Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 1295 1299 Boylston St Boston Ma Renovations to existing office space on floors 1-4 for childrens hospital. Work to include replacement of carpet ceiling tiles painting hvac diffusers and lighting. No new sprinkler work or fire alarm. Egress not affected. Permit type: Renovations -interio | Permit status: Open | Current use: Comm | Permit id: Sf494640 | Parcel: 0504210010 | |||||
SCORE 99 New Sudbury St Boston Ma 02114 Lpr demolition and reconstruction of parking garage ramps and parking decks on the first four levels of the existing garage to enable the future residential building construction included is the relocation of 1 electric room and the rerouting of storm and sanitary drain piping. And standpipe Client: Bulfinch Congre | Permit type: Other | Permit status: Open | Current use: Comm | Permit id: Alt532297 | Parcel: 0302700000 | |||||
SCORE 99 Date: July 15, 2015 Contractor: Tishman Construction Permit type: Bfd other | Permit status: Na | Permit id: Fdc490891 | Parcel: 0504210010 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Demo/renovations; drywall flooring ceiling painting of common area space on the 3rd floor Date: June 19, 2015 Contractor: Tishman Construction Permit type: Bfd other | Permit status: Na | Permit id: Fdc483051 | Parcel: 0304540000 | |||||
SCORE 99 New Sudbury St Boston Ma 02114 Demo/renovations to build out office space to include drywall painting ceiling flooring Date: July 14, 2015 Contractor: Tishman Construction Permit type: Bfd other | Permit status: Na | Permit id: Fdc489510 | Parcel: 0302700000 | |||||
SCORE 99 Date: March 10, 2015 Contractor: Tishman Construction Permit type: Bfd other | Permit status: Na | Permit id: Fdc452155 | Parcel: 0304540000 | |||||
SCORE 99 1295 1299 Boylston S Boston Ma Renovations to existing office space on floors 1-4 for childrens hospital. Work to include replacement of carpet ceiling tiles painting hvac diffusers and lighting. No new sprinkler work or fire alarm. Egress not affected. Client: Snh Medical Office Props Trust | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf494640 | Parcel: 0504210010 | |||||
SCORE 99 Date: February 24, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40228874201 | |||||
SCORE 99 Date: October 4, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30103703601 | |||||
SCORE 99 Date: February 22, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30103703602 | |||||
SCORE 99 Date: January 30, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40119127801 | |||||
SCORE 99 Date: May 4, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30095230602 | |||||
SCORE 99 Date: December 13, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20070113301 | |||||
SCORE 99 Date: June 4, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40124029701 | |||||
SCORE 99 Date: June 23, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20062467201 | |||||
SCORE 99 Date: January 4, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20062467202 | |||||
SCORE 99 Date: March 29, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20052979402 | |||||
SCORE 99 Date: November 12, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20052979401 | |||||
SCORE 99 Date: February 13, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20072628703 | |||||
SCORE 99 Date: May 10, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20072628701 | |||||
SCORE 99 Date: January 6, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20072628704 | |||||
SCORE 99 Date: May 7, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20072628702 | |||||
SCORE 99 Date: January 21, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30095230601 | |||||
SCORE 99 Date: May 10, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30101129601 | |||||
SCORE 99 Date: January 2, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40228874202 | |||||
SCORE 99 Date: April 10, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40142879001 | |||||
SCORE 99 Date: February 3, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20060530901 | |||||
SCORE 99 Date: January 9, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20064971701 | |||||
SCORE 99 Date: June 23, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20062466301 | |||||
SCORE 99 Date: June 22, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10216250701 | |||||
SCORE 99 Date: February 14, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40159412801 | |||||
SCORE 99 Date: December 28, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10428926203 | |||||
SCORE 99 Date: November 4, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10386462201 | |||||
SCORE 99 Date: April 3, 2008 Contractor: Tishman Construction Permit status: Permit revoked | Permit id: 10450042503 | |||||
SCORE 99 Date: December 27, 2007 Contractor: Tishman Construction Permit status: Permit revoked | Permit id: 10450042502 | |||||
SCORE 99 Date: December 27, 2007 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit revoked | Permit id: 10450042502 | |||||
SCORE 99 Date: July 27, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10252345901 | |||||
SCORE 99 Date: January 23, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10252345902 | |||||
SCORE 99 Date: February 21, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10252345903 | |||||
SCORE 99 Date: January 28, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10252345904 | |||||
SCORE 99 Date: January 10, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10252345905 | |||||
SCORE 99 Date: November 23, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 11002241201 | |||||
SCORE 99 Date: June 5, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10187461501 | |||||
SCORE 99 Date: September 21, 1995 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30042176401 | |||||
SCORE 99 Date: August 18, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10190924001 | |||||
