SCORE

ULTIMATE 3 PHASE ELECTRIC

ABOUT ULTIMATE 3 PHASE ELECTRIC

Ultimate 3 Phase Electric specializes in:

Ultimate 3 Phase Electric offers services:

Based on the information received from , associated with Ultimate 3 Phase Electric over the past .

If you are considering hiring Ultimate 3 Phase Electric for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Ultimate 3 Phase Electric has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
169 Leclaire Ave Chicago Il
Repair and replace 5 8"" ul gyp bd with electrical, replace: doors, flooring, windows, interior stair railings, roofing, tiles, cabinets, all work same as exsting.
Date:  December 11, 2006
Value:   $42,000

Permit type: Permit - easy permit | Permit id: 100152226
2006/12/1142000100169 Leclaire Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
6001 Michigan Ave Chicago Il
Install 2-1200a services as per plan# 21020. Approved for (18)units per service.
Date:  December 11, 2006

Permit type: Permit - electric wi | Permit id: 100152975
2006/12/1101006001 Michigan Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
4141 77th Pl Chicago Il
Upgrade 100a seervice to 200a and replace the c. B. Panel.
Date:  May 11, 2007
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100169290
2007/05/1125001004141 77th Pl Chicago IlUltimate 3 Phase Electric
SCORE
100
1635 Jefferson St Chicago Il
Replace eight outlets with gci type receptacles. Close openings in meter bank and j-boxes. Remove tandem breackers (2) and replace with single breakers (4).
Date:  May 11, 2007
Value:   $450

Permit type: Permit - electric wi | Permit id: 100170854
2007/05/114501001635 Jefferson St Chicago IlUltimate 3 Phase Electric
SCORE
100
357 Homan Ave Chicago Il
1200a 3-phase service upgrade.(18)unit bldg. Plan# 21253
Date:  April 5, 2007

Permit type: Permit - electric wi | Permit id: 100171630
2007/04/050100357 Homan Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
5544 Sayre Ave Chicago Il
Service upgrade to 200a and c. B. Panel
Date:  June 4, 2007
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100181957
2007/06/0425001005544 Sayre Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
5315 Narragansett Ave Chicago Il
Add lights (12 cans) with switch and outlets (5) in basement. 2 - 15a circuits and 1-20a circuit
Date:  June 26, 2007
Value:   $800

Permit type: Permit - electric wi | Permit id: 100185466
2007/06/268001005315 Narragansett Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
9321 Cottage Grove Ave Chicago Il
Replace existing 800 amp service (exterior only). Emergency service call vandals tore down service & stole cable.
Date:  July 5, 2007
Value:   $6,800

Permit type: Permit - electric wi | Permit id: 100187427
2007/07/0568001009321 Cottage Grove Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
2259 Cermak Rd Chicago Il
Replace existing 200 amp service, 3 meter bank, 3 - 100a panels, and correct existing electrical violations.
Date:  July 23, 2007
Value:   $6,500

Permit type: Permit - electric wi | Permit id: 100188925
2007/07/2365001002259 Cermak Rd Chicago IlUltimate 3 Phase Electric
SCORE
100
3250 Douglas Blvd Chicago Il
Repair replace 5 8"" drywall. Electrical repairs to include:new circuits, new 200 amp. Service, ten lighting fixtures. All work subject to field inspection.
Date:  November 1, 2007
Value:   $9,000

Permit type: Permit - easy permit | Permit id: 100194806
2007/11/0190001003250 Douglas Blvd Chicago IlUltimate 3 Phase Electric
SCORE
100
3145 May St Chicago Il
Upgrade existing service to 400amps. Install six meter bank with 100a per. Install new 100a panels 5 in basement 1 in 3rd floor. Plan# 21523
Date:  September 14, 2007
Value:   $8,600

Permit type: Permit - electric wi | Permit id: 100196826
2007/09/1486001003145 May St Chicago IlUltimate 3 Phase Electric
SCORE
100
6501 60th Pl Chicago Il
Refer. To reno_perm #100188834 change of electrical contractor.
Date:  September 8, 2007
Value:   $5,750

Permit type: Permit - electric wi | Permit id: 100198153
2007/09/0857501006501 60th Pl Chicago IlUltimate 3 Phase Electric
SCORE
100
4200 Washington Blvd Chicago Il
Upgrade service to 1200a, install new meters with 60a mains, new main breaker panel in units (26). Plan# 21552 add 2 kitchen and 1 bathroom @ 20a total of 78 ckts, 1 arc fualt ckt @15a per unit total of 26 ckts. Replace defective and ungrounded receptacles. Correct existing violations. Note also to include permit #100177846 (em lights) under new contractor.
Date:  October 1, 2007
Value:   $120,000

