Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pool in ground Permit type: Building residential permit | Permit status: Finaled | Current use: Swimming pool | Permit id: 653170 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 765178 | |||||
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 680630 | |||||
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 718314 | |||||
Mechanical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 768913 | |||||
Under the pavement cut moratorium until 10/21/16. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Install gas service in accordance with washington gas plan no. 461193. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 329091 | |||||
Kitchen remodel Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 760110 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. 9/30/2015 extension approved to 06/18/2016. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 303947 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Current use: Swimming pool | Permit id: 697199 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Issued | Current use: Retaining wall | Permit id: 714753 | |||||
Inground pool and pool house Permit type: Building residential permit | Permit status: Finaled | Current use: Swimming pool | Permit id: 665301 |