Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Original permit description:(com2015-22361)minor renovation of existing space (making existing office smaller to add an additional meeting room) includes minor electrical/hvac to accommodate the design change one added interior door as per plans as per Permit id: Com2015-28757 | |||||
Minor renovation of existing space (making existing office smaller to add an additional meeting room) includes minor electrical/hvac to accommodate the design change one added interior door as per plans as per code. Permit id: Com2015-22361 | |||||
Use a portion of the 22nd floor as an office Permit id: Use2015-02628 | |||||
(use)portion of the premises floor 15th 16th and 19th for office spaces Permit id: Use2015-02305 | |||||
Install (40) voice data outlets as per code Permit id: Com2015-12195 | |||||
Non-structural alterations/exterior work - install stainless steel halo lit channel letters (illumatinated) 3. 91ft x 12. 95ft = 50. 63 sq ft; install (1) aluminum plaque pin mounted (non-illuminated) 1ft by 4 ft = 4sq ft. As per code/drawing. Activity do Permit id: Com2015-03794 | |||||
Adding 4 maglocks for access control system as per code. Permit id: Com2015-03878 | |||||
Installing computer cables low voltage riser cables 17th & 18th floors. Installing computer cables low voltage riser and horizontal cables for 15th 16th and 19th floors. Work done to code. Permit id: Com2015-03336 | |||||
On 6th floor install (22) low voltage voice/data drops and (1) low voltage phone feeded as per code. Permit id: Com2013-15852 | |||||
Use suite # 23 as office space Permit id: Use2013-01650 | |||||
Amend permit #com2011-25413 issued on 11/29/2011 with plans #2011-1749 to add the following additional work: various revisions. As per plans and as per code. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new Permit id: Com2012-01147 | |||||
Amend permit#com2011-25413 issued on 11-29-12 with plans#2011-1749 to add low voltage contractor( varia system inc) as listedin the description. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jm Permit id: Com2012-00373 | |||||
Install fire alarm. As per plan and as per code. (partial permit # com2011-20410) Permit id: Com2011-27903 | |||||
Amend permit #com2011-25413 issued on 11/29/2011 with plans #2011-1749 to add 2nd electrical contractor as listed above. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- Permit id: Com2012-00117 | |||||
57 low voltage cabling as per code. Permit id: Com2012-00153 | |||||
Add & relocate sprinkler heads - new 29 & replace 101as per plans as per code Permit id: Com2011-24740 | |||||
Amend pemrit #com2011-204 issued on 10/11/2011 with plans #2011-1382 to add low voltage contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code Permit id: Com2011-27519 | |||||
Amend permit#com2011-25413 issued on 11/29/11 with plans#2011-1749 to add contractors as listed aboveoriginal permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th fl Permit id: Com2011-27132 | |||||
Installation of (350) data cables as per code. ( low voltage) Permit id: Com2011-26665 | |||||
Amend permit#com2011-204 issued 9-29-11 with plans# 2011-1382 to add hvac contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Permit id: Com2011-26388 | |||||
Interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system Permit id: Com2011-25413 | |||||
Amend permit# com2011-204 issued on 10/11/11 with plans# 2011-1382 to add plumbing contractor as listed above original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Permit id: Com2011-24802 | |||||
Amend permit #com2011-204 issued on 10/11/11 with plans #2011-1382 to add electrical contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Permit id: Com2011-24179 | |||||
Interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Permit id: Com2011-20410 | |||||
Interior work (14 sq ft) - nonstructural alterations - build (3) new offices paint walls cove base relocate lights new switches & outlets - no hvac & sprinklers reqd - tech zone ceilings. Separate permit will be required for sprinkler system and f Permit id: Com2011-07387 | |||||
"install 3 building mounted sidns 1 north elevation 93 1/8"" x 11 3/8""= 101. 38 sq ft. 1 south elevation: 9 3 1/8"" x 11 3/8"" =101. 38 sq ft. 1 west elevation 39"" x 16= sq ft. Onto existing canopy.. Connect 3 signs to existing wiring. All work b" Permit id: Com2010-16531 | |||||
Fire alarm devices = (26) strobes & (19) speaker strobes as per plans & as per code. Permit id: Com2010-08044 | |||||
Data cable installation 3 cables (1 stations) paging installation speakers. Work done to dode. Permit id: Com2010-09380 | |||||
