Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Mechanical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 625281 | |||||
Demolition/rebuild cash bond ps13a51765 Permit type: Demolition or move permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 600395 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 330755 | |||||
Construct water and sewer house connections in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 284106 | |||||
Restoration permit: restore and repair existing driveway apron as directed by the mcdps right of way inspector. Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 280583 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Current use: Swimming pool | Permit id: 706073 | |||||
Swimming pool Permit type: Building residential permit | Permit status: Issued | Current use: Swimming pool | Permit id: 702623 | |||||
400amp new service Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 628482 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan no. 166528. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 289917 | |||||
Building residential permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 600712 | |||||
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 604766 |