Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use as a single family dwelling Permit id: Use2015-03961 | |||||
Original permit description:(com2015-15556)original permit description:(com2015-00270)interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhe Permit id: Com2015-19061 | |||||
Original permit description:(com2015-00270)interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace f Permit id: Com2015-15556 | |||||
Gas appliance replacement Permit id: Mec2015-00709 | |||||
Interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus Permit id: Com2015-00270 | |||||
Interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size/location. Replace 14 windows - same size/location. All work done to code. Expiration date: July 7, 2015 | Permit id: Com2015-00270 | |||||
Original permit description:(com2015-00270)interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size/location. Replace 14 windows - same size/location. All work done to code. Expiration date: January 8, 2016 | Permit id: Com2015-15556 | |||||
Original permit description:(com2015-15556)original permit description:(com2015-00270)interior demolition category 1/ non-structural alterations/ interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size/location. Replace 14 windows - same size/location. All work done to code. Expiration date: January 8, 2016 | Permit id: Com2015-19061 | |||||
Original permit description:(com2015-00270)interior demolition category 1 non-structural alterations interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size location. Replace 14 windows - same size location. All work done to code. Expiration date: January 8, 2016 | Permit id: Com2015-15556 | |||||
Interior demolition category 1 non-structural alterations interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size location. Replace 14 windows - same size location. All work done to code. Expiration date: July 7, 2015 | Permit id: Com2015-00270 | |||||
Original permit description:(com2015-15556)original permit description:(com2015-00270)interior demolition category 1 non-structural alterations interior work 6 sq. Ft. - interior demolition drywall. Framing as needed to cover plumbing and hvac. Bulkhead only - no new partition walls. Replace furnace 0 btus gas stove 45 0 btus water heater 0 btus. Plumbing: 6 fixtures water and waste line reconstructed. Electric: 2 amp service and 19 circuits. Exterior work - replace 2 doors front and back - same size location. Replace 14 windows - same size location. All work done to code. Expiration date: January 8, 2016 | Permit id: Com2015-19061 |