"partial use-use portion of premises as a ""fitness center"". Final u/o to follow upon completion of flood proofing. Awc per planning - partial use permit approved. Final use permit to follow upon completion of flood proofing and site inspection." Permit id: Use2015-03019 | |||||
Amend permit# com2015-01666 issued on 04/23/15 with plans# 2015-121 to add electrical contractor as listed above original permit description:(com2015-01666)interior demo and alterations to remove existing office area and expand existing 1st floor gym in t Permit id: Com2015-09455 | |||||
Interior demo and alterations to remove existing office area and expand existing 1st floor gym in the ivory building (to include but not limited to new training area locker rooms restrooms fitness studios and gym office/workroom) as per plans as per co Permit id: Com2015-01666 | |||||
Interior work 15 428 sqft: interior non structral demo of partitions floor coverings mechanical electrical plumbing distributions fixtures and finishes as per code demo only separate permit will be pulled for tenant fitout planning awc:approved with Permit id: Com2015-08172 | |||||
(use) the premises for under armour visiter center Permit id: Use2013-03890 | |||||
Original permit description:(com2013-02601)building demolition and construction of new building and associated site improvements as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Seperate permit will be req Permit id: Com2013-17298 | |||||
Fire alarm system as per plans as per code Permit id: Com2013-13907 | |||||
Installation of 26 telecom outlets/devices as per code. Permit id: Com2013-16476 | |||||
Building demolition and construction of new building and associated site improvements as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Seperate permit will be required for razing existing structure. Per pu Permit id: Com2013-02601 | |||||
Permit id: Dem2013-00081 | |||||
Use 1st floor as office space Permit id: Use2013-00858 | |||||
Furnish and install 1 horn strobe and 3 strobes as per code. Permit id: Com2013-01989 | |||||
Amend permit #com2012-029 issued on 03/05/2012 with plans #2012-209 to add electrical and plumbing contractors as listed above. Original permit description:(com2012-02900)new construction - install two mooring bollards at the existing facility. Bollard Permit id: Com2012-09012 | |||||
"exterior work - replace the existing letter set on the roof(mezzanine level) with a new set of illuminated letters reading: under armour. Proposal is to utilize all existing frame and steel work. Sign dimensions: 8hx130-9 1/4""w = 1046 sf as per sketch" Permit id: Com2012-05046 | |||||
"new construction - install two mooring bollards at the existing facility. Bollards will be 24"" diameter steel pipe piles driven into the river bottom through an existing relieving platform inboard of the existing seawall. In addition two damaged 13-pile" Permit id: Com2012-02900 | |||||
Use portion of premises as offices Permit id: Use2011-03323 | |||||
Interior demo and alterations per plans and per code. Separate permit will be required for sprinkler system. Permit id: Com2011-08999 | |||||
To relocate existing fire alarm notification devices as per plans as per code. Permit id: Com2011-03773 | |||||
Add and relocate sprinkler per nfpa. As per plans and as per code. Permit id: Com2011-04456 | |||||
"install 1 d/f non illuminated projecting buldg sign. 1-6""x6-3 1/2""= 9. 43 sq. Ft. Work as per code." Permit id: Com2011-01952 | |||||
Installation of new playground equipment and sidewalk repair/modification (including railings) work per code and plans. Permit id: Com2010-25481 | |||||
Installation of security system (75 devices) as per code. Permit id: Com2010-15960 | |||||
Amend permit com2010-12407 issued on 06/16/ with plans #2010-725 to add hvac contractor as listed above. Original permit description:(com2010-12407)interior work: 0 sq. Ft.; tenant fit out as per plans and as per code. Seperate permit will be requi Permit id: Com2010-14316 | |||||
Amend permit #com2010-03235 issued on 03/02/ with plans #2010-235 to add hvac contractor as listed above. Original permit description:(com2010-03235)demolition of existing non structural drywall partitions and infill of minimal drywall partition as re Permit id: Com2010-07203 | |||||
Amend permit com2010-03235 issued on 03/02/ with pland #2010-235 to add electrical contractor as listed above. Original permit description:(com2010-03235)demolition of existing non structural drywall partitions and infill of minimal drywall partition Permit id: Com2010-05749 | |||||
Demolition of existing non structural drywall partitions and infill of minimal drywall partition as required to install new ton hvac system and associated electrical connections as per plans as per code. Seperate permit will be required for sprinkler Permit id: Com2010-03235 | |||||