SCORE 99 Date: November 9, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10452235801 | |||||
SCORE 99 Date: June 10, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10413329701 | |||||
SCORE 99 Date: January 16, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10147414702 | |||||
SCORE 99 Date: October 2, 1997 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10147414701 | |||||
SCORE 99 Date: December 30, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10428926202 | |||||
SCORE 99 Date: October 10, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10455773901 | |||||
SCORE 99 Date: July 3, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10249005601 | |||||
SCORE 99 Date: October 14, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10242401101 | |||||
SCORE 99 Date: September 25, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40151847001 | |||||
SCORE 99 Date: January 12, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40173101502 | |||||
SCORE 99 Date: August 21, 1997 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30043129001 | |||||
SCORE 99 Date: January 12, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40173138202 | |||||
SCORE 99 Date: December 9, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10211341901 | |||||
SCORE 99 Date: July 17, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10484199501 | |||||
SCORE 99 Date: December 29, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10384894502 | |||||
SCORE 99 Date: December 9, 2004 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10384894501 | |||||
SCORE 99 Date: December 6, 1989 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 20002028001 | |||||
SCORE 99 Date: November 30, 1990 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20003170401 | |||||
SCORE 99 Date: January 6, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30147112801 | |||||
SCORE 99 Date: January 21, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10194555801 | |||||
SCORE 99 Date: October 20, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10194523701 | |||||
SCORE 99 Date: January 13, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10194523702 | |||||
SCORE 99 Date: March 28, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10471346401 | |||||
SCORE 99 Date: September 20, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10453471901 | |||||
SCORE 99 Date: January 14, 2008 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10402401101 | |||||
SCORE 99 Date: December 16, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10430356701 | |||||
SCORE 99 Date: October 6, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10207560101 | |||||
SCORE 99 Date: January 13, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10207560102 | |||||
SCORE 99 Date: May 3, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30132859701 | |||||
SCORE 99 Date: October 11, 2007 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10492462801 | |||||
SCORE 99 Date: September 4, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10486443401 | |||||
SCORE 99 Date: September 11, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10449671501 | |||||
SCORE 99 Date: December 29, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10401711802 | |||||
SCORE 99 Date: October 4, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30112523501 | |||||
SCORE 99 Date: February 22, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30112523502 | |||||
SCORE 99 Date: July 9, 1996 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10134062001 | |||||
SCORE 99 Date: March 19, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10452795001 | |||||
SCORE 99 Date: February 26, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10197353501 | |||||
SCORE 99 Date: February 22, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30098370002 | |||||
SCORE 99 Date: April 19, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30098370001 | |||||
SCORE 99 Date: April 21, 1995 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10067023002 | |||||
SCORE 99 Date: October 7, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 20052717101 | |||||
SCORE 99 Date: February 22, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10244663001 | |||||
SCORE 99 Date: February 9, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10242430602 | |||||
SCORE 99 Date: October 25, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10242430601 | |||||
SCORE 99 Date: August 24, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40242214201 | |||||
SCORE 99 Date: March 28, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40162084901 | |||||
SCORE 99 Date: February 25, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40162084902 | |||||
SCORE 99 Date: June 17, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40146933501 | |||||
SCORE 99 Date: November 2, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40246683501 | |||||
SCORE 99 Date: March 5, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40181001901 | |||||
SCORE 99 Date: October 30, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40117253801 | |||||
SCORE 99 Date: January 25, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40117253802 | |||||
SCORE 99 Date: September 21, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10246986501 | |||||
SCORE 99 Date: October 1, 1993 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10068952301 | |||||
SCORE 99 Date: February 11, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40104646201 | |||||
SCORE 99 Date: February 5, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10466635401 | |||||
SCORE 99 Date: December 21, 2007 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10466635402 | |||||
SCORE 99 Date: January 6, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30168063302 | |||||
SCORE 99 Date: February 22, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 30103702702 | |||||
SCORE 99 Date: July 28, 1997 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10161584201 | |||||
