Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: September 24, 2014 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 562751 | |||||
Alteration permit Date: September 25, 2014 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 555915 | |||||
Electrical permit Date: June 21, 2010 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 284729 | |||||
Plumbing permit Date: September 29, 2014 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 563002 | |||||
Zoning use permit Date: October 3, 2014 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 556249 | |||||
Alteration permit Date: May 8, 2013 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 421775 | |||||
Mechanical permit Date: March 23, 2015 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 581870 | |||||
Alteration permit Date: April 29, 2011 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 338317 | |||||
Plumbing permit Date: January 23, 2015 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 583792 | |||||
Suppression permit Date: April 8, 2015 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 590287 | |||||
Alteration permit Date: March 27, 2012 Client: Tro Avenue Of The Arts Lp | Permit status: Completed | Permit id: 382578 | |||||
Electrical permit Date: February 6, 2015 Client: Tro Avenue Of The Arts Lp | Permit status: Expired | Permit id: 588363 | |||||
On 05 19 2015, the department of licenses and inspections issued a notice of refusal for application #609604. Date: May 21, 2015 Client: Tro Avenue Of The Arts Lp | Applicant: Deidre Deascanis, Aia | Permit type: Appeal | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 25204 | |||||
SCORE 100 Replace bth 250a-1 and installed tta-42 expansion tank Date: April 2, 2014 Contractor: Mr Ds Plumbing And Heating Client: Tro Avenue Of The Arts Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 527969 | |||||
SCORE 95 For renovation to existing sprinkler system on the 17th and 18th floor of an existing building, sprinkler system serviced by an existing 6 inch fire service with an existing backflow preventer assembly and existing fire pump. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13. Separate permits required for electrical and plumbing work. Date: June 12, 2015 Contractor: S A Comunale Co Inc Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit type: Suppression permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 608208 | |||||
SCORE 95 For alterations to existing nfpa 13 fire suppression sytem as per plans. No changes to existing stanpipe or fire pump. Date: April 8, 2015 Contractor: S A Comunale Co Inc Client: Tro Avenue Of The Arts Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 590287 | |||||
SCORE 100 Ground floor lobby & 4th thru 8th floors - furnish and install (877) work area outlets consisting of cat6 telecommunications cable - the installation will comply with the 2008 nec Date: February 6, 2015 Contractor: Charles H Macdonald Electric I Client: Tro Avenue Of The Arts Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: February 6, 2015 | Permit id: 588363 | |||||
SCORE 100 Install pedestrian protection scaffolding as per plan Date: December 29, 2014 Contractor: Safway Services Llc Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 581831 | |||||
SCORE 100 4th through 18th floor complete plumbing system per submitted drawing and to comply with the philadelphia plumbing code 2004 - 256 water closets, 256 lavatories, 217 kitchen sinks, 207 tubs, showers, floor drains, 217 washer boxes Date: January 23, 2015 Contractor: E J Raith Mechanical Inc Client: Tro Avenue Of The Arts Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 583792 | |||||
Level iii alterations [no change in occupancy classification] to the residential lobby at the ground floor and (217) new apartments on the 4th through 17th floors, to include the erection of an infill addition on the 5th through 17th floors with decks at each level, and the addition of an 18th floor roof deck as per approved plans. Work complies with performance compliance method of chapter 34 of 2009 ibc. Building to be fully sprinklered. Asbestos abatement required prior to commencement of work. Separate permits required for mep & fire suppression Date: November 17, 2014 Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: September 16, 2016 | Permit id: 566045 | |||||
SCORE 89 Patch point brick as needed and cauld where needed for dormitory. Date: April 29, 2011 Contractor: William Proud Restoration Co Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 15, 2012 | Permit id: 338317 | |||||
