Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: Ele2009-01065 | |||||
Install furnace 75 0 btus 2-ton air conditioning unit with ductwork as per code. Gas by others. Permit id: Com2009-16969 | |||||
1 sump pump 1st floor; 1 toilet basin 1 kitchen sink 2nd floor; 1 toilet tub and basin 3rd floor shower vanity and toilet reconstruct water and waste. Hot water heater and furnace. As per code. Permit id: Com2009-16767 | |||||
Exterior work - new replacement windows and exterior doors (same size and locations). Interior work (702 sq. Ft.) hardwood flooring carpet tile new trim and new paint. New framing and sheetrock for new bath and (2) closets on 3rd floor and new bath and Permit id: Com2009-15505 | |||||
Exterior work - new replacement windows and exterior doors (same size and locations). Interior work (702 sq. Ft.) hardwood flooring carpet tile new trim and new paint. New framing and sheetrock for new bath and (2) closets on 3rd floor and new bath and closets on 2nd floor as per sketch as per code. Expiration date: January 8, 2010 | Permit id: Com2009-15505 |