Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 01-07-063 | Parcel: 067135008000 | |||||
Permit id: 02-04-002 | Parcel: 067135008000 | |||||
Permit id: 04-09-272 | Parcel: 067135008000 | |||||
Permit id: 08-09-058 | Parcel: 067133001000 | |||||
Permit id: 09-08-036 | Parcel: 067133001000 | |||||
Permit id: 10-04-077 | Parcel: 067133001000 | |||||
Permit id: 11-03-037 | Parcel: 067135008000 | |||||
Permit id: 12-10-058 | Parcel: 067133001000 | |||||
Permit id: 13-01-143 | Parcel: 067133001000 | |||||
Permit id: 99-04-056 | Parcel: 067135008000 | |||||
On-site modification of parking lot which includes ada, cross slopes, path of travel to sidewalk and striping. Squeeze inn ada upgrade-parking lot only Permit id: 11-0072 | Parcel: 067135008000 | |||||
Relocate monument signs verify that the signs and electrical are outside the pue. Permit id: 12-0293 | Parcel: 067133001000 | |||||
Office to office ti Permit id: 02-3384 | |||||
Fire sprinkler systemfinaled - no building file attached to this permit, no fees collected, nothing in street file, opted to final this permit - 08 08 2006 jd Permit id: 03-0042 | Parcel: 067135008000 | |||||
Wo#150 us- & harbor interchange improvement project. Permit issued for the construction of harbor interchange project for work in the areas of harbor blvd and beacon blvd. Permit for work is contingent upon receiving and approval of traffic control plan in the intersection of evergreen ave and harbor blvd. Intersection. 9 24 09... Amendment: relocate 1 of the 8" watermain and lower of the 12" underground storm drain on harbor blvd on beacon blvd. A pre-construction meeting is requir Permit id: 09-0235 | Parcel: 067135008000 | |||||
Wo#99022. Pg&e pm#30559934. Relocate underground facilities per caltrans request for the harbor boulevard interchange improvement project. Traffic control plan for harbor blvd have been received and approved by traffic engineering 11 2 2009; 5 3 10, tcp for evergreen ave have been received and approved. (project is related to wo#15070)a pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection Permit id: 09-0241 | Parcel: 067133001000 | |||||
SCORE 95 W. O. 150 relocate fdc within right-of-way due to road realignmentsee additional notes on approved plans regarding site restoration. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 10-0151 | Parcel: 067133001000 | |||||
Tenant improvement -restaurant to restaurant 2,256sf (squeeze inn) Permit id: 11-0059 | Parcel: 067135008000 | |||||
SCORE 100 Verify the footing of the sign is behind the pue. Used site plan provided by owner. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Monument sign- sq ft Permit id: 11-0087 | Parcel: 067135008000 | |||||
On-site modification of sewer line squeeze inn Permit id: 11-0179 | Parcel: 067135008000 | |||||
Permit id: 12-09-014 | Parcel: 067135008000 | |||||
SCORE 56 Scope of work is the installation of a grease interceptor. 16 sf restaurant to restaurant t. I. Permit id: 12-0239 | Parcel: 067135008000 |