Permit type: Permit - electric wi | Permit id: 100200713
2007/10/011200001004200 Washington Blvd Chicago IlUltimate 3 Phase Electric
SCORE
100
4400 Washington Blvd Chicago Il
Upgrade service to 1200a, install new meters with 60a mains,new main breaker panels in units (23). Add 2 kitchen, 1 bathroom @ 20a total of 69 ckts, 1 arc fault ckt @ 15a per unit total of 23ckts. Replace defective and ungrounded receptacles. Correct existing violations. Plan# 21551
Date:  October 1, 2007
Value:   $120,000

Permit type: Permit - electric wi | Permit id: 100200714
2007/10/011200001004400 Washington Blvd Chicago IlUltimate 3 Phase Electric
SCORE
100
5927 California Ave Chicago Il
Service upgrade from 60a to 100a.
Date:  December 6, 2007
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100215175
2007/12/0615001005927 California Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
400 Randolph St Chicago Il
Remove replace upper and lower kitchen cabinets, install new counter top and back splash. Repairs for unit # 3112. Replace kitchen sink all work subject to field inspection.
Date:  June 6, 2008
Value:   $12,000

Permit type: Permit - easy permit | Permit id: 100241236
2008/06/0612000100400 Randolph St Chicago IlUltimate 3 Phase Electric
SCORE
100
2640 California Ave Chicago Il
Upgrade 60a to100a service,add 10 circuits 20a each.
Date:  June 30, 2008
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100245176
2008/06/3015001002640 California Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
80 Cermak Rd Chicago Il
Existing salon, add circuits for work stations
Date:  July 25, 2008
Value:   $1,800

Permit type: Permit - electric wi | Permit id: 100248419
2008/07/25180010080 Cermak Rd Chicago IlUltimate 3 Phase Electric
SCORE
100
2725 51st St Chicago Il
Service upgarde 60a to 100a, 2 meters 1 public. Replace painted receptacles, separate circuits to 1st and 2nd and public area. Correct violation per hansen case #2244937
Date:  February 11, 2009
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100249749
2009/02/1125001002725 51st St Chicago IlUltimate 3 Phase Electric
SCORE
100
5114 Natchez Ave Chicago Il
Service upgrade 60a original to 100a new.
Date:  September 11, 2008
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100249759
2008/09/1125001005114 Natchez Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
21 59th St Chicago Il
Change of contractor to permit # 100078169
Date:  September 11, 2008
Value:   $75

Permit type: Permit - electric wi | Permit id: 100255563
2008/09/117510021 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
1735 Luna Ave Chicago Il
Change of electrical contractor to permit #100238340
Date:  October 3, 2008
Value:   $100

Permit type: Permit - electric wi | Permit id: 100258533
2008/10/031001001735 Luna Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
2750 Kildare Ave Chicago Il
Add one meter to complete work on original permit b20215789, note 3 meter bank exists, only 2 meters installed, permit required for com ed to install 3rd meter.
Date:  March 9, 2009
Value:   $1,400

Permit type: Permit - electric wi | Permit id: 100279583
2009/03/0914001002750 Kildare Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
4744 Rice St Chicago Il
Install 100a service, replacement original service stolen.
Date:  March 9, 2009
Value:   $1,200

Permit type: Permit - electric wi | Permit id: 100280124
2009/03/0912001004744 Rice St Chicago IlUltimate 3 Phase Electric
SCORE
100
21 59th St Chicago Il
Revision to permit 100078169, increase service size from 800a to 1200a. Also add a 100a public service.#22238
Date:  April 3, 2009
Value:   $1

Permit type: Permit - electric wi | Permit id: 100284573
2009/04/03110021 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
2533 Pope John Paul Ii Dr Chicago Il
Change of contractor on original permit #100218087
Date:  April 14, 2009
Value:   $1

Permit type: Permit - electric wi | Permit id: 100284828
2009/04/1411002533 Pope John Paul Ii Dr Chicago IlUltimate 3 Phase Electric
SCORE
100
3115 38th St Chicago Il
Correct electrical violations; cover remove exposed wire, repair replace defectice switches,outlets and fixtures.
Date:  April 27, 2009
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100288129
2009/04/2715001003115 38th St Chicago IlUltimate 3 Phase Electric
SCORE
100
2327 109th St Chicago Il
100amp service replacement, relocate first attachment and new panel.
Date:  June 27, 2009
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100298468
2009/06/2715001002327 109th St Chicago IlUltimate 3 Phase Electric
SCORE
100
7508 Wolcott Ave Chicago Il
Service upgrade from 100 to 200amp 3 d. U. Plus 1 common, seperate circuits accordingly as required.
Date:  January 5, 2010
Value:   $2,000

