Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Electrical Date: May 23, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-134 | |||||
SCORE 86 Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 Electrical Date: February 19, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-046 | |||||
SCORE 86 Pv1 single family dwelling. Total system size 3kw ac using transformed Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Pv1 single family dwelling. Total system size 3. 8kw ac using microinve Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Pv1 single family dwelling. Total system size 5kw ac using transformer Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Roof mounted pv stystem with enphase model m215-60-. System size 5. 2k Date: May 16, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-131 | |||||
SCORE 86 Pv1 single family dwelling. Total system size 7. 7kw ac using enphase m Date: June 13, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-158 | |||||
SCORE 86 Pv1 single family dwelling. Total system size 6. 5kw ac using 2 transfo Date: July 8, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-118 | |||||
SCORE 86 Pv1 install roof-mounted solar array on sfd, interconnect with main pa Date: July 22, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-197 | |||||
SCORE 86 Pv1 install roof-mounted system on sfd, interconnect with msp. System Date: August 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: August 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 Pv1 sfd, total system size 6. 4kw ac using microinverter enphase m215. Date: September 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 Pv1 sfd. Total system size 5. 18kw ac using microinverter. Using standa Date: September 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 7954 Fallbrook Ave Los Angeles Ca 91304 Pv1 install roof-mounted system on sfd, interconnect with msp. System Date: August 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 1453 Allenford Ave Los Angeles Ca 90049 Pv1 single family dwelling. Total system size 3. 8kw ac using microinve Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 20725 Quedo Dr Los Angeles Ca 91364 Pv1 install roof-mounted solar array on sfd, interconnect with main pa Date: July 22, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-197 | |||||
SCORE 86 Date: July 1, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-178 | |||||
SCORE 86 Date: February 19, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-046 | |||||
SCORE 86 Date: June 13, 2014 Contractor: Tiffany Garza Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-159 | |||||
SCORE 86 16338 Keeler Dr Los Angeles Ca 91344 Pv1 sfd, total system size 6. 4kw ac using microinverter enphase m215. Date: September 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 Date: July 9, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-184 | |||||
SCORE 86 8221 Bobbyboyar Ave Los Angeles Ca 91304 Pv1 single family dwelling. Total system size 7. 7kw ac using enphase m Date: June 13, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-158 | |||||
SCORE 86 Date: December 20, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-355 | |||||
SCORE 86 Date: October 17, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-290 | |||||
SCORE 86 7911 Naylor Ave Los Angeles Ca 90045 Pv1 single family dwelling. Total system size 3kw ac using transformed Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 2909 Rodin Pl Los Angeles Ca 90065 Pv1 single family dwelling. Total system size 5kw ac using transformer Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 3741 Royal Woods Dr Los Angeles Ca 91403 Pv1 single family dwelling. Total system size 6. 5kw ac using 2 transfo Date: July 8, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-118 | |||||
SCORE 86 3954 Hobart Blvd Los Angeles Ca 90062 Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 21308 Celtic St Los Angeles Ca 91311 Roof mounted pv stystem with enphase model m215-60-. System size 5. 2k Date: May 16, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-131 | |||||
SCORE 86 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-092 | |||||
SCORE 86 Date: May 23, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-134 | |||||
SCORE 86 7057 Calhoun Ave Los Angeles Ca 91405 Pv1 sfd. Total system size 5. 18kw ac using microinverter. Using standa Date: September 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 Date: April 17, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-101 | |||||
SCORE 86 1012 Palms Blvd Los Angeles Ca 90291 Pv1 single family dwelling. Total system size 3. 8kw ac using microinve Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Date: May 23, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-134 | |||||
SCORE 86 Date: June 13, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-158 | |||||
SCORE 86 6637 Bellaire Ave Los Angeles Ca 91606 Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: August 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 7954 Fallbrook Ave Los Angeles Ca 91304 San Diego Ca Pv1 install roof-mounted system on sfd, interconnect with msp. System Date: August 28, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 Date: December 20, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-355 | |||||
SCORE 86 Date: October 17, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-290 | |||||
SCORE 86 7911 Naylor Ave Los Angeles Ca 90045 San Diego Ca Pv1 single family dwelling. Total system size 3kw ac using transformed Date: April 4, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 2909 Rodin Pl Los Angeles Ca 90065 San Diego Ca Pv1 single family dwelling. Total system size 5kw ac using transformer Date: April 4, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 3741 Royal Woods Dr Los Angeles Ca 91403 San Diego Ca Pv1 single family dwelling. Total system size 6. 5kw ac using 2 transfo Date: July 8, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-118 | |||||
SCORE 86 3954 Hobart Blvd Los Angeles Ca 90062 San Diego Ca Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 21308 Celtic St Los Angeles Ca 91311 San Diego Ca Roof mounted pv stystem with enphase model m215-60-. System size 5. 2k Date: May 16, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-131 | |||||
SCORE 86 Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-092 | |||||
SCORE 86 Date: May 23, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-134 | |||||