SCORE 99 Date: July 31, 1997 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10157237101 | |||||
SCORE 99 Date: August 30, 1999 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10247213801 | |||||
SCORE 99 Date: January 2, 2001 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10247213803 | |||||
SCORE 99 Date: January 3, 2002 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10247213804 | |||||
SCORE 99 Date: January 13, 2000 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 10247213802 | |||||
SCORE 99 Date: May 15, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10442809501 | |||||
SCORE 99 Date: April 19, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10440225501 | |||||
SCORE 99 Date: February 9, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10232676002 | |||||
SCORE 99 Date: December 7, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10232676001 | |||||
SCORE 99 Date: September 1, 1993 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10068558101 | |||||
SCORE 99 Date: December 13, 2004 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40201006001 | |||||
SCORE 99 Date: December 13, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40201006001 | |||||
SCORE 99 Date: December 11, 1995 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10116798801 | |||||
SCORE 99 Date: October 22, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10235520101 | |||||
SCORE 99 Date: June 19, 1996 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10130317101 | |||||
SCORE 99 Date: November 25, 1994 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10091618101 | |||||
SCORE 99 Date: August 29, 1995 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10109652801 | |||||
SCORE 99 Date: July 17, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10188407001 | |||||
SCORE 99 Date: January 13, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10188407001 | |||||
SCORE 99 Date: March 12, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10468041801 | |||||
SCORE 99 Date: December 27, 2006 Contractor: Tishman Construction Permit status: Permit reissued | Permit id: 10462761901 | |||||
SCORE 99 Date: January 18, 2008 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 11004758301 | |||||
SCORE 99 Date: October 25, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10243736501 | |||||
SCORE 99 Date: August 16, 1995 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10097822001 | |||||
SCORE 99 Date: July 14, 1994 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10088472201 | |||||
SCORE 99 Date: March 2, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10458263001 | |||||
SCORE 99 Date: September 2, 1999 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10247526001 | |||||
SCORE 99 Date: January 13, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10247526002 | |||||
SCORE 99 Date: November 16, 1998 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10207410301 | |||||
SCORE 99 Date: May 9, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10228600901 | |||||
SCORE 99 Date: March 7, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10228600902 | |||||
SCORE 99 Date: December 31, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10228600903 | |||||
SCORE 99 Date: March 8, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10372044903 | |||||
SCORE 99 Date: August 21, 2008 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 10474711503 | |||||
SCORE 99 Date: December 29, 2006 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40209677103 | |||||
SCORE 99 Date: July 6, 2005 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40209677101 | |||||
SCORE 99 Date: July 6, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40209677101 | |||||
SCORE 99 Date: December 29, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40209677103 | |||||
SCORE 99 2033 G Street Nw Washington Dc Removal of 3 trees (1-13. 5" diameter london plane tree, 1-10. 5" diameter london plane tree, and 1-9. 5" london plane tree). Removed trees will be replaced with 3 new trees (1- nyssa sylvatica, and 2- quercus rubra). Date: October 17, 2012 Contractor: Tishman Construction Client: George Washington University | Permit type: Landscaping; tree removal 6. 1" - 12" | Permit status: Cancel/withdrawn | Expiration date: April 2, 2013 | |||||
SCORE 99 2033 G Street Nw Washington Dc Curb cut for new driveway. Length of driveway 23. 97"; width of driveway 13. 62". 4 new trees per plans, and 4 new streetlights. Landscaping alsio included. 133 of curb and gutter work. Date: February 19, 2013 Contractor: Tishman Construction Client: George Washington University | Permit type: Paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; tree planting, paving; curb & gutter(s) | Permit status: Cancel/withdrawn | Expiration date: September 30, 2013 | |||||
SCORE 99 Post Office Sq Boston Ma 02110 Construction of new equipment computer room on the 3rd floor and a new power room on the 4th floor. Includes mechanical electrical and fire alarm upgrades. Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt669904 | Parcel: 0304176000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Retail offices restaurant &;telecommunications temporary certificate;for offices;(data center - fifth floor).; tco valid for days; 2 22 2017.; pending completion of permit. Altt531923 issued: 10 28 2015 Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Expired | Current use: Mixed | Permit id: Coo664009 | Parcel: 0304540000 | |||||
SCORE 99 Date: February 14, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40159412801 | |||||
SCORE 99 Date: February 24, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40228874201 | |||||
SCORE 99 Date: January 2, 2007 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40228874202 | |||||
SCORE 99 Date: June 4, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40124029701 | |||||
SCORE 99 Date: January 30, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40119127801 | |||||
