| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Original permit description:(com2007-09315)total rewire upgrade service to 1 amp 25 circuits low voltage as per code Permit id: Com2009-09781 | |||||
Install 1-90% gas furance 1-2 ton a/c with supply and return ducctwork rough-in for 2 full 1 half bath 1-kitchen 1-laundry gas to furance stove dryer. All as per code. Permit id: Com2008-02264 | |||||
Request for time extension on prmit com2006-33354. Issued on 11/2/06 with original completion date of 05/02/07original permit description:(com2006-33354)interior to include removal and replacement of ceilings walls windows floors doors entire kitchen Permit id: Com2007-19350 | |||||
Permit id: Com2007-15330 | |||||
Total rewire upgrade service to 1 amp 25 circuits low voltage as per code Permit id: Com2007-09315 | |||||
Remove paint from front cut n point brick asper code. Permit id: Com2007-01798 | |||||
Interior to include removal and replacement of ceilings walls windows floors doors entire kitchen and bathroom cabinets and fixtures also 2x4 framing remove exterior formstone. All as per code. Permit id: Com2006-33354 | |||||
Request for time extension on prmit com2006-33354. Issued on 11/2/06 with original completion date of 05/02/07original permit description:(com2006-33354)interior to include removal and replacement of ceilings walls windows floors doors entire kitchen and bathroom cabinets and fixtures also 2x4 framing remove exterior formstone. All as per code. Expiration date: December 19, 2007 | Permit id: Com2007-19350 | |||||
Use as a single family dwelling Permit id: Use2016-00664 | |||||
Request for time extension on prmit com2006-33354. Issued on 11 2 06 with original completion date of 05 02 07original permit description:(com2006-33354)interior to include removal and replacement of ceilings walls windows floors doors entire kitchen and bathroom cabinets and fixtures also 2x4 framing remove exterior formstone. All as per code. Expiration date: December 19, 2007 | Permit id: Com2007-19350 | |||||
Install 1-90% gas furance 1-2 ton a c with supply and return ducctwork rough-in for 2 full 1 half bath 1-kitchen 1-laundry gas to furance stove dryer. All as per code. Expiration date: July 25, 2008 | Permit id: Com2008-02264 |