Amend permit#com2010-02206 issued on 3-17- with plans#2010-147 to add electrical contractor as listed above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plan Permit id: Com2010-08550 | |||||
Use the 21st floor as office space Permit id: Use2010-01387 | |||||
Amend permit#com2010-02206 issued on 3-17- w/plans#2010-147 to add the plumber and hvac contractor as stated above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as Permit id: Com2010-07307 | |||||
Amend permit # com2010-02206 issued on 03/17/ with plans # 2010-47 to add electrical contractor as listed above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per Permit id: Com2010-05549 | |||||
Interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Permit id: Com2010-02206 | |||||
"interior work - sprinkler - relocate & add 3 heads per light hazard. Largest pipe size 1"" as per code." Permit id: Com2010-04113 | |||||
Amend permit#com2009-13269 issued on 7/6/09 with plans#775 to add the following additional work: alterations to architectural mechanical electrical and sprinklers as per plans as per code. Original permit description:(com2009-13269)interior alterations Permit id: Com2009-20356 | |||||
Amend permit com2009-13269 issued on 07/06/09 with plans #2009-775 to add electrical (low voltage) contractor as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per c Permit id: Com2009-20988 | |||||
Audio/video lv projectors monitors speakers. Work done to code. Permit id: Com2009-20906 | |||||
Relocating 169 and 21 new sprinkler heads as per plans as per code. Permit id: Com2009-18483 | |||||
Installation of 11 card readers as per code. Permit id: Com2009-18344 | |||||
Installing 473 data drops and 3 video drops-476 low voltage of cable as per code Permit id: Com2009-18044 | |||||
Construct interior convenience stair between floors and 21 and additional slab reinforcing at library shelving on floor 21 per plans and per code. Separate permit is required for sprinkler system. Permit id: Com2009-13358 | |||||
Amend permit #com2009-13269 issued on 07/06/09 with plans #2009-775 to add electrical contractor(s) as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separa Permit id: Com2009-15581 | |||||
Interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Permit id: Com2009-13269 | |||||
Install wet chemical fire system in exhaust hood on the 4th floor. Work done to code. Permit id: Com2009-08578 | |||||
Amend permit#com2010-02206 issued on 3-17- w/plans#2010-147 to add the plumber and hvac contractor as stated above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Expiration date: September 17, 2012 | Permit id: Com2010-07307 | |||||
Install 3 building mounted sidns 1 north elevation 93 1/8" x 11 3/8"= 101. 38 sq ft. 1 south elevation: 9 3 1/8" x 11 3/8" =101. 38 sq ft. 1 west elevation 39" x 16= sq ft. Onto existing canopy.. Connect 3 signs to existing wiring. All work behind property line as per sketch as per code. Expiration date: February 5, 2011 | Permit id: Com2010-16531 | |||||
Amend permit#com2010-02206 issued on 3-17- with plans#2010-147 to add electrical contractor as listed above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Expiration date: September 17, 2012 | Permit id: Com2010-08550 | |||||
Amend permit com2009-13269 issued on 07/06/09 with plans #2009-775 to add electrical (low voltage) contractor as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-20988 | |||||
Interior work - sprinkler - relocate & add 3 heads per light hazard. Largest pipe size 1" as per code. Expiration date: September 5, 2010 | Permit id: Com2010-04113 | |||||
Amend permit #com2009-13269 issued on 07/06/09 with plans #2009-775 to add electrical contractor(s) as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-15581 | |||||
Amend permit#com2009-13269 issued on 7/6/09 with plans#775 to add the following additional work: alterations to architectural mechanical electrical and sprinklers as per plans as per code. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-20356 | |||||
Interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2011-25413 | |||||
Amend permit#com2011-25413 issued on 11-29-12 with plans#2011-1749 to add low voltage contractor( varia system inc) as listedin the description. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2012-00373 | |||||
Amend permit#com2011-25413 issued on 11/29/11 with plans#2011-1749 to add contractors as listed aboveoriginal permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2011-27132 | |||||
Amend pemrit #com2011-204 issued on 10/11/2011 with plans #2011-1382 to add low voltage contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Expiration date: October 11, 2012 | Permit id: Com2011-27519 | |||||
