| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New 104, 255 sq ft middle school with new athletic field and parking. School is separated into three attached building areas. See permit 13-1442 co for demolition of existing school (demo in two phases). Permit type: Application | Permit status: Approved | Completion date: February 25, 2013 | Permit id: 2013-115738-000 | |||||
Dfs- precast structural concrete Permit type: Application | Permit status: Approved | Completion date: August 16, 2013 | Permit id: 2013-115738-Dfs | |||||
Dfs for cold-formed metal framing Permit type: Application | Permit status: Approved | Completion date: September 20, 2013 | Permit id: 2013-115738-Dfs | |||||
Dfs 03 - brick veneer concealed lintel system Permit type: Application | Permit status: Approved | Completion date: October 6, 2014 | Permit id: 2013-115738-Dfs | |||||
Dfs 04-suspended ceilings Permit type: Application | Permit status: Approved | Completion date: October 6, 2014 | Permit id: 2013-115738-Dfs | |||||
Dfs 05- steel joist framing Permit type: Application | Permit status: Approved | Completion date: October 6, 2014 | Permit id: 2013-115738-Dfs | |||||
Dfs 06- attachment of equipment, mep and food service Permit type: Application | Permit status: Approved | Completion date: October 7, 2014 | Permit id: 2013-115738-Dfs | |||||
Dfs 07 - curtainwalls and storefronts Permit type: Application | Permit status: Approved | Completion date: October 7, 2014 | Permit id: 2013-115738-Dfs | |||||
Dfs 08 - skylights Permit type: Application | Permit status: Approved | Completion date: October 8, 2014 | Permit id: 2013-115738-Dfs | |||||
Two 11-6 type 1 hoods, dw hood, one kiln hood, 70 cfm science room exhaust, gym 66 cfm hrv w/hw coil, two 45t, one 20t, one 15t & one 7. 5t gas packs w/vsd, one 27t, 25t, 10t packaged heat pumps, five 2-t ductless splits, one 10t hw-split, two 10 mbh condensing boiler, pumps, tus w/hw reheat, genset, Permit type: Intake | Permit status: Closed | Completion date: February 25, 2013 | Permit id: 2013-115741-000 | |||||
Demo existing middle school to be replaced with new middle school (see 13-115738 co for new school). Demolition in two phases. Phase 1 - classroom wing and locker room summer 2013. Phase 2 - rest of demolition after new school is built. Decommissioning required. Call for inspection 842 prior to final. Permit type: Application | Permit status: Approved | Completion date: May 1, 2013 | Permit id: 2013-144270-000 | |||||
Parkrose middle school Permit type: Intake pw | Permit status: Assigned | Completion date: June 20, 2013 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Pre-design pw | Permit status: Not reqd | Completion date: June 19, 2013 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Pre-design pw | Permit status: Received | Completion date: June 19, 2013 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Pre-design pw | Permit status: Not reqd | Completion date: May 11, 2014 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Pre-design pw | Permit status: Billed | Completion date: June 20, 2013 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Bond/insurance pw | Permit status: Approved | Completion date: July 16, 2013 | Permit id: 2013-170670-000 | |||||
Parkrose middle school Permit type: Pre-issuance pw | Permit status: Signed | Completion date: July 16, 2013 | Permit id: 2013-170670-000 | |||||
317 fixtures for interior plumbing for new school; backflow preventer Permit type: Intake | Permit status: Closed | Completion date: June 26, 2013 | Permit id: 2013-172332-000 | |||||
Electrical and low voltage for new school Permit type: Intake | Permit status: Closed | Completion date: June 27, 2013 | Permit id: 2013-173025-000 | |||||
Low voltage controls for hvac systems Permit type: Electrical inspections | Permit status: Approved | Completion date: October 3, 2014 | Permit id: 2013-185200-000 | |||||
Concrete pump, concrete trucks (back-up alarms) Permit type: Intake | Permit status: Complete | Completion date: July 26, 2013 | Permit id: 2013-185635-000 | |||||
Storm line at baseball field, 720feet storm sewer and 6catch basins Permit type: Intake | Permit status: Closed | Completion date: August 16, 2013 | Permit id: 2013-194082-000 | |||||
New school site work - storm Permit type: Intake | Permit status: Closed | Completion date: August 20, 2013 | Permit id: 2013-195155-000 | |||||
Underground - install underground fire supply line for new school Permit type: Intake | Permit status: Approved | Completion date: August 20, 2013 | Permit id: 2013-195193-000 | |||||
Solar/pv panel solar - new 51kw roof mounted pv array on gym roof Permit type: Application | Permit status: Approved | Completion date: September 24, 2013 | Permit id: 2013-208836-000 | |||||
Alarm - provide and install new fire alarm system in new school Permit type: Intake | Permit status: Approved | Completion date: October 2, 2013 | Permit id: 2013-211891-000 | |||||
