Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Non-structural alterations/ exterior work - notice to proceed: alter the integrated gutter at the roof of the bay window by enclosing it with a continuation of the sloped rooft. The alterations to the roof should not be visible except for the drip edge. R Permit id: Com2014-16801 | |||||
Service cable only size 200amps Permit id: Ele2009-00867 | |||||
Non-structural alterations/ exterior work - notice to proceed: alter the integrated gutter at the roof of the bay window by enclosing it with a continuation of the sloped rooft. The alterations to the roof should not be visible except for the drip edge. Repair the bay window with in-kind materials as needed. Awc per planning: all work must conform to chap ntp Expiration date: February 27, 2015 | Permit id: Com2014-16801 | |||||
Non-structural alterations exterior work - notice to proceed: alter the integrated gutter at the roof of the bay window by enclosing it with a continuation of the sloped rooft. The alterations to the roof should not be visible except for the drip edge. Repair the bay window with in-kind materials as needed. Awc per planning: all work must conform to chap ntp Expiration date: February 27, 2015 | Permit id: Com2014-16801 |