Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Date: May 1, 2015 Contractor: Justin Marinoff Client: Hubert Fowler | Client Address: 104-31 205 Street Queens Ny 11412 | Client Phone: (516) 825-8850 | Client Company: Self | Permit status: Initial | Permit id: 421158856 | |||||
SCORE 100 Date: December 9, 2015 Contractor: David Jablon Client: Hubert Fowler | Client Address: 104-31 205 Street Queens Ny 11412 | Client Phone: (516) 825-8850 | Client Company: Self | Permit status: Initial | Permit id: 421158856 | |||||
SCORE 99 Equipment work Date: May 1, 2015 Contractor: M. Marin Restoration Inc Permit status: Permit issued | Permit id: 42115885601 | |||||
Remove all protruding nails on the stairs from the first floor to the second floor. Tenant contact is ( 4 ) 881- 1234. Date: July 27, 2016 Value: $20 Permit type: Gc | Permit id: Eh01112 | |||||
At first floor small bed room provide and install new 12 section radiator complete with new air valve and shut off valve. At the time of this invita Date: November 18, 2016 Value: $393 Permit type: Plumb | Permit id: Eh06831 | |||||
Apt. #1fl; tenant - bernard, cherylant (347) 723-2377 all work done under new york state department of labor and nyc hpd specification. Abate m Date: August 18, 2016 Permit type: Gc | Permit id: Eh01711 | |||||
Bsmt cellar pump out all accumilated waste water and sewage wash down entire bsmnt floor remove all evidence of waste rinse and vaccum dry entire c Date: January 4, 2017 Permit type: Stopag | Permit id: Eh09254 | |||||
Date: May 1, 2015 Client: Hubert Fowler | Client Address: 104-31 205 Street Queens Ny 11412 | Client Phone: (516) 825-8850 | Client Company: Self | Permit status: Renewal | Permit id: 421158856 | |||||
SCORE 100 Date: December 9, 2015 Contractor: David Jablon Client: Hubert Fowler | Client Address: 104-31 205 Street Queens Ny 11412 | Client Phone: (516) 825-8850 | Client Company: Self | Permit status: Initial | Permit id: 421158856 | |||||
At cellar of the 2 story house >>>>>>>>>>>>> 1. Make all necessary repairs in order to restore hot water. The vendor will be responsibl Date: September 7, 2017 Permit type: Heat | Permit id: Ei03347 | |||||
Pvt house @ basement: abate mold and mildew growth with soap or detergent and water (no bleach or biocide solutions) @ ceiling and walls approximate ( Date: October 2, 2017 Permit type: Gc | Permit id: Ei04105 | |||||
At cellar of the 2 story house >>>>>>>>>>>>> 1. Make all necessary reparis to water line to hot water heater, including supply and installatio Permit type: Plumb | Permit id: Ei03134 | |||||
At building: private house reglaze the broken thermal panes on the bedroom window. Replace any defective balance and locking device, ensure proper o Date: December 14, 2016 Permit type: Gc | Permit id: Eh07792 | |||||
Provide automatic fuel drop to the above building until further notice. 2b-5 fuel prime and start for first drop only if necessary (212) 863-8781 Date: December 17, 2016 Permit type: Util | Permit id: Eh08334 | |||||
At apt #: 1, lower level of duplex apt. ----- 1st sty entire apartment troubleshoot for possible causes of power outage throughout the entire Date: September 20, 2017 Permit type: Elec | Permit id: Ei03131 | |||||
At apt#: 1, room east (1) ----- wet scrape approx. Sq. Ft. Of ceiling previously damaged by a leak from the roof. Tape and plaster, prime with s Date: September 8, 2017 Permit type: Gc | Permit id: Ei03137 | |||||
At building: private house replace defective drain line on the second floor bath tub. Replace parts as necessary,return to leak free status ensure p Date: September 1, 2016 Permit type: Gc | Permit id: Eh02509 | |||||
At building: make all necessary repairs to the hot and cold water lines through out the building including all fixtures. Replace parts as necessary s Date: August 10, 2016 Permit type: Plumb | Permit id: Eh01039 | |||||
At building: private house re- install all radiators through out the first and second floor with new shut off valves and new air valves and additiona Date: August 10, 2016 Permit type: Plumb | Permit id: Eh01116 | |||||
All work done under new york state department of labor and nyc hpd specification abate mold and mildew growth with soap or detergent and water (no ble Date: August 2, 2016 Permit type: Gc | Permit id: Eh00975 | |||||
At building: supply and a new gas fire gallons water heater complete including, temperature gauge, restore hot water to the building. Remove old w Date: August 8, 2016 Permit type: Plumb | Permit id: Eh01041 | |||||
At building: remove existing heating plant, and provide and install new boiler pad. Supply and install new cast iron #2 oil fired steam boiler with d Date: October 24, 2016 Permit type: Heat | Permit id: Eh05427 | |||||
As per mini rc # 2017000146302 (new york environmental & mtrl lab) and hpd specification, perform polarized light microscopy (plm) analysis of 3 samp Date: November 3, 2016 Permit type: Asbest | Permit id: Eh06087 | |||||
As per mini rc # 2017000146501 (new york environmental & mtrl lab) perform air sampling and analysis in accordance with hpd mini requirement contract Date: November 9, 2016 Permit type: Asbest | Permit id: Eh06089 | |||||
National grid provide gas to boiler hot water heater. Date: November 17, 2016 Permit type: Util | Permit id: Eh06784 | |||||
As per rc # 2017000195101(b & n & k restoration, inc), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of t Date: November 3, 2016 Permit type: Asbest | Permit id: Eh06088 | |||||
At building: clear stoppage: and pump out all sewage and stagnant water in basement; vacuum dry, broom sweep and sanitize accordingly. Remove all d Date: October 24, 2016 Permit type: Stopag | Permit id: Eh05418 | |||||
In 2nd floor bathroom trace and repair all sources of leaks from fixtures, faucets & spouts, make necessary repairs to stop leaks from re-occurring. Date: May 15, 2017 Permit type: Gc | Permit id: Eh16962 | |||||
In entire bsmt pump out sewage, clear sewer line stoppages from trap to street & trap into house line and furthest stack. Wash down entire bsmt flo Date: May 10, 2017 Permit type: Stopag | Permit id: Eh16958 | |||||
No gas supply at entire bldg make all necessary repairs to gas lines for water heater & 1st fl Date: May 18, 2017 Permit type: Plumb | Permit id: Eh17062 | |||||
Building # 104-31 205 street, apt. 1 kitchen: supply and install new inches cast iron steam radiator including air valve. Install extension stea Date: October 24, 2017 Permit type: Plumb | Permit id: Ei04380 |