Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo and remove the existing suspended concrete porch and roof. Dig footer 16" round 30" below grade (6) pur new concrete footers upto grade intall ancor brackets and new 6 x 6 posts with double 2" x 10" beam new 2 x deck joist set 16a on counter new 5/4"x6" decking. New 6 x 6 post and 2 x beams to carry porch roof. Frame roof with 2"x 8" rafters sets 16" on counter plywood and roof shingels. Install new railing on deck and on garage roof with 4" x 4" post 2"x4" top and bottom rail and 2"x2" picketts set 5" on counter. Two sets of treated steps made frame 2"x12" carriges 2"x6" step red and 1x8 kick risers. Expiration date: January 22, 2005 | Permit id: Com2004-18025 | |||||
Demo and remove the existing suspended concrete porch and roof. Dig footer 16" round 30" below grade (6) pur new concrete footers upto grade intall ancor brackets and new 6 x 6 posts with double 2" x 10" beam new 2 x deck joist set 16a on counter new 5 4"x6" decking. New 6 x 6 post and 2 x beams to carry porch roof. Frame roof with 2"x 8" rafters sets 16" on counter plywood and roof shingels. Install new railing on deck and on garage roof with 4" x 4" post 2"x4" top and bottom rail and 2"x2" picketts set 5" on counter. Two sets of treated steps made frame 2"x12" carriges 2"x6" step red and 1x8 kick risers. Expiration date: January 22, 2005 | Permit id: Com2004-18025 |