Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install (18) geotechnical borings at the south capital street corridon project stage 1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. ( 8" diameter by to deep ) Date: July 10, 2012 Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200313 | |||||
The proposed work consists of proposing 18 soil test borings and 3 geoprobes for a total of 21. The diamter for the borings and the geoprobes will be between two to six inches and the depth will be between ten to one hundred and twenty feet. The borings will be drilled near and around south capitol street bridge. Suitland parkway, barry road, defense blvd, r st and i 295. Methods of drilling hollow stem auger mud rotary and sodium based bentonite as per work plans report, site plans, dc well construction application, dc will schematic application and specification for ddot. To obtain ddoe water quality and ddoe soil erosion, only for approval. Date: May 16, 2013 Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300182 | |||||
The proposed work consists of proposing 18 soil test borings and 3 geoprobes for a total of 21. The diamter for the borings and the geoprobes will be between two to six inches and the depth will be between ten to one hundred and twenty feet. The borings will be drilled near and around south capitol street bridge. Suitland parkway, barry road, defense blvd, r st and i 295. Methods of drilling hollow stem auger mud rotary and sodium based bentonite as per work plans report, site plans, dc well construction application, dc will schematic application and specification for ddot. To obtain ddoe water quality and ddoe soil erosion, only for approval. Date: May 16, 2013 Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300182 | |||||
SCORE 99 Install (23) geotechnical borings at the south capital street corridon project stage 1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. ( 8" diameter by to deep ) Date: July 24, 2012 Contractor: Luis Garcia Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200214 | |||||
Install (18) geotechnical borings at the south capital street corridon project stage 1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. ( 8" diameter by to deep ) Date: July 10, 2012 Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200313 | |||||
SCORE 98 Installing of seven (7) 3-inch diameter direct-push borings to depths of feet below grade Date: July 2, 2014 Contractor: None Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400355 |