Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Application for authorization to raze building by dismantling including barricades shoring propping clearing of premises and rebuilding or refinishing adjoining building wall as directed by building inspector. All debris removed from site must be deposited at an approved landfill area. Epa regulations must be met and rat-proofed per code. Building last used for commercial. Expiration date: March 27, 2017 | Permit id: Dem2016-00500 | |||||
Repair and relocate existing plumbins rough-in. Make connection to new sewer service. Install new toilet valatory utility sink washing machine box and water heater. As per code Expiration date: December 30, 2009 | Permit id: Com2009-15105 | |||||
Install new front door. No structural work. Expiration date: July 27, 2006 | Permit id: Com2006-03045 | |||||
Interior fit out as per plans and per code. Separate permit required for sprinkler system. Expiration date: October 19, 2006 | Permit id: Com2006-09413 |