SCORE

WALTON ENGINEERING

ABOUT WALTON ENGINEERING

Walton Engineering specializes in:

Walton Engineering offers services:

Based on the information received from , associated with Walton Engineering over the past .

If you are considering hiring Walton Engineering for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Walton Engineering has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
84
33 Cesar Chavez St San Francisco Ca
Existing clean air separator ( cas) enhanced vapor recovery ( epr) installed to comply with sffd violation # 5349 by adding rated enclosure and bollards per cfc 312. 2 # 5 and cfc 312. 2 #2.
Date:  July 9, 2009
Value:   $33,000
Contractor: Walton Engineering

Current use: Filling/service | Permit id: #200907092322
2009/07/09330008433 Cesar Chavez St San Francisco CaWalton Engineering
SCORE
84
2301 19th Av San Francisco Ca
Existing cas evr installed. Need to make complaint per sffd violation # 5278 by adding rated enclosure.
Date:  July 9, 2009
Value:   $33,000
Contractor: Walton Engineering

Current use: Filling/service | Permit id: #200907092325
2009/07/0933000842301 19th Av San Francisco CaWalton Engineering
SCORE
84
20 19th Av San Francisco Ca
Existing cas evr intalled to comply with sffd violation 5277
Date:  July 9, 2009
Value:   $33,000
Contractor: Walton Engineering

Current use: Filling/service | Permit id: #200907092328
2009/07/09330008420 19th Av San Francisco CaWalton Engineering
SCORE
84
2 Toland St San Francisco Ca
Existing cas evr installed to comply with sffd violation # 5348
Date:  July 9, 2009
Value:   $33,000
Contractor: Walton Engineering

Current use: Filling/service | Permit id: #200907092331
2009/07/0933000842 Toland St San Francisco CaWalton Engineering
SCORE
84
26 03rd St San Francisco Ca
Clear fire dept. Violation #5279 by installing bollards to comply with sffd vapor recovery checklist dated 07 24 2008.
Date:  July 9, 2009
Value:   $33,000
Contractor: Walton Engineering

Current use: Filling/service | Permit id: #200907092333
2009/07/09330008426 03rd St San Francisco CaWalton Engineering
SCORE
84
2301 19th Av San Francisco Ca
Gas station - fueling area. Remove and replace 3 fuel dispensers.
Date:  April 14, 2011
Contractor: Walton Engineering

Permit type: Electrical permit | Permit status: Complete | Permit id: E201104043994
2011/04/140842301 19th Av San Francisco CaWalton Engineering
SCORE
84
18 Lombard St San Francisco Ca
Gas station fuel system: replace electrical for install of new fuel tanks and dispensers.
Date:  October 16, 2012
Contractor: Walton Engineering

Permit type: Electrical permit | Permit status: Issued | Permit id: E201210165979
2012/10/1608418 Lombard St San Francisco CaWalton Engineering
SCORE
84
35 Mission St San Francisco Ca
Replace electrical for installation of new fuel tanks & dispensers.
Date:  October 11, 2012
Contractor: Walton Engineering

Permit type: Electrical permit | Permit status: Complete | Permit id: E201209054918
2012/10/1108435 Mission St San Francisco CaWalton Engineering
SCORE
84
551 03rd St San Francisco Ca
Replace electrical for installation of new fuel tanks & dispensers
Date:  September 19, 2012
Contractor: Walton Engineering

Permit type: Electrical permit | Permit status: Complete | Permit id: E201209054917
2012/09/19084551 03rd St San Francisco CaWalton Engineering
SCORE
84
705 Harbor Pointe Pl, West Sacramento, Ca San Diego Ca
Install (n) underground tank and fuel dispenser under (e) canopy (shell gas)
Date:  April 6, 2009
Contractor: Walton Engineering

Permit id: 09-0102 | Parcel: 014794001000
2009/04/06084705 Harbor Pointe Pl, West Sacramento, Ca San Diego CaWalton Engineering
SCORE
84
3022 Evergreen Ave, West Sacramento, Ca San Diego Ca
Install 30 gal above ground storage tank & dispenser for alternative fuel. (interstate card lock)
Date:  April 20, 2009
Contractor: Walton Engineering

Permit id: 09-0112 | Parcel: 067120039000
2009/04/200843022 Evergreen Ave, West Sacramento, Ca San Diego CaWalton Engineering
SCORE
84
38 Channel Dr, West Sacramento, Ca San Diego Ca
Install 2 above ground storage tanks (30 & 20 gallons) & fuel dispensers (interstate oil)
Date:  May 29, 2009
Contractor: Walton Engineering

Permit id: 09-0146 | Parcel: 067030042000
2009/05/2908438 Channel Dr, West Sacramento, Ca San Diego CaWalton Engineering
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.