Amend permit #com2011-25413 issued on 11/29/2011 with plans #2011-1749 to add 2nd electrical contractor as listed above. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2012-00117 | |||||
Amend permit #com2011-25413 issued on 11/29/2011 with plans #2011-1749 to add the following additional work: various revisions. As per plans and as per code. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2012-01147 | |||||
Non-structural alterations/exterior work - install stainless steel halo lit channel letters (illumatinated) 3. 91ft x 12. 95ft = 50. 63 sq ft; install (1) aluminum plaque pin mounted (non-illuminated) 1ft by 4 ft = 4sq ft. As per code/drawing. Activity done on private property. No city row. Awc per planning - per revised final design approval for inner harbor east parcel d pud #1 from november 7 2013 which designates the northern frontage of the legg mason buildings plinth as an allowable signage area. Expiration date: October 28, 2015 | Permit id: Com2015-03794 | |||||
Amend permit # com2010-02206 issued on 03/17/ with plans # 2010-47 to add electrical contractor as listed above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Expiration date: September 17, 2012 | Permit id: Com2010-05549 | |||||
Original permit description:(com2015-22361)minor renovation of existing space (making existing office smaller to add an additional meeting room) includes minor electrical/hvac to accommodate the design change one added interior door as per plans as per code. Expiration date: May 20, 2016 | Permit id: Com2015-28757 | |||||
Add 4 and relocate 4 sprinklers. As per code. Expiration date: June 30, 2016 | Permit id: Com2015-29058 | |||||
Non-structural alterations/interior work: install or relocate (10) low voltage communication outlets as per code. Expiration date: June 14, 2016 | Permit id: Com2015-29068 | |||||
Interior work (14 sq ft) - nonstructural alterations - build (3) new offices paint walls cove base relocate lights new switches & outlets - no hvac & sprinklers reqd - tech zone ceilings. Separate permit will be required for sprinkler system and fire alaram. 9th floor Expiration date: October 28, 2011 | Permit id: Com2011-07387 | |||||
Furnish and intall one 120v circuit for data equipment on 22nd floor as per code. Expiration date: November 18, 2016 | Permit id: Com2016-11898 | |||||
Install 34 low voltage wires for data as per code. Expiration date: January 14, 2017 | Permit id: Com2016-18167 | |||||
Relocate sprinklers and add 4 sprinklers as per code. Expiration date: December 20, 2016 | Permit id: Com2016-15802 | |||||
(use) portion of premises as an financial office Permit id: Use2016-03871 | |||||
Add 6 and relocate heads due to new tenant layout largest pipe size is 1 1 4" as per code. Expiration date: May 30, 2017 | Permit id: Com2016-30386 | |||||
Addition of low voltage devices to existing access control system as per code. Expiration date: June 1, 2017 | Permit id: Com2016-30556 | |||||
Original permit description:(com2015-22361)minor renovation of existing space (making existing office smaller to add an additional meeting room) includes minor electrical hvac to accommodate the design change one added interior door as per plans as per code. Expiration date: May 20, 2016 | Permit id: Com2015-28757 | |||||
Non-structural alterations exterior work - install stainless steel halo lit channel letters (illumatinated) 3. 91ft x 12. 95ft = 50. 63 sq ft; install (1) aluminum plaque pin mounted (non-illuminated) 1ft by 4 ft = 4sq ft. As per code drawing. Activity done on private property. No city row. Awc per planning - per revised final design approval for inner harbor east parcel d pud #1 from november 7 2013 which designates the northern frontage of the legg mason buildings plinth as an allowable signage area. Expiration date: October 28, 2015 | Permit id: Com2015-03794 | |||||
Non-structural alterations interior work: install or relocate (10) low voltage communication outlets as per code. Expiration date: June 14, 2016 | Permit id: Com2015-29068 | |||||
Minor renovation of existing space (making existing office smaller to add an additional meeting room) includes minor electrical hvac to accommodate the design change one added interior door as per plans as per code. Expiration date: May 20, 2016 | Permit id: Com2015-22361 | |||||
Relocate 7 sprinklers for architectural mod as per code. Expiration date: October 6, 2017 | Permit id: Com2017-07386 | |||||
Relocate 5 sprinklers for tenant modifications Expiration date: October 13, 2017 | Permit id: Com2017-07820 | |||||
To install 2 mag locks as per code Expiration date: December 9, 2017 | Permit id: Com2017-11536 | |||||
