Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construction - concrete pours Permit type: Intake | Permit status: Complete | Completion date: November 25, 2014 | Permit id: 2014-242683-000 | |||||
Alarm- fire alarm for six story mixed use building Permit type: Intake | Permit status: Approved | Completion date: December 9, 2014 | Permit id: 2014-247142-000 | |||||
206 unit multifamily apartment project - above grade only Permit type: Intake | Permit status: Closed | Completion date: March 6, 2015 | Permit id: 2015-129589-000 | |||||
Gas to retail stubs, water heaters, fire pit and bbq and generator Permit type: Intake | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161517-000 | |||||
Constreuction -tower crane dismantle Permit type: Intake | Permit status: Complete | Completion date: May 21, 2015 | Permit id: 2015-173174-000 | |||||
Approval of a six-story mixed-use building in the albina community plan district, per exhibits c1- through c-72, signed and dated october 24, 2013, and subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c-1 through c-72. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-131079 dzm. No field changes allowed. B. There shall be a planted green screen fence and gate installed around the transformers and above all the parking at the center;c. A single type of horizontal bike rack, illustrated on sheet 7. 4, shall be used;d. The louvers on the exterior walls must be painted to match the [metal] panel color;e. Re-integrate the previously submitted canopy [which matches the design of the main entrance canopy at the southwest corner] Permit type: Land use review | Permit status: Completed | Completion date: March 26, 2013 | Permit id: 2013-131079-000 | |||||
Pbot / bes pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: October 29, 2013 | Permit id: 2013-206200-000 | |||||
30,60, pw permit set fee Permit type: Intake -we | Permit status: Closed | Completion date: October 10, 2013 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Intake -we | Permit status: Closed | Completion date: October 15, 2013 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: January 27, 2014 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Open | Completion date: February 6, 2014 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: June 25, 2014 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: May 27, 2014 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: July 11, 2014 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: October 29, 2013 | Permit id: 2013-216497-000 | |||||
30,60, pw permit set fee Permit type: Plan review -we | Permit status: Closed | Completion date: September 4, 2014 | Permit id: 2013-216497-000 | |||||
5/1, 6 story mixed use, residential (206 apts), ground floor retail, 1 level subgrade parking Permit type: Application | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2013-225047-000 | |||||
Dfs for post tensioned concrete deck Permit type: Application | Permit status: Approved | Completion date: August 13, 2014 | Permit id: 2013-225047-Dfs | |||||
Dfs for 2nd level post tensioned concrete deck Permit type: Application | Permit status: Approved | Completion date: August 19, 2014 | Permit id: 2013-225047-Dfs | |||||
Dfs for wood floor joists Permit type: Application | Permit status: Approved | Completion date: December 17, 2014 | Permit id: 2013-225047-Dfs | |||||
Dfs for roof joist Permit type: Application | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for roof joist Permit type: Issuance/intake | Permit status: Intake | Completion date: April 6, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for roof joist Permit type: Life safety | Permit status: Not reqd | Completion date: April 8, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for handrails and guardrails Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for handrails and guardrails Permit type: Issuance/intake | Permit status: Intake | Completion date: June 15, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for handrails and guardrails Permit type: Life safety | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2013-225047-Dfs | |||||
Revision to shear wall schedule due to drawing error Permit type: Application | Permit status: Approved | Completion date: December 22, 2014 | Permit id: 2013-225047-Rev | |||||
Rev 2 - roof framing changed in sw corner (revision requested by jacob balderas) Permit type: Application | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2013-225047-Rev | |||||
Rev 2 - roof framing changed in sw corner (revision requested by jacob balderas) Permit type: Issuance/intake | Permit status: Intake | Completion date: June 24, 2015 | Permit id: 2013-225047-Rev | |||||
Rev 2 - roof framing changed in sw corner (revision requested by jacob balderas) Permit type: Process management | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2013-225047-Rev | |||||
19 split heat pumps, 3 gas packs, 3 ductless splits, garage and misc exhausts, pthps for apartments, plans w/co Permit type: Intake | Permit status: Closed | Completion date: December 5, 2013 | Permit id: 2013-225053-000 | |||||
Duplicate of noise variance in rox - ivr #3488255 Permit type: Intake | Permit status: Complete | Completion date: July 17, 2014 | Permit id: 2014-185799-000 | |||||
206 unit mixed use over 1 level of parking - permit only for undeslab fixtures at this time Permit type: Intake | Permit status: Closed | Completion date: July 29, 2014 | Permit id: 2014-190761-000 | |||||
206 unit building. Largest unit is 976 sqft - oar 918 reduced fees apply only to residential units. Inspections for all dwelling units must be completed in (4) inspections. If additional inspections are required, they will be billed at the current reinspection fee for each additional inspection. Permit type: Intake | Permit status: Closed | Completion date: August 14, 2014 | Permit id: 2014-198354-000 | |||||
