Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Nursery remodel ![]() ![]() Client: First Baptist Church | Permit type: Electrical | Permit status: Closed | Permit id: Elc2001-00506 | |||||
This permit is for erosion control only, per requirements of unified sewerage agency. ![]() Client: First Baptist Church | Permit type: Site work | Permit status: Closed | Permit id: Sit2000-00028 | |||||
Change of occupancy from b to e1 in building b also known as bolt hall, to be used for 2nd and 3rd grade max occupant load 49 ![]() ![]() Client: M.I.T.C.H. Charter Schl | Permit type: Building | Permit status: Closed | Permit id: Bup2002-00379 | |||||
SCORE 100 Add (1) branch circuit. In ministry building. Job no. 80. 1614 ![]() ![]() Client: First Baptist Church | Permit type: Electrical | Permit status: Closed | Permit id: Elc2006-00605 | |||||
SCORE 99 Hvac replacement rooftop unit. ![]() ![]() Client: First Baptist Church | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2003-00009 | |||||
SCORE 70 Replace rooftop hvac. New unit weights 330lbs. Old unit 4 ton, 80,0 btus. New unit 3 ton, 56,000btus. Value: 6,200. 2 2 04, adding interior furnace unit. ![]() ![]() Client: Tigard First Baptist | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2003-00689 | |||||
Install back flow prevention device ![]() Client: First Baptist Church | Permit type: Plumbing | Permit status: Closed | Permit id: Plm97-00386 | |||||
Fps ![]() ![]() Client: First Baptist Church | Permit type: Fire protection syst | Permit status: Closed | Permit id: Bup97-00244 | |||||
Add branch circuits add 3 service feeders ![]() Client: First Baptist Church | Permit type: Electrical | Permit status: Closed | Permit id: Elc97-00026 | |||||
Re: plm97-0009 ![]() Client: First Baptist Church | Permit type: Sewer | Permit status: Closed | Permit id: Swr97-00014 | |||||
Tigard first baptist church ![]() Client: First Baptist Church | Permit type: Plumbing | Permit status: Closed | Permit id: Plm97-00009 | |||||
Plumbing ![]() Client: First Baptist Church | Permit status: Closed | Permit id: Plm96-00310 | |||||
Site work private improvements (surface water drainage, water fire lines and sanitary lateral) to newly relocated building to be used for sunday school 8,208 sq ft (minor modification of present cup). This work in addition to work on sit96-0003. ![]() ![]() Client: First Baptist Church | Permit type: Site work | Permit status: Closed | Permit id: Sit96-00049 | |||||
Rebuild interior of newly relocated building to be used for sunday school 7,6 sq ft ![]() ![]() Client: First Baptist Church | Permit type: Building | Permit status: Closed | Permit id: Bup96-00531 | |||||
Site work for building moved to the site. Area of foundation only, no improvements. ![]() ![]() Client: First Baptist Church | Permit type: Site work | Permit status: Closed | Permit id: Sit96-00003 | |||||
New foundation and basement for a building moved to the site. Bond for 20k submitted to finance 020796 (good for 12 mos.)-jmh see log note ![]() ![]() Client: First Baptist Church | Permit type: Building | Permit status: Closed | Permit id: Bup95-00445 | |||||
SCORE 56 Site utilities for new parking lot. Other work: 3 perf pipe & (6) manholes. ![]() ![]() Client: First Baptist Church Of Tigard | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2006-00070 | |||||
SCORE 56 Addition of new parking. (phase 1). Client: First Baptist Church Of Tigard | Permit type: Site work | Permit status: Closed | Permit id: Sit2006-00002 | |||||
SCORE 100 Replace 2 ft. Water service. ![]() ![]() Client: First Baptist Church | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2001-00632 | |||||
Change of occupancy for the basement of bldg a to be used as a kindergarden and first grade building is limited to 49 total due to no fire alarm ![]() Client: M.I.T.C.H. Charter Schl | Permit type: Building | Permit status: Closed | Permit id: Bup2002-00353 | |||||
This permit is for erosion control only, per requirement of cws. ![]() Client: First Baptist Church | Permit type: Site work | Permit status: Closed | Permit id: Sit2007-00005 | |||||
SCORE 99 (2) first branch circuits for parking lot lighting. ![]() ![]() Client: First Baptist Church Of Tigard | Permit type: Electrical | Permit status: Closed | Permit id: Elc2006-00673 | |||||
SCORE 100 Wire (2) ac units: 1 service and 3 branch circuits. ![]() ![]() Client: Sanctuary | Permit type: Electrical | Permit status: Closed | Permit id: Elc2004-00501 | |||||
SCORE 100 Wire ac unit in ministries. ![]() ![]() Client: Ministries Center | Permit type: Electrical | Permit status: Closed | Permit id: Elc2004-00502 | |||||
SCORE 100 Installation of lights and outlets in bolt hall. Job no. 99. 5805 ![]() ![]() Client: Tigard First Baptist | Permit type: Electrical | Permit status: Closed | Permit id: Elc2001-00630 | |||||
SCORE 95 Gas piping - one outlet. Located in kitchen area, above t-bar. ![]() ![]() Client: First Baptist Church | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2000-00289 | |||||
SCORE 95 Erosion control only permit. ![]() ![]() Client: Grace Point Church | Permit type: Site work | Permit status: Issued | Permit id: Sit2011-00012 | |||||
SCORE 56 Remove and replace concrete block stairs with poured concrete stairs. Client: Grace Point Community Church | Permit type: Site work | Permit status: Issued | Permit id: Sit2010-00018 | |||||
SCORE 56 Reroof - remove and replace. Client: Grace Point Community Church | Permit type: Re-roof | Permit status: Issued | Permit id: Rer2010-00014 | |||||
SCORE 98 Adding a fabric canopy cover above steps to the community center adjacent to the church. Client: Grace Point Community Church | Permit type: Building | Permit status: Pending | Permit id: Bup2014-00211 |