Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Non structural alterations: remove and replace tile floor and drywalls around tub down to stud relocate bathroom door to an existing opening. Elec: relocate switches install shower light. Plumbing: 2nd floor hallway bathroom pull vanity and rest vanity with new faucet replace tub and shower faucet and bathtub stayed as is pulled toilet and rest as per code. Expiration date: January 22, 2017 | Permit id: Com2016-18868 |