Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 916 999 Block Of New Hampshire Avenue Nw Washington Dc The project is to build a vault within the exterior access well adjacent to the building. Installation of an 8,0 gallon fuels tank. Date: March 31, 2015 Contractor: Tim Connor Client: Bill Jerousek | Permit type: Ps rental; parking on public space | Permit status: Cancel/withdrawn | Expiration date: July 2, 2015 | |||||
SCORE 79 9 New Hampshire Avenue Nw Washington Dc Project proposes to install a fuel tank within an existing areaway along the westside of the building along new hampshire ave, nw. The work will be performed during the hours of 9:30am to 3: pm. The work zone includes 4 parking spaces along the eastside curb and extends to the face of the building. Sidewalk pedestrian detours will be in place during work hours. The sidewalk will be open during non-work hours. Saturday mobile crane activities may be required and will be coordinated with ddot. This permit is associated with building permit b1505447 Date: June 2, 2015 Contractor: Tim Connor Client: Bill Jerousek | Permit type: Ps rental; parking on public space | Permit status: Cancel/withdrawn | Expiration date: September 4, 2015 | |||||
SCORE 79 Contractor: Tim Connor Permit status: 3 | Expiration date: July 2, 2015 | Permit id: 0 | |||||
SCORE 79 Contractor: Tim Connor Permit status: 3 | Expiration date: September 4, 2015 | Permit id: 0 | |||||
SCORE 79 916 999 Block Of New Hampshire Avenue Nw Washington Dc The project is to build a vault within the exterior access well adjacent to the building. Installation of an 8,0 gallon fuels tank. Contractor: Tim Connor Permit status: Cancel/withdrawn | Expiration date: July 2, 2015 | Permit id: 0 | |||||
SCORE 79 9 New Hampshire Avenue Nw Washington Dc Project proposes to install a fuel tank within an existing areaway along the westside of the building along new hampshire ave, nw. The work will be performed during the hours of 9:30am to 3: pm. The work zone includes 4 parking spaces along the eastside curb and extends to the face of the building. Sidewalk pedestrian detours will be in place during work hours. The sidewalk will be open during non-work hours. Saturday mobile crane activities may be required and will be coordinated with ddot. This permit is associated with building permit b1505447 Contractor: Tim Connor Permit status: Cancel/withdrawn | Expiration date: September 4, 2015 | Permit id: 0 | |||||
SCORE 79 Contractor: Tim Connor Permit status: 3 | Expiration date: July 2, 2015 | Permit id: 0 | |||||
SCORE 79 Contractor: Tim Connor Permit status: 3 | Expiration date: September 4, 2015 | Permit id: 0 | |||||
SCORE 79 9 New Hampshire Avenue Nw Washington Dc Project proposes to install a fuel tank within an existing areaway along the westside of the building along new hampshire ave, nw. The work will be performed during the hours of 9:30am to 3: pm. The work zone includes 4 parking spaces along the eastside curb and extends to the face of the building. Sidewalk pedestrian detours will be in place during work hours. The sidewalk will be open during non-work hours. Saturday mobile crane activities may be required and will be coordinated with ddot. This permit is associated with building permit b1505447 Contractor: Tim Connor Permit status: Cancel/withdrawn | Expiration date: September 4, 2015 | Permit id: 0 | |||||
SCORE 79 916 999 Block Of New Hampshire Avenue Nw Washington Dc The project is to build a vault within the exterior access well adjacent to the building. Installation of an 8,0 gallon fuels tank. Contractor: Tim Connor Permit status: Cancel/withdrawn | Expiration date: July 2, 2015 | Permit id: 0 |