Sprinkler - add new wet & dry systems to fully protect new building (see u/g permit 13-195193fs) Permit type: Intake | Permit status: Approved | Completion date: November 13, 2013 | Permit id: 2013-227261-000 | |||||
Installation of 100w (small wind turbine) Permit type: Intake | Permit status: Closed | Completion date: January 22, 2014 | Permit id: 2014-108326-000 | |||||
Installation of intrusion security and access control devices in the new middle school. Permit type: Electrical inspections | Permit status: Approved | Completion date: March 25, 2015 | Permit id: 2014-113905-000 | |||||
Fixed system-ansul r-102 system pre-piped connect & certify Permit type: Intake | Permit status: Approved | Completion date: February 10, 2014 | Permit id: 2014-114927-000 | |||||
Limited energy - paging systemparkrose middle school Permit type: Electrical inspections | Permit status: Approved | Completion date: March 25, 2015 | Permit id: 2014-130727-000 | |||||
Install refrigeration equipment for walk in cooler and walk in freezerwalk-in cooler/freezer under separate permit Permit type: Intake | Permit status: Closed | Completion date: May 29, 2014 | Permit id: 2014-162784-000 | |||||
Alarm - install new das system for new school building Permit type: Intake | Permit status: Approved | Completion date: September 2, 2014 | Permit id: 2014-206119-000 | |||||
Pbot limited pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: November 14, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Bond/insurance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Connect monument sign to existing electrical Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-219744-000 | |||||
Add exterior stairs for egress Permit type: Application | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Planning and zoning | Permit status: Not reqd | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Life safety | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Fire bureau | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Transportation | Permit status: Not reqd | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Adding 1 new low voltage control panel Permit type: Electrical inspections | Permit status: Approved | Completion date: August 19, 2015 | Permit id: 2015-216465-000 | |||||
Branch circuits for hvac required modification Permit type: Electrical inspections | Permit status: Approved | Completion date: August 20, 2015 | Permit id: 2015-219745-000 | |||||
Temporary power for future construction Permit type: Electrical inspections | Permit status: Approved | Completion date: August 20, 2015 | Permit id: 2013-163972-000 | |||||
Preliminary efforts (underground) for new construction project under plan review (refer # 13-173025)faxed. Permit type: Electrical inspections | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2013-174442-000 | |||||
Pbot limited pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: November 14, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Bond/insurance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Add exterior stairs for egress Permit type: Application | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Planning and zoning | Permit status: Not reqd | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Life safety | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Fire bureau | Permit status: Approved | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Add exterior stairs for egress Permit type: Transportation | Permit status: Not reqd | Completion date: September 28, 2004 | Permit id: 2004-050921-000 | |||||
Pbot limited pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: November 14, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Bond/insurance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Pbot limited pw permit Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: September 2, 2014 | Permit id: 2014-206625-000 | |||||
Installation of a 1792 sq. Ft. Temporary modular that includes two classrooms to allow construction activities associated with new school Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: August 7, 2013 | Current use: Educational | Permit id: 2013-133398-000 | |||||
Installation of 1792 sq. Ft. Temporary modular with two classrooms to allow constuction activities associated with new school Client: East Portland Neighborhood Office | Permit type: New construction | Permit status: Final | Completion date: August 7, 2013 | Current use: Educational | Permit id: 2013-133403-000 | |||||
Solar pv panel solar - new 51kw roof mounted pv array on gym roof Client: East Portland Neighborhood Office | Permit type: Alteration | Permit status: Final | Completion date: August 21, 2014 | Current use: Educational | Permit id: 2013-208836-000 | |||||
Ti upgrade classrooms 401 thru 404 plus 1403 Client: East Portland Neighborhood Office | Permit type: Alteration | Permit status: Final | Completion date: September 21, 2004 | Current use: Educational | Permit id: 2004-023372-000 |