SCORE 100 Adding addl spks in apt brs to obtain proper audible levels, perform existing mods to existing system as indicated on print,as per nfpa-72. This work has been reviewed by ralph dipietro of l&i,this is a 17 sty bldg with retail on 1st mezz lvls(cc dist) Date: June 21, 2010 Contractor: Cobra Electric Client: Tro Avenue Of The Arts Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2010 | Permit id: 284729 | |||||
SCORE 100 New distribution,lighting,branch wiring and fire alarm per 2008 nec & nfpa 72 (mixed use) Date: June 17, 2015 Contractor: Dougherty Electric Inc Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit type: Electrical permit | Permit status: Completed | Completion date: June 1, 2016 | Permit id: 585413 | |||||
SCORE 95 For the installation of the existing mechanical system and for the installation of a new system to include: registers diffusers, exhaust supply fans, split systems, cooling tower, roof top energy recovery unit, heat pumps, packaged roof top units, and boilers. Separate permits required for tank, suppression system, plumbing and electrical. All work per approved plans. Date: March 23, 2015 Contractor: Falasca Mechanical Inc Client: Tro Avenue Of The Arts Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 581870 | |||||
SCORE 95 For level ii alterations to existing residential unit on the third floor level. Alterations to include the erection of non bearing parition walls, provide furnishings and finishes throughout. All work to be done per approved plans. Separate permits required for mechanical, electrical. Plumbing and fire supression work. Date: September 25, 2014 Contractor: Irwin And Leighton Inc Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 555915 | |||||
SCORE 100 Demoliton of non-load bearing walls in apartment building - floors 4 thru 17 Date: September 24, 2014 Contractor: Hunter Roberts Construction Gr Client: Tro Avenue Of The Arts Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 562751 | |||||
SCORE 100 3rd floor interior plumbing alterations - install (2)new countertop sinks and connect to existing utilities Date: September 29, 2014 Contractor: Eagle Mechanical Inc Client: Tro Avenue Of The Arts Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 18, 2014 | Permit id: 563002 | |||||
SCORE 100 For the construction of a shelter platform. All work shall comply with the approved plans. All work shall be performed by a contractor licensed by the city of philadelphia. Date: May 8, 2013 Contractor: Superior Scaffold Services Inc Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: April 27, 2015 | Permit id: 421775 | |||||
For the erection of an addition (infill) on the 5th through 17th floor and for the addition of an 18th floor and a roof deck at the 18th floor level. Size and location shown on application plans. For use as a sit-down restaurant on the 1st floor and multi-family household living (two-hundred seventeen (217) total) on the 4th-17th floors. Residential amenities and lobby on the 1st, 4th & 18th floors. Mezzanine level, 2nd and 3rd floors vacant space (use registration permit required prior to occupancy). No signs on this application. Date: October 3, 2014 Client: Tro Avenue Of The Arts Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 3, 2014 | Permit id: 556249 | |||||
Erect exterior shelter platform as per engineers plans for facade inspection for no more than days. 40feet on chestnut st. & feet on s. Broad st. Date: March 27, 2012 Client: Tro Avenue Of The Arts Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: May 2, 2013 | Permit id: 382578 | |||||
Amend permit number 566045 to protect an existing thirteen (13) story interior shaft with storefront glazing wall and sprinkler water curtain, on one side only, in lieu of required 2 hour rated shaft enclosure as per approved plans and bbs variance no. 25204. Glazed opening as prescribed in icc-es evaluation report esr-2397, except that the pony wall at the base of the glazed opening shall not be required per bbs. Date: June 8, 2016 Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit type: Administrative permit | Permit status: Completed | Completion date: June 17, 2016 | Permit id: 609604 | |||||
Suppression permit Date: June 12, 2015 Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit status: Completed | Permit id: 608208 | |||||
Electrical permit Date: June 17, 2015 Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit status: Completed | Permit id: 585413 | |||||
Administrative permit Date: June 8, 2016 Client: Avenue Of The Arts Owner Lp | Client Company: Mrp Realty | Permit status: Completed | Permit id: 609604 |