Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Project incomplete - deposit moved 650-9320-4704 dchristmon - rec#13953,chk#25549 Permit id: 80-3430 | |||||
SCORE 100 It is proposed to open cut in the sidewalk area n side reed ave a 4x47d bellhole in order to install a new 2 transmission pressure natural gas valve to replace the existing non operational 2" valve. It is also proposed to open cut in the paved area on the n side of reed ave a 4x4x 6d bellhole to abandon in place and wrap the existing non operational valve. Permit id: 04-0964 | |||||
W. O. # 99022 utility company # n aa preconstruction meeting is required: call (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Horizontal bore across stillwater rd. Install two (2) 4" conduits. Permit id: 06-0521 | |||||
SCORE 100 Wo#99022. Pm 30558673. Dig a 45 trench to install fiberoptic cable on s e corner of stillwater. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 07-0115 | |||||
Wo#99022 pg&e pm30604290. Reconducting 115kv electric transmisison lines on stillwater rd and harbor blvd near home depot. (taffic control plan for lane closure attached)a pre-inspection is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 08-0368 |