Install 1 outlets data voice in multipurpose rooms a & b and classroom c plus corridors as per code the 1 outlet will include tvs speakers mics and cameras as per code com2017-02987 Expiration date: December 9, 2017 | Permit id: Com2017-11528 | |||||
Low voltage voice data drops as per code Expiration date: December 19, 2017 | Permit id: Com2017-11638 | |||||
Install data cabling to 25 locations in renovated area as per code. Expiration date: June 19, 2017 | Permit id: Com2016-31958 | |||||
Use portion of premises level 24 for classrooms of higher education with functions including seated lectures and banquets. Permit id: Use2017-51737 | |||||
Relocate 34 sprinkler heads to accommodate new interior layout per nfpa 13 2010. As per code. Expiration date: February 9, 2018 | Permit id: Com2017-14330 | |||||
Amend permit #com2011-204 issued on 10 11 11 with plans #2011-1382 to add electrical contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Expiration date: October 11, 2012 | Permit id: Com2011-24179 | |||||
Amend permit #com2011-25413 issued on 11 29 2011 with plans #2011-1749 to add 2nd electrical contractor as listed above. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2012-00117 | |||||
Amend permit #com2009-13269 issued on 07 06 09 with plans #2009-775 to add electrical contractor(s) as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-15581 | |||||
Amend permit#com2009-13269 issued on 7 6 09 with plans#775 to add the following additional work: alterations to architectural mechanical electrical and sprinklers as per plans as per code. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-20356 | |||||
Audio video lv projectors monitors speakers. Work done to code. Expiration date: March 4, 2010 | Permit id: Com2009-20906 | |||||
Amend permit com2009-13269 issued on 07 06 09 with plans #2009-775 to add electrical (low voltage) contractor as listed above. Original permit description:(com2009-13269)interior alterations to floors ( & 21) for new tenant fitout as per plans as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: July 6, 2011 | Permit id: Com2009-20988 | |||||
Amend permit# com2011-204 issued on 10 11 11 with plans# 2011-1382 to add plumbing contractor as listed above original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Expiration date: October 11, 2012 | Permit id: Com2011-24802 | |||||
Amend permit#com2011-25413 issued on 11 29 11 with plans#2011-1749 to add contractors as listed aboveoriginal permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2011-27132 | |||||
Amend pemrit #com2011-204 issued on 10 11 2011 with plans #2011-1382 to add low voltage contractor as listed above. Original permit description:(com2011-20410)interior alterations to part of level 22 for new tenant fitout. As per plans and as per code. Expiration date: October 11, 2012 | Permit id: Com2011-27519 | |||||
Amend permit #com2011-25413 issued on 11 29 2011 with plans #2011-1749 to add the following additional work: various revisions. As per plans and as per code. Original permit description:(com2011-25413)interior work (12 524 sq ft) - new construction - new offices for jmi equity. 12 524 rsf- new space on 19th floor of the legg mason tower. Alterations for tenant fitout. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Expiration date: November 29, 2012 | Permit id: Com2012-01147 | |||||
Amend permit # com2010-02206 issued on 03 17 with plans # 2010-47 to add electrical contractor as listed above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Expiration date: September 17, 2012 | Permit id: Com2010-05549 | |||||
Amend permit#com2010-02206 issued on 3-17- w plans#2010-147 to add the plumber and hvac contractor as stated above. Original permit description:(com2010-02206)interior work 31 453 sq ftinterior renovations on 13th (partial) 8743 sq ft and 14th floor as per plans as per codeseperate permit is required for sprinkler system and fire alarm. Expiration date: September 17, 2012 | Permit id: Com2010-07307 | |||||
On 6th floor install (22) low voltage voice data drops and (1) low voltage phone feeded as per code. Expiration date: February 1, 2014 | Permit id: Com2013-15852 | |||||
Install 3 building mounted sidns 1 north elevation 93 1 8" x 11 3 8"= 101. 38 sq ft. 1 south elevation: 9 3 1 8" x 11 3 8" =101. 38 sq ft. 1 west elevation 39" x 16= sq ft. Onto existing canopy.. Connect 3 signs to existing wiring. All work behind property line as per sketch as per code. Expiration date: February 5, 2011 | Permit id: Com2010-16531 | |||||
Original permit description:(com2015-21510)partial remodel of existing offices as per plans as per code. Permit id: Com2015-28363 | |||||
Partial remodel of existing offices as per plans as per code. Permit id: Com2015-21510 | |||||