SCORE 99 Date: April 10, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40142879001 | |||||
SCORE 99 Date: January 12, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40173101502 | |||||
SCORE 99 Date: January 12, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40173138202 | |||||
SCORE 99 Date: August 24, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40242214201 | |||||
SCORE 99 Date: March 28, 2003 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40162084901 | |||||
SCORE 99 Date: February 25, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40162084902 | |||||
SCORE 99 Date: June 17, 2002 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40146933501 | |||||
SCORE 99 Date: November 2, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40246683501 | |||||
SCORE 99 Date: March 5, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40181001901 | |||||
SCORE 99 Date: October 30, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40117253801 | |||||
SCORE 99 Date: January 25, 2001 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40117253802 | |||||
SCORE 99 Date: February 11, 2000 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40104646201 | |||||
SCORE 99 Date: December 13, 2004 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40201006001 | |||||
SCORE 99 Date: December 13, 2004 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40201006001 | |||||
SCORE 99 Date: December 29, 2006 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40209677103 | |||||
SCORE 99 Date: July 6, 2005 Contractor: Tishman Construction Permit type: Equipment | Permit status: Permit issued | Permit id: 40209677101 | |||||
SCORE 99 Date: July 6, 2005 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40209677101 | |||||
SCORE 99 Date: December 29, 2006 Contractor: Tishman Construction Permit status: Permit issued | Permit id: 40209677103 | |||||
SCORE 99 2033 G Street Nw Washington Dc Paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; tree planting, paving; curb & gutter(s) Contractor: Tishman Construction Permit status: 3 | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 99 Contractor: Tishman Construction Permit status: 3 | Expiration date: April 2, 2013 | Permit id: 0 | |||||
SCORE 99 2033 G Street Nw Washington Dc Removal of 3 trees (1-13. 5" diameter london plane tree, 1-10. 5" diameter london plane tree, and 1-9. 5" london plane tree). Removed trees will be replaced with 3 new trees (1- nyssa sylvatica, and 2- quercus rubra). Contractor: Tishman Construction Permit status: Cancel/withdrawn | Expiration date: April 2, 2013 | Permit id: 0 | |||||
SCORE 99 Contractor: Tishman Construction Permit status: 3 | Expiration date: April 2, 2013 | Permit id: 0 | |||||
SCORE 99 2033 G Street Nw Washington Dc Paving; driveway(s) new- commercial, paving; sidewalk(s), landscaping; tree planting, paving; curb & gutter(s) Contractor: Tishman Construction Permit status: 3 | Expiration date: September 30, 2013 | Permit id: 0 | |||||
SCORE 99 2033 G Street Nw Washington Dc Removal of 3 trees (1-13. 5" diameter london plane tree, 1-10. 5" diameter london plane tree, and 1-9. 5" london plane tree). Removed trees will be replaced with 3 new trees (1- nyssa sylvatica, and 2- quercus rubra). Contractor: Tishman Construction Permit status: Cancel/withdrawn | Expiration date: April 2, 2013 | Permit id: 0 | |||||
SCORE 99 6 Bowdoin Sq Boston Ma 02114 Verizon - 10th floor -; build out of tenant office space.; work to include :;new offices open office area conference room new finishes glass millwork sprinkler fire alarm mep upgrades kitchen area copy room. Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt708408 | |||||
SCORE 99 8 Fenway Boston Ma 02215 Scope of work is prep demolition of space for interior renovations on the basement and 1st floor levels including drywall partitions door assemblies floor and ceiling finishes demo existing restrooms alt # 723686 filed for long form work per plans submitted for this project for berklee school of music. Client: Boston Conservatry Music | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Other | Permit id: Sf723722 | Parcel: 0401795000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Construction of new vestibule out to the 5th floor roof. Work includes drywall painting fire protection electrical and new smoke detector. Client: Msp One Summer Street Llp | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Alt684150 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Markley group - 5th floor -; install new ups system.;install new;conduits wiring and equipment to support new ups system.;work includes all new lighting systems all millwork and all finishes.; all required;mep and fa and fire sprinkler modifications.; Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt726917 | Parcel: 0304540000 | |||||
SCORE 99 28 Harrison Av Boston Ma 02111 Renovation to basement to include modifications to existing electrical room selective demo. Mechanical electrical plumbing fp fire alarm on various floors per plans. Client: New Eng Tel * Tel Co | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt690251 | Parcel: 0304482000 | |||||
SCORE 99 8 Fenway Boston Ma 02215 Scope of work: adding a new ada entry ramp rebuilding the existing entrance and stairs masonry facade restoration interior renovations to the basement and 1st floor levels including new ada bathrooms and finishes per plans mep upgrades fp fa Client: Boston Conservatry Music | Permit type: Interior/exterior work | Permit status: Open | Current use: Other | Permit id: Alt723686 | Parcel: 0401795000 | |||||
SCORE 99 6 Bowdoin Sq Boston Ma 02114 Prep demo for upcoming tenant fit out project on the 10th floor. Scope of work demo of walls finishes removal of furniture make safe plumbing hvac and electrical. Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf697013 | |||||
