Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 2211 H Street Nw Washington Dc Proposed work will be a continuance of phase 1 construction permit, which is currently being filed with a tracking number 59652. The work of phase 3 will begin from the proposed manhole vault cv24 shown in phase 1 of this project. From that point a 3 wide trench will be dug 135. 97lf east where it will then split into 2 separate runs. The first run will head 90degrees north with a 6 radius then continue 15. 53lf north where proposed fiber will be capped for future use. The other section of the split will continue 97. 48lf east crossing 22nd street nw where it will take a degree turn south at a 12 radius. From the end of that 12 radius the run will split a second time. The first run will head 19lf north where the proposed fiber will be capped for future use. The second run will continue 76. 48lf south sidewalk and roadway from the end of the 12 radius crossing "h" street nw till it connects with the existing george washington manhole. Date: May 4, 2011 Contractor: Tyler Kohler Client: Amy Argasinski | Permit type: Excavation; telecom ml conduits (trench) | Permit status: Cancel/withdrawn | Expiration date: May 30, 2011 | |||||
SCORE 79 23 I Street Nw Washington Dc To install 2 linear feet of fiber wire and 2 manhole vaults. Fiber to connect to the building at 23 "i" street and 2223 "h" street. The fiber is planned to start at proposed manhole vault and extend 1 lf west to the corner of 23rd st nw and " h" st nw, the run will then take a degree turn north heading lf to the second proposed vault were you will find the fiber-line to continue north along 23rd st. The attached plans and conditions are apart of this permit if steel plates are used at this job site an additional permit is needed. Date: May 5, 2011 Contractor: Tyler Kohler Client: Amy Argasinski | Permit type: Excavation; telecom ml conduits (trench), excavation; vault(s) lxw | Permit status: Cancel/withdrawn | Expiration date: June 18, 2011 | |||||
SCORE 79 23 I Street Nw Washington Dc To install 2 linear feet of fiber-wire and 2 manhole vaults. Fiber to connect to the building at 23 "i" street and 2223 "h" street. The fiber is planned to start at proposed manhole vault and extend 1 lf west to the corner of 23rd st nw and "h" st nw, the run will then take a degree turn north heading 60lf to the second proposed vault were you will find it continue north along 23rd st. The attached plans and condition are apart of this permit if steel plates are used at this job site an additional permit is needed. Date: January 13, 2011 Contractor: Tyler Kohler Permit type: Paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), excavation; vault(s) lxw | Permit status: Cancel/withdrawn | Expiration date: May 6, 2011 | |||||
SCORE 79 Date: May 5, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: May 9, 2011 | Permit id: Pa10026299 | |||||
SCORE 79 Date: April 11, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: April 23, 2011 | Permit id: Pa10022245-R1 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: Revoked | Expiration date: April 15, 2011 | Permit id: 0 | |||||
SCORE 79 23 I Street Nw Washington Dc Paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), excavation; vault(s) lxw Contractor: Tyler Kohler Permit status: 3 | Expiration date: May 6, 2011 | Permit id: 0 | |||||
SCORE 79 Date: May 6, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: May 28, 2011 | Permit id: Pa10025907 | |||||
SCORE 79 Date: May 23, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: May 28, 2011 | Permit id: Pa10027742 | |||||
SCORE 79 Date: May 16, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: June 10, 2011 | Permit id: Pa10026241 | |||||
SCORE 79 Date: June 30, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: July 15, 2011 | Permit id: Pa10022496 | |||||
SCORE 79 Date: March 30, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: April 23, 2011 | Permit id: Pa10022251 | |||||
SCORE 79 Date: April 11, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: April 23, 2011 | Permit id: Pa10022245-R1 | |||||
SCORE 79 Date: July 14, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: July 23, 2011 | Permit id: Pa10032934 | |||||
SCORE 79 Date: March 30, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: April 23, 2011 | Permit id: Pa10022251 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: Rejected | Expiration date: May 31, 2011 | Permit id: 0 | |||||
SCORE 79 Date: March 30, 2011 Contractor: Tyler Kohler Permit status: Expired | Expiration date: April 8, 2011 | Permit id: Pa10022245 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: May 30, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: June 18, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: June 16, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: May 30, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: June 18, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: 3 | Expiration date: June 16, 2011 | Permit id: 0 | |||||
SCORE 79 23 I Street Nw Washington Dc Paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), excavation; vault(s) lxw Contractor: Tyler Kohler Permit status: 3 | Expiration date: May 6, 2011 | Permit id: 0 | |||||
SCORE 79 23 I Street Nw Washington Dc To install 2 linear feet of fiber wire and 2 manhole vaults. Fiber to connect to the building at 23 "i" street and 2223 "h" street. The fiber is planned to start at proposed manhole vault and extend 1 lf west to the corner of 23rd st nw and " h" st nw, the run will then take a degree turn north heading lf to the second proposed vault were you will find the fiber-line to continue north along 23rd st. The attached plans and conditions are apart of this permit if steel plates are used at this job site an additional permit is needed. Date: January 25, 2011 Contractor: Tyler Kohler Client: Amy Argasinski | Permit type: Excavation; telecom ml conduits (trench), excavation; vault(s) lxw | Permit status: Permit expired | Expiration date: May 4, 2011 | Permit id: Pa59652 | |||||
SCORE 79 23 I Street Nw Washington Dc Proposed work will be a continuance of phase 1 construction from the construction permit currently being filed with a tracking number of 59652. The work during phase 2 of this project will begin at the end of phase 1 construction, which is approximately 97 linear feet north sidewalk and roadway from the intersection of 23rd st. Nw and "h" st. Nw. From this point a 3ft trench will be dug 282 linear feet north and the head west at a 35 radius until connecting to existing george washington manhole found along the abandoned "i" st. Nw. The attached plans and conditions are apart of this permit if steel plates are used at this job site an additional permit is needed. Date: January 28, 2011 Contractor: Tyler Kohler Client: Amy Argasinski | Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: May 4, 2011 | Permit id: Pa59734 | |||||
SCORE 79 2211 H Street Nw Washington Dc Proposed work will be a continuance of phase 1 construction permit, which is currently being filed with a tracking number 59652. The work of phase 3 will begin from the proposed manhole vault cv24 shown in phase 1 of this project. From that point a 3 wide trench will be dug 135. 97lf east where it will then split into 2 separate runs. The first run will head 90degrees north with a 6 radius then continue 15. 53lf north where proposed fiber will be capped for future use. The other section of the split will continue 97. 48lf east crossing 22nd street nw where it will take a degree turn south at a 12 radius. From the end of that 12 radius the run will split a second time. The first run will head 19lf north where the proposed fiber will be capped for future use. The second run will continue 76. 48lf south sidewalk and roadway from the end of the 12 radius crossing "h" street nw till it connects with the existing george washington manhole. Date: February 4, 2011 Contractor: Tyler Kohler Client: Amy Argasinski | Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: May 4, 2011 | Permit id: Pa59926 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: Revoked | Expiration date: April 15, 2011 | Permit id: 0 | |||||
SCORE 79 Contractor: Tyler Kohler Permit status: Rejected | Expiration date: May 31, 2011 | Permit id: 0 |