Original permit description:(com2014-18911)addition of 8 floors from level 22 to level on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit Permit id: Com2015-27569 | |||||
Original permit description:(com2015-00725)provide new fire alarm system tied into existing fire alarm system as per plans as per code. Permit id: Com2015-25808 | |||||
Original permit description:(com2014-02019)fit out of 3 model units of the four seasons residences. (the 3 model units are for marketing and sales only) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems alte Permit id: Com2015-25811 | |||||
"install new automatic wet type fire sprinkler system throughout new levels being added to existing four seasons building. (763) new sprinkler heads. Largest pipe size = 6"". Light & ordinary group i hazard as per plans asf per code." Permit id: Com2015-16346 | |||||
Provide new fire alarm system tied into existing fire alarm system as per plans as per code. Permit id: Com2015-00725 | |||||
Addition of 8 floors from level 22 to level on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit will be required for sprinkler system and Permit id: Com2014-18911 | |||||
Original permit description:(com2014-02019)fit out of 3 model units of the four seasons residences. (the 3 model units are for marketing and sales only) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems alte Permit id: Com2014-20199 | |||||
Fit out of 3 model units of the four seasons residences. (the 3 model units are for marketing and sales only) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems alterations. Permit id: Com2014-02019 | |||||
New fire alarm devices will be added for the new anthropologie store at the four seasons hotel. New addressable devices will be connected to the existing addressable device loop. The new visual alerting devices will be connected to a new booster power sup Permit id: Com2012-10867 | |||||
Modify existing sprinkler system. As per plan and as per code. Permit id: Com2012-08878 | |||||
New fire alarm devices will be added for the new anthropologie store at the four seasons hotel. New addressable devices will be connected to the existing addressable device loop. The new visual alerting devices will be connected to a new booster power supply. The new audible alerting devices will be connected to the existing speaker circuits Expiration date: December 26, 2012 | Permit id: Com2012-10867 | |||||
Original permit description:(com2014-02019)fit out of 3 model units of the four seasons residences. (the 3 model units are for marketing and sales only) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: May 28, 2016 | Permit id: Com2014-16341 | |||||
Addition of 8 floors from level 22 to level on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Expiration date: December 18, 2016 | Permit id: Com2014-18911 | |||||
Original permit description:(com2014-02019)fit out of 3 model units of the four seasons residences. (the 3 model units are for marketing and sales only) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: May 28, 2016 | Permit id: Com2015-02142 | |||||
Install new automatic wet type fire sprinkler system throughout new levels being added to existing four seasons building. (763) new sprinkler heads. Largest pipe size = 6". Light & ordinary group i hazard as per plans asf per code. Expiration date: February 26, 2016 | Permit id: Com2015-16346 | |||||
Original permit description:(com2014-18911)addition of 8 floors from level 22 to level on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Expiration date: December 18, 2016 | Permit id: Com2015-25809 | |||||
Renovation of the existing restaurant space (four seasons hotel - ground floor) the existing coffee shop lamill will be subdivided from the wit and wisdom restaurant the new oyster bar restaurant will include new restaurant and bar equipment as well as bathrooms as per plans as per code. Expiration date: January 19, 2018 | Permit id: Com2015-03743 | |||||
Amend permit#com2015-03743 issued on 1-19-16 w/plans#2015-325 to add the electrical contractor as stated above. Original permit description:(com2015-03743)renovation of the existing restaurant space (four seasons hotel - ground floor) the existing coffee shop lamill will be subdivided from the wit and wisdom restaurant the new oyster bar restaurant will include new restaurant and bar equipment as well as bathrooms as per plans as per code. Expiration date: January 19, 2018 | Permit id: Com2016-01720 | |||||
Install fire alarm devices including new audio/visual and addressable devices to accommodate tenant devices to be connected to existing speaker circuit as per plans as per code. Expiration date: September 1, 2016 | Permit id: Com2016-01643 | |||||
