, 2017 Contractor: Rex Horney Permit status: Permit finaled | Current use: Commercial | Permit id: 17042-90000-122 | |||||
SCORE 65 Supplemental to permit #15030-10000-07794 for revisions to site gradin Date: June 28, 2017 Contractor: Philip Griffen Permit status: Permit finaled | Current use: Commercial | Permit id: 15030-10001-077 | |||||
SCORE 98 Date: April 5, 2016 Contractor: Gabriel Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-117 | |||||
SCORE 65 Site grading for new drainage, landscaping and fencing of the existing Permit status: Permit finaled | Current use: Commercial | Permit id: 15030-10000-077 | |||||
SCORE 98 Date: August 7, 2015 Contractor: Gabriel Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-256 | |||||
SCORE 96 Date: August 7, 2013 Contractor: Amy Emett Permit status: Permit finaled | Current use: Commercial | Permit id: 12044-20001-076 | |||||
SCORE 100 Date: December 19, 2013 Contractor: Marvin Hatch Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-90000-354 | |||||
SCORE 68 Install (1) new, on-site, illuminated, double-sided, pole sign (l9) @ Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-20000-030 | |||||
SCORE 82 Replace and rebalance the existing hot water piping and branches to im Date: June 18, 2013 Contractor: Kc Morrow Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-20000-134 | |||||
SCORE 100 Date: April 29, 2014 Contractor: Mary Ortega Permit status: Permit finaled | Current use: Commercial | Permit id: 14046-90000-006 | |||||
SCORE 68 Install (1) new, on-site, illuminated, double-sided projecting sign (n Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-20000-029 | |||||
SCORE 59 Upgrade and replacement of existing systems equipment. Existing ductwo Date: June 18, 2013 Contractor: Ed Bacic Permit status: Permit finaled | Current use: Commercial | Permit id: 12044-20000-076 | |||||
SCORE 96 Pc for power for dermatologist facility. The scope of work is based on Date: November 13, 2015 Contractor: My Vuong Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-263 | |||||
SCORE 96 Plan check for power only; scope includes (1) new circuit for exam roo Date: November 13, 2015 Contractor: My Vuong Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-289 | |||||
SCORE 95 Date: January 24, 2017 Contractor: Simplexgrinnell Lp Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-023 | |||||
SCORE 99 Install (1) new, on-site, illuminated, double-sided pole sign (f8) @ 2 Permit status: Permit finaled | Current use: Onsite | Permit id: 14048-20000-005 | |||||
SCORE 86 Installation of a chained-hydro wheelchair lift located at exterior of Date: January 7, 2016 Contractor: Bill Ossandon Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-000 | |||||
SCORE 100 Date: May 21, 2015 Contractor: Sean Permit status: Permit expired | Current use: Commercial | Permit id: 15041-20000-156 |