Approval of revisions to the previously-approved building in the albina community plan district, including: changing the previously-approved green shimmer metal panel to crystal zinc, a silver gray color; changing the previously-approved secondary exterior wall finish material from nichiha fiber-cement panel to tongue and groove wood siding with a clear finish; changing the previously-approved ground level aluminum storefront windows frames from clear anodized aluminum to black; and adding wood soffits to the underside of the previously-approved steel canopies at the ground level. This approval is per the approved site plans, exhibits c-1 through c-27, signed and dated october 30, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related conditions (b through xx) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears mus Permit type: Land use review | Permit status: Completed | Completion date: September 2, 2014 | Permit id: 2014-206251-000 | |||||
Sprinkler - install standpipes and fire sprinkler systems in new 6 story mixed use apt building Permit type: Intake | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-215660-000 | |||||
San conn: 3 lf of 14 vsp main sewer in n cook st (approx deep). Contractor to install std 48 manhole over existing 14 main and prepare branch to property per std p-262. Contractor to verify all depths and connections in field. Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258388-000 | |||||
Install new 25 lineal ft sanitary sewer line on property. Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258393-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Closed | Completion date: December 2, 2015 | Permit id: 2015-272223-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Letter sent | Completion date: December 18, 2015 | Permit id: 2015-272223-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Closed | Completion date: December 30, 2015 | Permit id: 2015-283071-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Letter sent | Completion date: January 13, 2016 | Permit id: 2015-283071-000 | |||||
New illuminated 24. 64 s. F., fascia sign, west elevation. Permit type: Intake | Permit status: Closed | Completion date: January 7, 2016 | Permit id: 2016-101800-000 | |||||
Connect (1) internally illuminated wall sign to existing electrical. Permit type: Intake | Permit status: Closed | Completion date: January 7, 2016 | Permit id: 2016-101806-000 | |||||
Alarm - installation of das system - in-building radio coverage for 800mhz public safety radio Permit type: Intake | Permit status: Approved | Completion date: February 9, 2016 | Permit id: 2016-118477-000 | |||||
Dfs for roof joist Permit type: Application | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs for handrails and guardrails Permit type: Application | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs - light gauge metal framing Permit type: Application | Permit status: Approved | Completion date: July 15, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs - storefront systems for ground level Permit type: Application | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2013-225047-Dfs | |||||
Dfs - hvac equipment anchoring Permit type: Application | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 2013-225047-Dfs | |||||
Rev 2 - roof framing changed in sw corner (revision requested by jacob balderas) Permit type: Application | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2013-225047-Rev | |||||
Added das system for adequate radio coverage for fire department Permit type: Application | Permit status: Approved | Completion date: January 19, 2016 | Permit id: 2013-225047-Rev | |||||
6-19-14 noise complaint - construction noise at 6 am multiple days. Permit type: Request | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-171594-000 | |||||
6-19-14 noise complaint - construction noise at 6 am multiple days. Permit type: Request | Permit status: Closed | Completion date: March 15, 2016 | Permit id: 2014-171594-000 | |||||
Hazardous/tanks-excavation of decommisioned 5 gal diesel tank Permit type: Intake | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2014-178190-000 | |||||
Temp service and (6) branch circuitsfaxed Permit type: Electrical inspections | Permit status: Approved | Completion date: March 25, 2016 | Permit id: 2014-217585-000 | |||||
Low voltage electrical permit, 11 circuits Permit type: Electrical inspections | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2015-122844-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Closed | Completion date: December 2, 2015 | Permit id: 2015-272223-000 | |||||
Zoning confirmation Permit type: Land use review | Permit status: Letter sent | Completion date: December 18, 2015 | Permit id: 2015-272223-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Closed | Completion date: December 30, 2015 | Permit id: 2015-283071-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Letter sent | Completion date: January 13, 2016 | Permit id: 2015-283071-000 | |||||
5 1, 6 story mixed use, residential (206 apts), ground floor retail, 1 level subgrade parking Permit type: Application | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2013-225047-000 | |||||
19 split heat pumps, 3 gas packs, 3 ductless splits, garage and misc exhausts, pthps for apartments, plans w co Permit type: Intake | Permit status: Closed | Completion date: December 5, 2013 | Permit id: 2013-225053-000 | |||||
6-19-14 noise complaint - construction noise at 6 am multiple days. Permit type: Request | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-171594-000 | |||||
6-19-14 noise complaint - construction noise at 6 am multiple days. Permit type: Request | Permit status: Closed | Completion date: March 15, 2016 | Permit id: 2014-171594-000 | |||||
Hazardous tanks-excavation of decommisioned 5 gal diesel tank Permit type: Intake | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2014-178190-000 | |||||
Demo 27 sq ft retail building Client: Northeast Coalition Of Neighbors | Permit type: Demolition | Permit status: Final | Completion date: August 8, 2013 | Current use: Business | Permit id: 2013-105108-000 |