Original permit description:(com2015-19717) renovation (portion of wit and wisdom kitchen at the four seasons hotel) removal of the existing grill and exhaust hood new work stations and equipment to be installed as per plans and as per code. Expiration date: March 21, 2017 | Permit id: Com2016-07989 | |||||
Fit out of 5 model units of the four seasons residences on level 19 (the 5 model units and 3 existing units are for marketing and sales only) as per plans as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: April 27, 2018 | Permit id: Com2016-00685 | |||||
Original permit description:(com2016-00685)fit out of 5 model units of the four seasons residences on level 19 (the 5 model units and 3 existing units are for marketing and sales only) as per plans as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: April 27, 2018 | Permit id: Com2016-12272 | |||||
Amend permit: add contractor .(original permit:com2016-00685:fit out of 5 model units of the four seasons residences on level 19 (the 5 model units and 3 existing units are for marketing and sales only) as per plans as per code. Separate permits are required for sprinkler and fire alarm systems.)original permit description:(com2016-00685)fit out of 5 model units of the four seasons residences on level 19 (the 5 model units and 3 existing units are for marketing and sales only) as per plans as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: October 24, 2018 | Permit id: Com2016-12520 | |||||
Extend original permit.(original permit:com2015-00725:provide new fire alarm system tied into existing fire alarm system as per plans as per code.)original permit description:(com2015-00725)provide new fire alarm system tied into existing fire alarm system as per plans as per code. Expiration date: November 19, 2016 | Permit id: Com2016-13061 | |||||
Amend permit: add contractor .(original permit:com2016-09635:interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately.)original permit description:(com2016-09635)interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately. Expiration date: October 21, 2018 | Permit id: Com2016-28068 | |||||
Amend permit#com2015-03743 issued on 1-19-16 w/plans#2015-325 to add the plumber/gas fitter and hvac contractor as stated above. Original permit description:(com2015-03743)renovation of the existing restaurant space (four seasons hotel - ground floor) the existing coffee shop lamill will be subdivided from the wit and wisdom restaurant the new oyster bar restaurant will include new restaurant and bar equipment as well as bathrooms as per plans as per code. Expiration date: January 18, 2018 | Permit id: Com2016-01610 | |||||
Amend permit: add contractor .(original permit:com2015-22948:interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code.)original permit description:(com2015-22948)interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code. Expiration date: October 6, 2018 | Permit id: Com2016-30007 | |||||
Amend permit # com2014-18911 - plans 2014-1749 issued 12/18/14 to add one additional floor to the overall building. Addition of nine (9) floors from level 22 to level 31 on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit will be required for sprinkler system and fire alarm as well as interior fitout of the floors. Expiration date: March 21, 2018 | Permit id: Com2015-08636 | |||||
Amend permit: add contractor .(original permit:com2016-30074:amend permit: change scope of work:.(original permit:com2016-09635:interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately.))original permit description:(com2016-30074)amend permit: change scope of work:.(original permit:com2016-09635:interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately.) Expiration date: October 21, 2018 | Permit id: Com2016-30082 | |||||
Interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code. Expiration date: October 6, 2018 | Permit id: Com2015-22948 | |||||
Interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately. Expiration date: October 21, 2018 | Permit id: Com2016-09635 | |||||
Renovation (portion of wit and wisdom kitchen at the four seasons hotel) removal of the existing grill and exhaust hood new work stations and equipment to be installed as per plans and as per code. Expiration date: March 21, 2017 | Permit id: Com2015-19717 | |||||
Amend permit # com2014-18911 - plans 2014-1749 issued 12 18 14 to add one additional floor to the overall building. Addition of nine (9) floors from level 22 to level 31 on top of the existing four seasons hotel including concrete curtainwall elevators exit stairs and main mep services as per plans and as per code. Separate permit will be required for sprinkler system and fire alarm as well as interior fitout of the floors. Expiration date: March 21, 2018 | Permit id: Com2015-08636 | |||||
