Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 527494 | |||||
A/p 526175 install solar panels on roof 3. 6 kw solor system Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 526208 | |||||
Remove 2 amp electrical meter, add new 2 amp disconnect outside, change 2 amp interior panel to sub-panel. Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 656392 | |||||
Alter- install solar panels on roof Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 526175 | |||||
Screened porch Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 626541 | |||||
Under pavement cut moratorium until 7/31/15. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Replacegas service in accordance with washington gas plan no. 173468. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 292936 | |||||
Relocate 200a meter box 25 feet to rear of house,make existing pole a urd cable pole, install cable and associated equipment in accordance with pepco plan no. 3430612. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 304370 |