Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Original permit description:(com2015-08161)all ductwork with 72 0 btu gas furnae and 2 1/2 ton a/c and 2 ton heatpump and 2 ton air handler as per code. Gas by others. Permit id: Com2015-26193 | |||||
Original permit description:(com2015-07799)rough in water & waste for 2. 5 bathrooms wet bar - (1) kitchen and laundry - rough to gas for (1) furnace ( 0 btu and (1) range 0 btu. (11) plumbing fixtures - install (1) gal. Electric water heater Permit id: Com2015-25602 | |||||
Install wiring for new sfd. Install new 2 amp service install 5 smoke and 1 co2 install light fixtures install 24 ckts install 6 low voltage ckts as per code. Permit id: Com2015-09780 | |||||
All ductwork with 72 0 btu gas furnae and 2 1/2 ton a/c and 2 ton heatpump and 2 ton air handler as per code. Gas by others. Permit id: Com2015-08161 | |||||
Rough in water & waste for 2. 5 bathrooms wet bar - (1) kitchen and laundry - rough to gas for (1) furnace ( 0 btu and (1) range 0 btu. (11) plumbing fixtures - install (1) gal. Electric water heater. Reconstruct water & waste piping - instal Permit id: Com2015-07799 | |||||
Interior work 14 sqft: build on interior per plan and city code. Install new stairs 7 5/8 tread. Install 14 windows and 3 exterior doors. Install (9) interior and trim through out exten third floor out 13 feet onto new floor. R21 walls and r49 ceil Permit id: Com2015-07491 | |||||
Interior work 12 sqft: demo all interior wall and wall framing including living room kitchen bedroom bahrooms 6 front windows and 2 ext. Doors as per code demo only separate permit is required for tenant fitout Permit id: Com2014-43018 | |||||
Amenc permit #177365 issued 11/02/01 to extend completion date to 12/31/02 Permit id: Com2002-04776 | |||||
Interior work 14 sqft: build on interior per plan and city code. Install new stairs 7 5/8 tread. Install 14 windows and 3 exterior doors. Install (9) interior and trim through out exten third floor out 13 feet onto new floor. R21 walls and r49 ceiling insulation build new 126 x 186 deck off of back 2nd floor roof. Roof is not attached to either neighbor unit. All new joist will be 2x 16 o. C. For add on and deck will have 2x8 joist per plan and percode Expiration date: October 6, 2015 | Permit id: Com2015-07491 | |||||
Rough in water & waste for 2. 5 bathrooms wet bar - (1) kitchen and laundry - rough to gas for (1) furnace ( 0 btu and (1) range 0 btu. (11) plumbing fixtures - install (1) gal. Electric water heater. Reconstruct water & waste piping - install sump pump - all work done as per code Expiration date: October 8, 2015 | Permit id: Com2015-07799 | |||||
Original permit description:(com2015-07799)rough in water & waste for 2. 5 bathrooms wet bar - (1) kitchen and laundry - rough to gas for (1) furnace ( 0 btu and (1) range 0 btu. (11) plumbing fixtures - install (1) gal. Electric water heater. Reconstruct water & waste piping - install sump pump - all work done as per code Expiration date: November 27, 2015 | Permit id: Com2015-25602 | |||||
(use)the premises for single family dwelling Permit id: Use2016-00424 | |||||
Interior work 14 sqft: build on interior per plan and city code. Install new stairs 7 5 8 tread. Install 14 windows and 3 exterior doors. Install (9) interior and trim through out exten third floor out 13 feet onto new floor. R21 walls and r49 ceiling insulation build new 126 x 186 deck off of back 2nd floor roof. Roof is not attached to either neighbor unit. All new joist will be 2x 16 o. C. For add on and deck will have 2x8 joist per plan and percode Expiration date: October 6, 2015 | Permit id: Com2015-07491 | |||||
All ductwork with 72 0 btu gas furnae and 2 1 2 ton a c and 2 ton heatpump and 2 ton air handler as per code. Gas by others. Expiration date: October 13, 2015 | Permit id: Com2015-08161 | |||||
Original permit description:(com2015-08161)all ductwork with 72 0 btu gas furnae and 2 1 2 ton a c and 2 ton heatpump and 2 ton air handler as per code. Gas by others. Expiration date: December 3, 2015 | Permit id: Com2015-26193 | |||||
Amenc permit #177365 issued 11 02 01 to extend completion date to 12 31 02 Expiration date: December 21, 2002 | Permit id: Com2002-04776 |