Install fire alarm devices including new audio visual and addressable devices to accommodate tenant devices to be connected to existing speaker circuit as per plans as per code. Expiration date: September 1, 2016 | Permit id: Com2016-01643 | |||||
Amend permit: add contractor .(original permit:com2016-09635:interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately.)original permit description:(com2016-09635)interior selective demo and alterations (to allow new tenant fitout for a bar and restaurant a2 assembly) on the 29th floor of the existing building as per plan and per code sprinkler system and fire alarm must be obtained separately. Expiration date: October 21, 2018 | Permit id: Com2017-05792 | |||||
Amend permit#com2015-03743 issued on 1-19-16 w plans#2015-325 to add the plumber gas fitter and hvac contractor as stated above. Original permit description:(com2015-03743)renovation of the existing restaurant space (four seasons hotel - ground floor) the existing coffee shop lamill will be subdivided from the wit and wisdom restaurant the new oyster bar restaurant will include new restaurant and bar equipment as well as bathrooms as per plans as per code. Expiration date: January 18, 2018 | Permit id: Com2016-01610 | |||||
Amend permit#com2015-03743 issued on 1-19-16 w plans#2015-325 to add the electrical contractor as stated above. Original permit description:(com2015-03743)renovation of the existing restaurant space (four seasons hotel - ground floor) the existing coffee shop lamill will be subdivided from the wit and wisdom restaurant the new oyster bar restaurant will include new restaurant and bar equipment as well as bathrooms as per plans as per code. Expiration date: January 19, 2018 | Permit id: Com2016-01720 | |||||
Fire alarm alterations to existing system as per plans as per code. Expiration date: December 13, 2017 | Permit id: Com2017-01520 | |||||
Fire alarm system alterations to existing system as per plans as per code. Expiration date: December 13, 2017 | Permit id: Com2017-01551 | |||||
Installation of a wet pipe system on floors thru 27 existing steel pipe to be removed and replaced with cpvc as per plans as per code. Expiration date: December 7, 2017 | Permit id: Com2016-26553 | |||||
Amend permit com2015-22948 issued on 11 23 16 with plans #2015-1918 to add electrical contractor as listed above. (original permit:com2015-22948:interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code.)original permit description:(com2015-22948)interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code. Expiration date: October 6, 2018 | Permit id: Com2016-30507 | |||||
Amend permit com2015-22948 issued on 10 06 16 with plans @2015-1918 to add plumbing gas fitter and hvac contractors as listed above. (original permit:com2015-22948:interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code.)original permit description:(com2015-22948)interior fitout of the level 28 amenity floor at the four seasons condo includes lounge restrooms meeting rooms pool gym and outdoor terraces as designed as per plans as per code. Expiration date: October 6, 2018 | Permit id: Com2016-30508 | |||||
Relocation of 59 sprinkler heads from existing outlets and the addition of 21 sprinkler heads as per plans as per code. Expiration date: July 26, 2017 | Permit id: Com2016-31156 | |||||
Amend permit: add low voltage contractor ( securex dba smart touch) .(original permit:com2016-21731:interior condominium fit-out and corridors from level through 27 (floors thru 25 will have 8 dus each 26th floor -4 dus 27th floor- 2 dus). Separate permits are required for sprinkler and fire alarm systems alterations.)original permit description:(com2016-21731)interior condominium fit-out and corridors from level through 27 (floors thru 25 will have 8 dus each 26th floor -4 dus 27th floor- 2 dus). Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: December 7, 2018 | Permit id: Com2016-31207 | |||||
Amend permit: add contractor .(original permit:com2016-21731:interior condominium fit-out and corridors from level through 27 (floors thru 25 will have 8 dus each 26th floor -4 dus 27th floor- 2 dus). Separate permits are required for sprinkler and fire alarm systems alterations.)original permit description:(com2016-21731)interior condominium fit-out and corridors from level through 27 (floors thru 25 will have 8 dus each 26th floor -4 dus 27th floor- 2 dus). Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: December 7, 2018 | Permit id: Com2016-31230 |