Amend permit#com2009-26271 issued on 1-6- with plans #2009-1471 to add plumbing and hvac contractor as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separa Permit id: Com2010-02313 | |||||
Amend permit com2009-26271 issued on 01/06/ with plans #2009-1471 to add electrical contractor as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separate Permit id: Com2010-00459 | |||||
Amend permit #com2009-26271 issued 1-6- with plans #2009-1471 to add prime contractors as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separate permit wi Permit id: Com2010-00326 | |||||
Interior buildout new lighting & finishes minimal partition as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. C/o required on a seperate form upon completion. Permit id: Com2009-26271 | |||||
Power for future sign-install amp 3 phase feeder to sub panel to feed future signage. Install photocell controlled 3 pole contactor with bypass switch. 3 20amp circuits for future sign. Plans required for signs on separate permit Permit id: Com2009-23770 | |||||
"install (4) wallmounted signs onto existing bridge (elevated tunnel) (2) illuminated logos 12 x 14 (1) illuminated sgin box 3 x 9"" x 112. 5 sq. Ft (1) set non-illuminated letters 3 7/8"" x 92. 18 sq. Ft. As per sketch as per code" Permit id: Com2009-23562 | |||||
Interior work to replace 2. 5 ton mitsubishi a/c ductless split system with electric as per code. Permit id: Com2009-19872 | |||||
Interior alteration (installation of pdu) ups as per plans and as per code. Permit id: Com2009-13416 | |||||
(18) telecommunication outlets installed as per code. Permit id: Com2008-24733 | |||||
Amend permit#com2009-26271 issued on 1-6- with plans #2009-1471 to add plumbing and hvac contractor as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. C/o required on a seperate form upon completion. Expiration date: January 6, 2011 | Permit id: Com2010-02313 | |||||
Amend permit com2009-26271 issued on 01/06/ with plans #2009-1471 to add electrical contractor as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. C/o required on a seperate form upon completion. Expiration date: January 6, 2011 | Permit id: Com2010-00459 | |||||
Amend permit #com2010-03235 issued on 03/02/ with plans #2010-235 to add hvac contractor as listed above. Original permit description:(com2010-03235)demolition of existing non structural drywall partitions and infill of minimal drywall partition as required to install new ton hvac system and associated electrical connections as per plans as per code. Seperate permit will be required for sprinkler system. Expiration date: March 2, 2011 | Permit id: Com2010-07203 | |||||
Install (4) wallmounted signs onto existing bridge (elevated tunnel) (2) illuminated logos 12 x 14 (1) illuminated sgin box 3 x 9" x 112. 5 sq. Ft (1) set non-illuminated letters 3 7/8" x 92. 18 sq. Ft. As per sketch as per code Expiration date: April 7, 2010 | Permit id: Com2009-23562 | |||||
Amend permit com2010-12407 issued on 06/16/ with plans #2010-725 to add hvac contractor as listed above. Original permit description:(com2010-12407)interior work: 0 sq. Ft.; tenant fit out as per plans and as per code. Seperate permit will be required for sprinkler system and low voltage. Expiration date: June 16, 2011 | Permit id: Com2010-14316 | |||||
Demolition of existing non structural drywall partitions and infill of minimal drywall partition as required to install new ton hvac system and associated electrical connections as per plans as per code. Seperate permit will be required for sprinkler system. Expiration date: March 2, 2011 | Permit id: Com2010-03235 | |||||
Amend permit #com2009-26271 issued 1-6- with plans #2009-1471 to add prime contractors as listed above. Original permit description:(com2009-26271)interior buildout new lighting & finishes minimal partition as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. C/o required on a seperate form upon completion. Expiration date: January 6, 2011 | Permit id: Com2010-00326 | |||||
Install 1 d/f non illuminated projecting buldg sign. 1-6"x6-3 1/2"= 9. 43 sq. Ft. Work as per code. Expiration date: August 10, 2011 | Permit id: Com2011-01952 | |||||
Building demolition and construction of new building and associated site improvements as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Seperate permit will be required for razing existing structure. Per pud 146a ordinance # 09-103 and minor pud amendment and design approval of the planning commission on 2/7/13 c/o reqiured on seperate form upon completion Expiration date: April 5, 2015 | Permit id: Com2013-02601 | |||||