SCORE 99 New Sudbury St Boston Ma 02114 Construction of electrical room on the 8th floor of the government center garage. Relocate all electrical equipment and power circuits from existing electrical room on the building roof. Client: Bulfinch Congress Holdings | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt583387 | Parcel: 0302700000 | |||||
SCORE 99 1 Federal St Boston Ma 02110 Build out of tenant space on the 8th floor approximately 55 0 sf to consolidate existing tenants offices into a single space. Work to include selective demo of finishes new finishes electrical hvac mechanical sprinkler and fire alarm work all work per plans. Client: One Federal Lp | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt586939 | Parcel: 0304668000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Renovations to existing 3rd floor corridor and common area to construct a build out and tenant separation. Selective demo new finishes hvac sprinkler upgrades electrical fire alarm Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt482589 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Expansion of data center into adjacent space suite 550c. Work to include furring out existing exterior cmu walls with metal stud and drywall clean up and patching of existing concrete ceiling electrical wiring conduit install underfloor chilled water piping fire protection and fire alarm modifications waterproofing and install of 24" high raised floor tile system. Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Open | Current use: Mixed | Permit id: Alt531923 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Amending permit # alt 437194 to remove/eliminate an exterior egress door which is not required by code on the 5th floor data center. Code analysis letter attached. No cost for work since the amendment is deleting scope from the original building permit application. Date: September 24, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: A491662 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 On the 9th floor roof equipment dunnage level scope of work is to modify an existing structural steel equipment platform add chilled water piping misc. Roof work and selective demo. Client: Msp One Summer Street Llp | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Alt450604 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Installation of an 8 inch and 12 inch chilled water piping pipe hangers and supplemental structural steel supports on the roof/equipment dunnage level. Client: Msp One Summer Street Llp | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Alt450614 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Amending permit alt#531923 to include renovation of the adjacent restrooms new plumbing fixtures tile finishes millwork electrical sprinkler and fire alarm modifications. Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: A540175 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Amending permit alt450604 to add more phases to the existing project on the 9th floor roof dunnage level to install structural supports for new chilled pipes for the intergration of chiller plant piping and heat trace. Phases 2 2c 3 and 4 Client: Msp One Summer Street Llp | Permit type: Other | Permit status: Open | Current use: Comm | Permit id: A487412 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 Renovation and expansion of existing office space on the 3rd floor new drywall and glass partitions act drywall soffits sprinkler relocates mechanical electrical no new fire alarm work. Client: Msp One Summer Street Llp | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt536056 | Parcel: 0304540000 | |||||
SCORE 99 12951299 Boylston S Boston Ma Renovations to existing office space on the 3rd floor to create a staff breakroom and new open office suite. Scope includes relocated lighting sprinkler fire alarm hvac new finishes and casework. Client: Hegarty David J | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt618040 | Parcel: 0504210010 | |||||
SCORE 99 New Sudbury St Boston Ma 02114 Renovation to existing 20 sf office into a new security office on the existing level;3 parking garage for staff. Selective demo of finishes new finishes drywall mep upgrades sprinkler and fire alarm work ; Client: Bulfinch Congress Holdings | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt489535 | Parcel: 0302700000 | |||||
SCORE 99 1 Summer St Boston Ma 02111 On the 9th floor roof install a structural steel platform and supplemental support steel below. Ductwork runs from the roof to the 7th floor electrical modifications as required select demo Client: Msp One Summer Street Llp | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Alt450611 | Parcel: 0304540000 | |||||
SCORE 99 12951299 Boylston S Boston Ma Renovations to existing office space on floors 1-4 for childrens hospital. Work to include replacement of carpet ceiling tiles painting hvac diffusers and lighting. No new sprinkler work or fire alarm. Egress not affected. Client: Hegarty David J | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf494640 | Parcel: 0504210010 | |||||
SCORE 99 1 Federal St Boston Ma 02110 Demo of two offices on the 13th floor patching of walls painting ceiling and minor electrical and lighting relocations 2 sprinkler heads to be relocated no fire alarm work is part of this scope. Client: Bp Federal Street Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf595749 | Parcel: 0304410000 | |||||
SCORE 99 1 Federal St Boston Ma 02110 Build out of office space for wellington management on floors 6 &; 7. Work consists of offices common areas conference rooms kitchen pantry areas copy file areas new tel data closets mep upgrades to include sprinkler and fire alarm. Client: Bp Federal Street Llc | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt560354 | Parcel: 0304410000 | |||||
SCORE 99 Date: October 19, 2016 Contractor: Tishman Construction Permit type: Bfd bag smoke detectors | Permit id: Bsd647778 | |||||
