Construction of a new complete room inside suite #1503 to include drywall partitions window door acoustical ceiling lay-in light fixtures vct flooring hvac and electrical as per plans. Interior alterations as per plans. Separate permit will be required for sprinkler system. Expiration date: August 10, 2003 | Permit id: Com2003-20695 | |||||
Remove existing wet pipe sprinklers in new data center area relocate 2 wet pipe sprinkler heads adjacent to new data center area add new 4 sprinkler head pre-action sprkinkler system in data center area Expiration date: September 6, 2003 | Permit id: Com2003-21711 | |||||
Install fm-2 clean agent fire suppression system with associated low voltage detection and activation circuits Expiration date: September 6, 2003 | Permit id: Com2003-21712 | |||||
Work done on 10th. Fl. Existing wet pipe sprinkler system is modified for new tenant layout all areas light hazard. Relocate 49 sprinklers no adds. Largest pipe size 1" Expiration date: April 28, 2004 | Permit id: Com2003-40220 |