New construction - install two mooring bollards at the existing facility. Bollards will be 24" diameter steel pipe piles driven into the river bottom through an existing relieving platform inboard of the existing seawall. In addition two damaged 13-pile timber dolphins will be removed along with miscellaneous timber piles presenting a hazard to navigation. A new utility trench will be installed to provide minor utility service to relieving platform. Land disturbance will be under 5 0 sq ft and 1 cy. Joint permit has been applied for and will be approved before beginning construction. As per plan and as per code. Expiration date: September 5, 2012 | Permit id: Com2012-02900 | |||||
Exterior work - replace the existing letter set on the roof(mezzanine level) with a new set of illuminated letters reading: under armour. Proposal is to utilize all existing frame and steel work. Sign dimensions: 8hx130-9 1/4"w = 1046 sf as per sketch & as per code. Expiration date: September 9, 2012 | Permit id: Com2012-05046 | |||||
Amend permit #com2012-029 issued on 03/05/2012 with plans #2012-209 to add electrical and plumbing contractors as listed above. Original permit description:(com2012-02900)new construction - install two mooring bollards at the existing facility. Bollards will be 24" diameter steel pipe piles driven into the river bottom through an existing relieving platform inboard of the existing seawall. In addition two damaged 13-pile timber dolphins will be removed along with miscellaneous timber piles presenting a hazard to navigation. A new utility trench will be installed to provide minor utility service to relieving platform. Land disturbance will be under 5 0 sq ft and 1 cy. Joint permit has been applied for and will be approved before beginning construction. As per plan and as per code. Expiration date: September 5, 2012 | Permit id: Com2012-09012 | |||||
Original permit description:(com2013-02601)building demolition and construction of new building and associated site improvements as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Seperate permit will be required for razing existing structure. Per pud 146a ordinance # 09-103 and minor pud amendment and design approval of the planning commission on 2/7/13 c/o reqiured on seperate form upon completion Expiration date: April 5, 2015 | Permit id: Com2013-08986 | |||||
Interior demo and alterations to remove existing office area and expand existing 1st floor gym in the ivory building (to include but not limited to new training area locker rooms restrooms fitness studios and gym office/workroom) as per plans as per code. Separate permit required for fire alarm system. Expiration date: April 23, 2017 | Permit id: Com2015-01666 | |||||
Interior work 15 428 sqft: interior non structral demo of partitions floor coverings mechanical electrical plumbing distributions fixtures and finishes as per code demo only separate permit will be pulled for tenant fitout planning awc:approved with condition that all floodproofing documentation discussed for permit#2015-121 will be submitted. If floodproofing materials are not provided to the certified floodplain mangers for permit#2015-121 this permit will be rescinded. Expiration date: October 13, 2015 | Permit id: Com2015-08172 | |||||
Amend permit# com2015-01666 issued on 04/23/15 with plans# 2015-121 to add electrical contractor as listed above original permit description:(com2015-01666)interior demo and alterations to remove existing office area and expand existing 1st floor gym in the ivory building (to include but not limited to new training area locker rooms restrooms fitness studios and gym office/workroom) as per plans as per code. Separate permit required for fire alarm system. Expiration date: April 23, 2017 | Permit id: Com2015-09455 | |||||
Amend permit com2010-03235 issued on 03/02/ with pland #2010-235 to add electrical contractor as listed above. Original permit description:(com2010-03235)demolition of existing non structural drywall partitions and infill of minimal drywall partition as required to install new ton hvac system and associated electrical connections as per plans as per code. Seperate permit will be required for sprinkler system. Expiration date: March 2, 2011 | Permit id: Com2010-05749 | |||||
Partial use-use portion of premises as a "fitness center". Final u/o to follow upon completion of flood proofing. Awc per planning - partial use permit approved. Final use permit to follow upon completion of flood proofing and site inspection. Permit id: Use2015-03019 | |||||
Add 5 sprinkler heads and relocate 25 sprinkler heads as per code. Expiration date: February 1, 2017 | Permit id: Com2016-19657 | |||||
Facade repair as per plans as per code. Expiration date: August 31, 2017 | Permit id: Com2016-16893 |