Permit type: Permit - electric wi | Permit id: 100306299
2010/01/0520001007508 Wolcott Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
310 Kostner Ave Chicago Il
Correct existing violations, nov#09lo209362. Add circuit breakers for multiple conductors and gfci for kitchen and bath, cover open j-box,install s. D. And carbon monoxide detectors. Label panel directory.
Date:  August 27, 2009
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100307653
2009/08/272500100310 Kostner Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
4744 Rice St Chicago Il
Change of electrical contractor to permit 100229620 issued 12 17 2009.
Date:  March 17, 2010
Value:   $1,000

Permit type: Permit - electric wi | Permit id: 100329058
2010/03/1710001004744 Rice St Chicago IlUltimate 3 Phase Electric
SCORE
100
2634 35th Pl Chicago Il
Correct electrical violations, add public meter and upgrade to a 3 meter 200amp service.
Date:  February 10, 2010
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100329177
2010/02/1025001002634 35th Pl Chicago IlUltimate 3 Phase Electric
SCORE
100
2440 62nd St Chicago Il
Install 200amp service, 4 meters plus 1 public meter.
Date:  February 15, 2010
Value:   $2,500

Permit type: Permit - electric wi | Permit id: 100330373
2010/02/1525001002440 62nd St Chicago IlUltimate 3 Phase Electric
SCORE
100
6821 Wabash Ave Chicago Il
Replace old with new 100a service, 1 panel and 1 meter at coach house.
Date:  May 24, 2010
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100345260
2010/05/2415001006821 Wabash Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
5452 Halsted St Chicago Il
Replace 400a service, relocate 4 meters and existing panels remain.
Date:  July 21, 2010
Value:   $4,500

Permit type: Permit - electric wi | Permit id: 100345263
2010/07/2145001005452 Halsted St Chicago IlUltimate 3 Phase Electric
SCORE
100
5830 Moody Ave Chicago Il
Service upgrade to a 100a service and new panel.
Date:  June 22, 2010
Value:   $1,300

Permit type: Permit - electric wi | Permit id: 100347693
2010/06/2213001005830 Moody Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
2100 52nd Pl Chicago Il
Repairs to correct plumbing violations, replace 2 sheets of drywall and electrical work. All work subject to field inspection.
Date:  June 18, 2010
Value:   $9,200

Permit type: Permit - easy permit | Permit id: 100349569
2010/06/1892001002100 52nd Pl Chicago IlUltimate 3 Phase Electric
SCORE
100
3614 26th St Chicago Il
Replace 200a 3phase service.
Date:  July 6, 2010
Value:   $4,800

Permit type: Permit - electric wi | Permit id: 100349878
2010/07/0648001003614 26th St Chicago IlUltimate 3 Phase Electric
SCORE
100
3449 59th St Chicago Il
Replace existing 200a service and old plug fuse panels, relocating service install new 200a service with 4 meters and panels.
Date:  August 27, 2010
Value:   $4,500

Permit type: Permit - electric wi | Permit id: 100360248
2010/08/2745001003449 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
3449 59th St Chicago Il
Change fo contractor to original permit #100355603 from garza electric to ultimate 3 phase electric.
Date:  September 9, 2010
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100362503
2010/09/0915001003449 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
2229 Cullerton St Chicago Il
Upgrade service to 200a and correct electrical violations.
Date:  December 7, 2010
Value:   $5,500

Permit type: Permit - electric wi | Permit id: 100372211
2010/12/0755001002229 Cullerton St Chicago IlUltimate 3 Phase Electric
SCORE
100
6410 California Ave Chicago Il
Upgrade 60a service to 100a.
Date:  November 20, 2010
Value:   $1,500

Permit type: Permit - electric wi | Permit id: 100373701
2010/11/2015001006410 California Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
6400 California Ave Chicago Il
Upgrade service to 200a, new 4 meter bank and panels including public.
Date:  December 7, 2010
Value:   $4,500

Permit type: Permit - electric wi | Permit id: 100375422
2010/12/0745001006400 California Ave Chicago IlUltimate 3 Phase Electric
SCORE
100
3452 59th St Chicago Il
Emergency 200a service replacement and balance load, 3 meters.
Date:  January 14, 2011
Value:   $3,500

Permit type: Permit - electric wi | Permit id: 100378680
2011/01/1435001003452 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
3452 59th St Chicago Il
Replace 4 exit signs with battery backup exit sign lights.
Date:  May 10, 2011
Value:   $1,140

Permit type: Permit - electric wi | Permit id: 100389586
2011/05/1011401003452 59th St Chicago IlUltimate 3 Phase Electric
SCORE
100
4141 77th Pl Chicago Il
Add one 20a circuit to kitchen.
Date:  August 9, 2012
Value:   $300

Permit type: Permit - electric wi | Permit id: 100452107
2012/08/093001004141 77th Pl Chicago IlUltimate 3 Phase Electric
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.