SCORE 99 1 Federal St Boston Ma Demo of two offices on the 13th floor patching of walls painting ceiling and minor electrical and lighting relocations 2 sprinkler heads to be relocated no fire alarm work is part of this scope. Client: Bp Federal Street Llc | Permit type: Short form bldg permit | Expiration date: December 1, 2016 | Current use: Comm | Permit id: Sf595749 | Parcel: 0304410000 | |||||
SCORE 99 1295 Boylston St Boston Ma Demo renovations to office space on the 3rd floor to create staff breakroom and open office suite Date: August 1, 2016 Contractor: Tishman Construction Permit type: Bfd construction demo reno | Permit id: Fdc618052 | |||||
SCORE 99 1 Federal St Boston Ma Build out of tenant space on the 8th floor approximately 55 0 sf to consolidate existing tenants offices into a single space. Work to include selective demo of finishes new finishes electrical hvac mechanical sprinkler and fire alarm work all work per plans. Client: One Federal Lp | Permit type: Long form/alteration permit | Expiration date: November 11, 2016 | Current use: Comm | Permit id: Alt586939 | Parcel: 0304668000 | |||||
SCORE 99 12951299 Boylston S Boston Ma Renovations to existing office space on the 3rd floor to create a staff breakroom and new open office suite. Scope includes relocated lighting sprinkler fire alarm hvac new finishes and casework. Client: Hegarty David J | Permit type: Long form/alteration permit | Expiration date: February 8, 2017 | Current use: Comm | Permit id: Alt618040 | Parcel: 0504210010 | |||||
SCORE 99 New Sudbury St Boston Ma Construction of electrical room on the 8th floor of the government center garage. Relocate all electrical equipment and power circuits from existing electrical room on the building roof. Client: Bulfinch Congress Holdings | Permit type: Long form/alteration permit | Expiration date: November 11, 2016 | Current use: Comm | Permit id: Alt583387 | Parcel: 0302700000 | |||||
SCORE 99 Date: July 15, 2015 Contractor: Tishman Construction Client: Snh Medical Office Props Trust | Permit type: Bfd construction demo reno | Permit id: Fdc490891 | Parcel: 0504210010 | |||||
SCORE 99 1 Summer St Boston Ma Expansion of data center into adjacent space suite 550c. Work to include furring out existing exterior cmu walls with metal stud and drywall clean up and patching of existing concrete ceiling electrical wiring conduit install underfloor chilled water piping fire protection and fire alarm modifications waterproofing and install of 24" high raised floor tile system. Client: Msp One Summer St Llp | Permit type: Long form/alteration permit | Expiration date: April 28, 2016 | Current use: Mixed | Permit id: Alt531923 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Renovation and expansion of existing office space on the 3rd floor new drywall and glass partitions act drywall soffits sprinkler relocates mechanical electrical no new fire alarm work. Client: Msp One Summer St Llp | Permit type: Long form/alteration permit | Expiration date: May 17, 2016 | Current use: Comm | Permit id: Alt536056 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Amending permit alt#531923 to include renovation of the adjacent restrooms new plumbing fixtures tile finishes millwork electrical sprinkler and fire alarm modifications. Client: Msp One Summer St Llp | Permit type: Amendment to a long form | Expiration date: June 1, 2016 | Current use: Comm | Permit id: A540175 | Parcel: 0304540000 | |||||
SCORE 99 New Sudbury St Boston Ma Lpr demolition and reconstruction of parking garage ramps and parking decks on the first four levels of the existing garage to enable the future residential building construction included is the relocation of 1 electric room and the rerouting of storm and sanitary drain piping. And standpipe Client: Bulfinch Congre | Permit type: Long form/alteration permit | Expiration date: June 3, 2016 | Current use: Comm | Permit id: Alt532297 | Parcel: 0302700000 | |||||
SCORE 99 1 Summer St Boston Ma Renovations to existing 3rd floor corridor and common area to construct a build out and tenant separation. Selective demo new finishes hvac sprinkler upgrades electrical fire alarm Client: Msp One Summer St Llp | Permit type: Long form/alteration permit | Expiration date: December 18, 2015 | Current use: Comm | Permit id: Alt482589 | Parcel: 0304540000 | |||||
SCORE 99 New Sudbury St Boston Ma Renovation to existing 20 sf office into a new security office on the existing level;3 parking garage for staff. Selective demo of finishes new finishes drywall mep upgrades sprinkler and fire alarm work ; Client: Bulfinch Congre | Permit type: Long form/alteration permit | Expiration date: January 14, 2016 | Current use: Comm | Permit id: Alt489535 | Parcel: 0302700000 | |||||
SCORE 99 1295 1299 Boylston S Boston Ma Renovations to existing office space on floors 1-4 for childrens hospital. Work to include replacement of carpet ceiling tiles painting hvac diffusers and lighting. No new sprinkler work or fire alarm. Egress not affected. Client: Snh Medical Office Props Trust | Permit type: Short form bldg permit | Expiration date: January 15, 2016 | Current use: Comm | Permit id: Sf494640 | Parcel: 0504210010 | |||||
SCORE 99 1 Summer St Boston Ma On the 9th floor roof install a structural steel platform and supplemental support steel below. Ductwork runs from the roof to the 7th floor electrical modifications as required select demo Client: Msp One Summer St Llp | Permit type: Long form/alteration permit | Expiration date: September 20, 2015 | Current use: Comm | Permit id: Alt450611 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Amending permit alt450604 to add more phases to the existing project on the 9th floor roof dunnage level to install structural supports for new chilled pipes for the intergration of chiller plant piping and heat trace. Phases 2 2c 3 and 4 Client: Msp One Summer St Llp | Permit type: Amendment to a long form | Expiration date: February 4, 2016 | Current use: Comm | Permit id: A487412 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma On the 9th floor roof equipment dunnage level scope of work is to modify an existing structural steel equipment platform add chilled water piping misc. Roof work and selective demo. Client: Msp One Summer St Llp | Permit type: Long form/alteration permit | Expiration date: September 20, 2015 | Current use: Comm | Permit id: Alt450604 | Parcel: 0304540000 | |||||
