Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 61 Legalize concrete wall - reduced from exisitng 8 high to 6 high Permit status: Finaled | Permit id: B11-0501 | |||||
SCORE 56 Building permit to legalize existing portable crusher equipment. Scope of permit - concrete slabs to support one unit and electrical for both portable units Permit type: Electrical | Permit status: Finaled | Permit id: B11-4359 | |||||
SCORE 61 Legalize existing storage/cargo containers 2, 3, 5, 6, 7 and 8 (see plans for previous and proposed locations). Containers 1 and 3 to be removed.. Permit status: Finaled | Permit id: B11-0500 | |||||
SCORE 65 Build new foundations (only) for 3 asphalt storage silos. Take in per mike whitaker. Permit status: Finaled | Permit id: B11-2013 | |||||
SCORE 59 Legalization of tank removal. Permit status: Finaled | Permit id: B12-2024 | |||||
SCORE 59 Legalization of demolition of 3 buildings.,approximated floor areas of the three removed buildings - see applicants site plan for locations:,westerly building 13 sf,southerly building 1324 sf,easterly building (north of exisitng building) 112 Permit status: Finaled | Permit id: B12-2025 | |||||
SCORE 61 Legalize existing modular control room.,(lift being provided instead of ramp for accessible access) Permit status: Finaled | Permit id: B11-0502 | |||||
SCORE 56 Installation of three asphalt storage tower (silos) a drag conveyor two horizontal conveyors, three batchers, at the bodean asphalt plant. Permit status: Finaled | Permit id: B13-1861 | |||||
SCORE 65 Install associated equipment for asphalt silos (b13-1861). Permit status: Finaled | Permit id: B13-2485 | |||||
SCORE 65 2,0 amp electric service; seperated from silo project. Permit status: Finaled | Permit id: B12-2998 |