New construction 6 story apartment, first floor pt deck wood framing up next five floors Permit type: Intake | Permit status: Closed | Completion date: March 6, 2015 | Permit id: 2015-129549-000 | |||||
Gas piping to 7 outlets, plans w/co Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131081-000 | |||||
San: 284 lf of 9 vsp main, approx d=9, in sw market st. Contractor shall build new branch per std p-262 and tap smh abq101 (approx d=9). Can allow pipe slope to 1% due to conflict w/utilities. Contractor to verify all depths and locations in field. Contact x37869 Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147519-000 | |||||
Stm: 259 lf of 18 csp main, approx d=12, in sw market st. Contractor shall build new 6 branch per std p-262 and tap storm-only sewer. Contractor to verify all depths and locations in field. Contact x37869 Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147521-000 | |||||
62 unit building. Largest unit is 9 sqft - oar 918 reduced fees apply only to residential units. Permit type: Intake | Permit status: Closed | Completion date: April 15, 2015 | Permit id: 2015-149625-000 | |||||
Sprinkler - install new fire suppression systems in new 6 story bldgincluding fire pump, manual wet standpipe, and combo standpipe, u/g to 5 out Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-149891-000 | |||||
Hourly inspection for underground conduit Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159467-000 | |||||
Alarm - install fire alarm system in new 6 story apt bldg Permit type: Intake | Permit status: Approved | Completion date: May 1, 2015 | Permit id: 2015-162388-000 | |||||
54,0 sf, 6 story apartment building (5/1) Permit type: Application | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-206964-000 | |||||
Dfs for continuous rod hold down system Permit type: Application | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for post tension Permit type: Application | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Application | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Issuance/intake | Permit status: Intake | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Process management | Permit status: Closed | Completion date: June 8, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Planning and zoning | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Life safety | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Structural | Permit status: Required | Completion date: July 6, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Special inspections review | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Application | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Issuance/intake | Permit status: Intake | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Process management | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Planning and zoning | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2014-206964-Dfs | |||||
Garage exhaust, 8. 5-ton gas pack for corridors, heat pump splits and pthps for apartments, restroom and kitchen subduct exhaust, dryer subduct on e-pwr, elevator vent w/mod interlocked w/fa, see 14-206964-co for plans Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-206969-000 | |||||
Hazardous/tank - installation of sub-base diesel fuel tank for an emergency generator. Permit type: Intake | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-206248-000 | |||||
Alarm-install of emergency responder radio system as per 5 fire code Permit type: Intake | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123555-000 | |||||
Install (1) non-illuminated fascia sign, 3. 2 sq ft, south elevation. Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-127782-000 | |||||
Das system Permit type: Electrical inspections | Permit status: Approved | Completion date: March 18, 2016 | Permit id: 2016-131766-000 | |||||
Adding (1) dogwash sink and (2) backflow devices. Permit type: Intake | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144911-000 | |||||
Installation of car parking lifts Permit type: Electrical inspections | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-155032-000 | |||||
Dfs 3 : for precast concrete and attachments Permit type: Application | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Application | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 5 : glass canopies over steel structure Permit type: Application | Permit status: Approved | Completion date: August 4, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 6 : mechanical parking devices Permit type: Application | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for attachment of equipment Permit type: Application | Permit status: Approved | Completion date: August 11, 2015 | Permit id: 2014-206964-Dfs | |||||
Revision to room 505, 5th floor joists and hangers redesigned to support concrete houskeeping pad loads and waterheaters. See documents for kga description Permit type: Application | Permit status: Approved | Completion date: October 16, 2015 | Permit id: 2014-206964-Rev | |||||
Revise permit for rfi and rfi 20. 1 revisions on sheet a712 show that masonry ledgers angles have plywood backup instead of gypsum sheating. Revise for rfi 154 to show the connections at the roof that have been clarified on drawing a/s110. Permit type: Application | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2014-206964-Rev | |||||
2 amp - 3 phase - temporary servicefor construction power Permit type: Electrical inspections | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-131589-000 | |||||
4th floor low volt wiring and hvac controls Permit type: Electrical inspections | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2015-132659-000 | |||||
5th floor low volt wiring and hvac controls Permit type: Electrical inspections | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-132664-000 | |||||
Hazardous tank - installation of sub-base diesel fuel tank for an emergency generator. Permit type: Intake | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-206248-000 | |||||
54,0 sf, 6 story apartment building (5 1) Permit type: Application | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-206964-000 | |||||
Revise permit for rfi and rfi 20. 1 revisions on sheet a712 show that masonry ledgers angles have plywood backup instead of gypsum sheating. Revise for rfi 154 to show the connections at the roof that have been clarified on drawing a s110. Permit type: Application | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2014-206964-Rev | |||||
Garage exhaust, 8. 5-ton gas pack for corridors, heat pump splits and pthps for apartments, restroom and kitchen subduct exhaust, dryer subduct on e-pwr, elevator vent w mod interlocked w fa, see 14-206964-co for plans Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-206969-000 | |||||
Gas piping to 7 outlets, plans w co Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131081-000 | |||||
San: 284 lf of 9 vsp main, approx d=9, in sw market st. Contractor shall build new branch per std p-262 and tap smh abq101 (approx d=9). Can allow pipe slope to 1% due to conflict w utilities. Contractor to verify all depths and locations in field. Contact x37869 Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147519-000 | |||||
Sprinkler - install new fire suppression systems in new 6 story bldgincluding fire pump, manual wet standpipe, and combo standpipe, u g to 5 out Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-149891-000 |