SCORE 99 12951299 Boylston S Boston Ma Renovations to existing office space on floors 1-4 for childrens hospital. Work to include replacement of carpet ceiling tiles painting hvac diffusers and lighting. No new sprinkler work or fire alarm. Egress not affected. Client: Hegarty David J | Permit type: Short form bldg permit | Expiration date: January 15, 2016 | Current use: Comm | Permit id: Sf494640 | Parcel: 0504210010 | |||||
SCORE 99 1 Federal St Boston Ma Demo renovations to office space on the 6th & 7th floor to include drywall painting flooring ceiling Date: February 8, 2016 Contractor: Tishman Construction Client: Bp Federal Street Llc | Permit type: Bfd construction demo reno | Permit id: Fdc560271 | Parcel: 0304410000 | |||||
SCORE 99 1 Federal St Boston Ma Demo office renovations on the 13th floor to include drywall painting &; ceiling Date: June 2, 2016 Contractor: Tishman Construction Client: Bp Federal Street Llc | Permit type: Bfd construction demo reno | Permit id: Fdc595616 | Parcel: 0304410000 | |||||
SCORE 99 1 Federal St Boston Ma Build out of office space for wellington management on floors 6 &; 7. Work consists of offices common areas conference rooms kitchen pantry areas copy file areas new tel data closets mep upgrades to include sprinkler and fire alarm. Client: Bp Federal Street Llc | Permit type: Long form/alteration permit | Expiration date: August 16, 2016 | Current use: Comm | Permit id: Alt560354 | Parcel: 0304410000 | |||||
SCORE 99 1 Federal St Boston Ma Demo office renovations on the 8th floor to include drywall painting ceiling flooring Date: May 5, 2016 Contractor: Tishman Construction Client: One Federal Lp | Permit type: Bfd construction demo reno | Permit id: Fdc587101 | Parcel: 0304668000 | |||||
SCORE 99 New Sudbury St Boston Ma Demo renovations to existing space;to include drywall painting flooring &; ceiling Date: May 5, 2016 Contractor: Tishman Construction Client: Bulfinch Congress Holdings | Permit type: Bfd construction demo reno | Permit id: Fdc586152 | Parcel: 0302700000 | |||||
SCORE 99 Date: July 15, 2015 Contractor: Tishman Construction Client: Hegarty David J | Permit type: Bfd construction demo reno | Permit id: Fdc490891 | Parcel: 0504210010 | |||||
SCORE 99 Date: March 10, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd construction demo reno | Permit id: Fdc452155 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Demo/renovations; drywall flooring ceiling painting of common area space on the 3rd floor Date: June 19, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd construction demo reno | Permit id: Fdc483051 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Demo/renovation to existing space on the 3rd floor to include drywall painting flooring ceiling Date: November 20, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd construction demo reno | Permit id: Fdc536303 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Installation of an 8 inch and 12 inch chilled water piping pipe hangers and supplemental structural steel supports on the roof/equipment dunnage level. Client: Msp One Summer Street Llp | Permit type: Long form/alteration permit | Expiration date: September 20, 2015 | Current use: Comm | Permit id: Alt450614 | Parcel: 0304540000 | |||||
SCORE 99 New Sudbury St Boston Ma Demo/renovations to build out office space to include drywall painting ceiling flooring Date: July 14, 2015 Contractor: Tishman Construction Client: Bulfinch Congress Holdings | Permit type: Bfd construction demo reno | Permit id: Fdc489510 | Parcel: 0302700000 | |||||
SCORE 99 1 Summer St Boston Ma Retail offices restaurant &;telecommunications temporary certificate;for offices;(data center - fifth floor).; tco valid for days; 2 22 2017.; pending completion of permit. Altt531923 issued: 10 28 2015 Client: Msp One Summer Street Llp | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo664009 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Amending permit # alt 437194 to remove/eliminate an exterior egress door which is not required by code on the 5th floor data center. Code analysis letter attached. No cost for work since the amendment is deleting scope from the original building permit application. Date: September 24, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Amendment to a long form | Expiration date: March 24, 2016 | Current use: Comm | Permit id: A491662 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Demo/renovations of 5th floor space to include drywall painting ceiling flooring Date: October 29, 2015 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd construction demo reno | Permit id: Fdc532428 | Parcel: 0304540000 | |||||
SCORE 99 Date: September 18, 2012 Contractor: Tishman Construction Permit type: Permit - scaffolding | Permit id: 100458480 | |||||
SCORE 99 Date: September 18, 2012 Contractor: Tishman Construction Permit type: Permit - scaffolding | Permit id: 100458480 | |||||
SCORE 99 Date: April 13, 2017 Contractor: Tishman Construction Permit type: Bfd bag smoke detectors | Permit id: Bsd697025 | |||||
SCORE 99 1295 Boylston St Boston Ma Demo renovations to office space on the 3rd floor to create staff breakroom and open office suite Date: August 1, 2016 Contractor: Tishman Construction Permit type: Bfd construction demo reno | Permit id: Fdc618052 | |||||
SCORE 99 1 Federal St Boston Ma Build out of tenant space on the 8th floor approximately 55 0 sf to consolidate existing tenants offices into a single space. Work to include selective demo of finishes new finishes electrical hvac mechanical sprinkler and fire alarm work all work per plans. Client: One Federal Lp | Permit type: Long form/alteration permit | Expiration date: November 11, 2016 | Current use: Comm | Permit id: Alt586939 | Parcel: 0304668000 | |||||
