Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Re-roof from comp to shingle hra your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: September 13, 2013 | Permit id: Pds2013-Resalt- | |||||
Re-roof from comp to shingle your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 13, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 74 Re-roof from comp to shingle your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 13, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2013-Resalt- |