Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 72 4 K Street Nw Washington Dc A 14 floor residential building with first floor retail and a 3 level underground parking structure will be constructed. The sidewalk along k street nw will be rebuilt with large tree planter areas. The sidewalk along 4th st nw will remain as-is during construction except for the existing curb cut, which will be eliminated. A portion of the public alley will be re-paved due to the construction and installation of utilities. Date: March 30, 2016 Contractor: Troy Balkema Permit type: Paving; alley(s), paving; curb & gutter(s), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, projections; awning(s) | Permit status: Revise and resubmit | Expiration date: May 31, 2017 | |||||
SCORE 72 4 K Street Nw Washington Dc Paving; alley(s), paving; curb & gutter(s), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, projections; awning(s) Contractor: Troy Balkema Permit status: 1 | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 72 4 K Street Nw Washington Dc A 14 floor residential building with first floor retail and a 3 level underground parking structure will be constructed. The sidewalk along k street nw will be rebuilt with large tree planter areas. The sidewalk along 4th st nw will remain as-is during construction except for the existing curb cut, which will be eliminated. A portion of the public alley will be re-paved due to the construction and installation of utilities. Contractor: Troy Balkema Permit status: Approved (pending payment | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 72 4 K Street Nw Washington Dc A 14 floor residential building with first floor retail and a 3 level underground parking structure will be constructed. The sidewalk along k street nw will be rebuilt with large tree planter areas. The sidewalk along 4th st nw will remain as-is during construction except for the existing curb cut, which will be eliminated. A portion of the public alley will be re-paved due to the construction and installation of utilities. Date: August 2, 2017 Contractor: Troy Balkema Permit type: Paving; alley(s), paving; curb & gutter(s), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, projections; awning(s) | Permit status: Issued | Expiration date: October 30, 2017 | Permit id: Pa125509-R1 | |||||
SCORE 72 4 K Street Nw Washington Dc A 14 floor residential building with first floor retail and a 3 level underground parking structure will be constructed. The sidewalk along k street nw will be rebuilt with large tree planter areas. The sidewalk along 4th st nw will remain as-is during construction except for the existing curb cut, which will be eliminated. A portion of the public alley will be re-paved due to the construction and installation of utilities. Contractor: Troy Balkema Permit type: Paving; alley(s), paving; curb & gutter(s), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, projections; awning(s) | Permit status: Issued | Expiration date: December 29, 2017 | Permit id: Pa125509-R2 | |||||
SCORE 72 4 K Street Nw Washington Dc A 14 floor residential building with first floor retail and a 3 level underground parking structure will be constructed. The sidewalk along k street nw will be rebuilt with large tree planter areas. The sidewalk along 4th st nw will remain as-is during construction except for the existing curb cut, which will be eliminated. A portion of the public alley will be re-paved due to the construction and installation of utilities. Date: June 30, 2017 Contractor: Troy Balkema Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa125509 |