SCORE 99 6 Bowdoin Sq Boston Ma Demo tenant fit out to include demo of walls finishes removal of furniture new finishes Date: April 13, 2017 Contractor: Tishman Construction Permit type: Bfd construction demo reno | Permit id: Fdc697020 | |||||
SCORE 99 6 Bowdoin Sq Boston Ma Prep demo for upcoming tenant fit out project on the 10th floor. Scope of work demo of walls finishes removal of furniture make safe plumbing hvac and electrical. Permit type: Short form bldg permit | Expiration date: October 13, 2017 | Current use: Comm | Permit id: Sf697013 | |||||
SCORE 99 1 Summer St Boston Ma Construction of new vestibule out to the 5th floor roof. Work includes drywall painting fire protection electrical and new smoke detector. Client: Msp One Summer Street Llp | Permit type: Long form/alteration permit | Expiration date: September 9, 2017 | Current use: Comm | Permit id: Alt684150 | Parcel: 0304540000 | |||||
SCORE 99 Date: October 19, 2016 Contractor: Tishman Construction Permit type: Bfd bag smoke detectors | Permit id: Bsd647778 | |||||
SCORE 99 6 Bowdoin Sq Boston Ma Verizon - 10th floor -; build out of tenant office space.; work to include :;new offices open office area conference room new finishes glass millwork sprinkler fire alarm mep upgrades kitchen area copy room. Permit type: Long form/alteration permit | Expiration date: December 1, 2017 | Current use: Comm | Permit id: Alt708408 | |||||
SCORE 99 New Sudbury St Boston Ma Construction of electrical room on the 8th floor of the government center garage. Relocate all electrical equipment and power circuits from existing electrical room on the building roof. Client: Bulfinch Congress Holdings | Permit type: Long form/alteration permit | Expiration date: November 11, 2016 | Current use: Comm | Permit id: Alt583387 | Parcel: 0302700000 | |||||
SCORE 99 Date: June 19, 2017 Contractor: Tishman Construction Client: Bp Federal Street Llc | Permit type: Bfd bag smoke detectors | Permit id: Bsd721340 | Parcel: 0304410000 | |||||
SCORE 99 1 Federal St Boston Ma Demo of two offices on the 13th floor patching of walls painting ceiling and minor electrical and lighting relocations 2 sprinkler heads to be relocated no fire alarm work is part of this scope. Client: Bp Federal Street Llc | Permit type: Short form bldg permit | Expiration date: December 1, 2016 | Current use: Comm | Permit id: Sf595749 | Parcel: 0304410000 | |||||
SCORE 99 12951299 Boylston S Boston Ma Renovations to existing office space on the 3rd floor to create a staff breakroom and new open office suite. Scope includes relocated lighting sprinkler fire alarm hvac new finishes and casework. Client: Hegarty David J | Permit type: Long form/alteration permit | Expiration date: February 8, 2017 | Current use: Comm | Permit id: Alt618040 | Parcel: 0504210010 | |||||
SCORE 99 28 Harrison Av Boston Ma Renovation to basement to include modifications to existing electrical room selective demo. Mechanical electrical plumbing fp fire alarm on various floors per plans. Client: New Eng Tel * Tel Co | Permit type: Long form/alteration permit | Expiration date: October 5, 2017 | Current use: Comm | Permit id: Alt690251 | Parcel: 0304482000 | |||||
SCORE 99 8 Fenway Boston Ma Scope of work is prep demolition of space for interior renovations on the basement and 1st floor levels including drywall partitions door assemblies floor and ceiling finishes demo existing restrooms alt # 723686 filed for long form work per plans submitted for this project for berklee school of music. Client: Boston Conservatry Music | Permit type: Short form bldg permit | Expiration date: December 23, 2017 | Current use: Other | Permit id: Sf723722 | Parcel: 0401795000 | |||||
SCORE 99 Post Office Sq Boston Ma Construction of new equipment computer room on the 3rd floor and a new power room on the 4th floor. Includes mechanical electrical and fire alarm upgrades. Permit type: Long form/alteration permit | Expiration date: July 12, 2017 | Current use: Comm | Permit id: Alt669904 | Parcel: 0304176000 | |||||
SCORE 99 1 Summer St Boston Ma Demo renovations to existing 5th floor space to install new ups system to include installation of conduits wiring and equipment to support new system selective demo of finishes new drywall and painting Date: July 12, 2017 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd construction demo reno | Permit id: Fdc727302 | Parcel: 0304540000 | |||||
SCORE 99 Date: July 12, 2017 Contractor: Tishman Construction Client: Msp One Summer Street Llp | Permit type: Bfd bag smoke detectors | Permit id: Bsd727307 | Parcel: 0304540000 | |||||
SCORE 99 1 Summer St Boston Ma Markley group - 5th floor -; install new ups system.;install new;conduits wiring and equipment to support new ups system.;work includes all new lighting systems all millwork and all finishes.; all required;mep and fa and fire sprinkler modifications.; Client: Msp One Summer Street Llp | Permit type: Long form/alteration permit | Expiration date: January 12, 2018 | Current use: Comm | Permit id: Alt726917 | Parcel: 0304540000 | |||||
SCORE 99 8 Fenway Boston Ma Scope of work: adding a new ada entry ramp rebuilding the existing entrance and stairs masonry facade restoration interior renovations to the basement and 1st floor levels including new ada bathrooms and finishes per plans mep upgrades fp fa Client: Boston Conservatry Music | Permit type: Long form/alteration permit | Expiration date: January 18, 2018 | Current use: Other | Permit id: Alt723686 | Parcel: 0401795000 | |||||
SCORE 99 Date: July 19, 2017 Contractor: Tishman Construction Client: Boston Conservatry Music | Permit type: Bfd construction demo reno | Expiration date: July 18, 2018 | Permit id: Fdc730527 | Parcel: 0401795000 | |||||
SCORE 99 Date: July 19, 2017 Contractor: Tishman Construction Client: Boston Conservatry Music | Permit type: Bfd bag smoke detectors | Permit id: Bsd730534 | Parcel: 0401795000 |