Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 11, 2008 Permit type: Delead | Permit id: E908508 | |||||
As per rc #2005001338401 (enviro-probe, inc.), perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: April 5, 2005 Permit type: Delead | Permit id: E526910 | |||||
Perform integrity test to the gas line of entire building and recommend needed repairs. (45 apartments). Note: contractor must contact hpd @ (718) Date: December 12, 2008 Permit type: Plumb | Permit id: E918966 | |||||
As per rc #2004000522203 (enviro-probe inc), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: September 28, 2004 Permit type: Delead | Permit id: E509060 | |||||
As per rc #2005001338401 (enviro-probe inc), perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: November 15, 2004 Permit type: Delead | Permit id: E512454 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: May 7, 2014 Permit type: Delead | Permit id: Ee23413 | |||||
1st story public hall - west section stair - s/i marble intermediate landing at 1st story public hall stair at west section. Remove all work rela Date: April 13, 2009 Permit type: Gc | Permit id: E934342 | |||||
SCORE 100 Equipment work Date: February 8, 2011 Contractor: Star Industrial Serv Co Permit status: Permit issued | Permit id: 12060325801 | |||||
SCORE 70 Equipment work Date: December 21, 1998 Contractor: Star Industrial Svc Co Permit status: Permit issued | Permit id: 10222532501 | |||||
SCORE 100 Equipment work Date: September 21, 2007 Contractor: Master Fire Prevention System Permit status: Permit issued | Permit id: 10489343901 | |||||
SCORE 68 Plumbing Date: December 31, 1991 Contractor: Griesel Plumbing And Heating Corp Permit status: Permit issued | Permit id: 10028732401 | |||||
SCORE 56 Alteration Date: November 7, 1991 Contractor: Hectors Construction Inc Permit status: Permit issued | Permit id: 10028732401 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach one gallon of water. A detergent such as tri- Date: March 20, 2003 Permit type: Gc | Permit id: E318422 | |||||
SCORE 100 Plumbing Date: September 4, 2013 Contractor: Mps Plumbing And Heating In Permit status: Permit issued | Permit id: 14009819601 | |||||
1st story public hall - west section stair - s i marble intermediate landing at 1st story public hall stair at west section. Remove all work rela Date: April 13, 2009 Permit type: Gc | Permit id: E934342 | |||||
Public area; bulkhead (both east & west section) properly repair with similar material the broken defective ceilings at bulkhead (both east & west) Date: August 30, 2017 Permit type: Gc | Permit id: Ei02121 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: September 24, 2015 Permit type: Delead | Permit id: Eg04427 | |||||
(apt. #5f) at north (4): trace and repair the source of water leak and loose plaster. At north (4): ceiling 2 sq. Ft. Demolish and repair all Date: February 15, 2008 Permit type: Gc | Permit id: E822413 | |||||
As per rc #2004000522203 (enviro-probe inc), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: September 23, 2004 Permit type: Delead | Permit id: E508728 |