SCORE 86 7057 Calhoun Ave Los Angeles Ca 91405 San Diego Ca Pv1 sfd. Total system size 5. 18kw ac using microinverter. Using standa Date: September 5, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 Date: April 17, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-101 | |||||
SCORE 86 1012 Palms Blvd Los Angeles Ca 90291 San Diego Ca Pv1 single family dwelling. Total system size 3. 8kw ac using microinve Date: April 4, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Date: May 23, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-134 | |||||
SCORE 86 Date: June 13, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-158 | |||||
SCORE 86 6637 Bellaire Ave Los Angeles Ca 91606 San Diego Ca Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: August 28, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-236 | |||||
SCORE 86 Date: February 19, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-046 | |||||
SCORE 86 1453 Allenford Ave Los Angeles Ca 90049 San Diego Ca Pv1 single family dwelling. Total system size 3. 8kw ac using microinve Date: April 4, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-089 | |||||
SCORE 86 Date: June 13, 2014 Contractor: Tiffany Garza Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-159 | |||||
SCORE 86 20725 Quedo Dr Los Angeles Ca 91364 San Diego Ca Pv1 install roof-mounted solar array on sfd, interconnect with main pa Date: July 22, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-197 | |||||
SCORE 86 Date: July 1, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-178 | |||||
SCORE 86 16338 Keeler Dr Los Angeles Ca 91344 San Diego Ca Pv1 sfd, total system size 6. 4kw ac using microinverter enphase m215. Date: September 5, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-243 | |||||
SCORE 86 Date: July 9, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-184 | |||||
SCORE 86 8221 Bobbyboyar Ave Los Angeles Ca 91304 San Diego Ca Pv1 single family dwelling. Total system size 7. 7kw ac using enphase m Date: June 13, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-158 | |||||
SCORE 86 Pv1, roof-mounted system on 2-story house (6 kw dc) {24 modules: ca Date: May 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-128 | |||||
SCORE 86 Pv1. Roof-mounted 7 kw dc solar array, interconnect into existing mai Date: July 8, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-140 | |||||
SCORE 86 Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 Pv1 5. 184kwac. 240v. Microinverter. Std. 1story. Roofmount. [(24) inve Date: October 10, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-282 | |||||
SCORE 86 Pv1 roof-mounted solar array, interconnecting with main panel. System Date: October 10, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-250 | |||||
SCORE 86 Pv1 roof-mounted solar array installation, interconnecting to main in Date: October 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-256 | |||||
SCORE 86 Pv1, roof-mounted solar installation in a single story home. Interconn Date: October 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-290 | |||||
SCORE 86 Pv1, roof-mounted microinverter solar array installation interconnecti Date: October 29, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-299 | |||||
SCORE 86 Pv1, install 5 kw dc roof-mounted solar array, interconnect with exist Date: January 13, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-009 | |||||
SCORE 86 Pv1 7. 74kwdc. 240v. Microinverter. Nonstd. 2story. Roofmount. [(36) in Date: January 23, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-018 | |||||
SCORE 86 Pv1 6. 45kwac. 240v. Microinverter. Nonstd. 2story. Roofmount. [(30) in Date: February 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 Pv1 4. 5kwdc. 240v. Xmfrless/ungnd. Nonstd. 1story. Roofmount. [(1) inv Date: February 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 Pv1 6kwdc. 240v. Negative gnd. Nonstd. 1story. Roofmount. [(1) inverte Date: February 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 Pv1, roof-mounted solar installation, interconnecting with 200a main. S Date: March 24, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-346 | |||||
SCORE 86 Pv1. Install 1. Kw roof-mounted pv system, interconnect with main s Date: March 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 Pv1. Install 4. Kw roof-mounted pv system, interconnect with main s Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 Pv1 4. 5kwdc. 240v. Xmfrless/ungnd. Std. 1story. Roofmount. [(1) invert Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-085 | |||||
SCORE 86 Pv1. Install 9 kw roof-mounted pv system, interconnect with main serv Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 Roof mounted pv system with 7. 5kwac. Date: April 2, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 Pv1. Roofmounted solar system. Standard microinverter plan. System siz Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 Pv1. Install 6 kw roof-mounted pv system, interconnect with main se Date: April 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 Pv1. Install 4. 75 kw roof-mounted pv system, interconnect with main s Date: May 2, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 Pv1. Roof mounted solar system. Standard microinverter plan. System si Date: May 30, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-144 | |||||
SCORE 86 6kw pv1 roof-mounted system with (24) solarworld poly sw2 modules, a Date: June 10, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-154 | |||||
SCORE 86 6kw standard pv1 roof-mounted system with (24) enphase m215 microinver Date: June 27, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-174 | |||||
SCORE 86 Pv1 microinverter standard plan. Install roof-mounted solar array on s Date: July 7, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 7, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 Pv1 install roof-mounted solar array on sfd. System size: 4. 73kw (22) Date: July 22, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 Pv1. Install 6 kw roof-mounted, utility-interactive pv system. Cen Date: August 6, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 Electrical Date: August 8, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 Pv1. Install 6. 0 kw roof-mounted, utility-interactive pv system. C Date: August 29, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-238 | |||||
SCORE 86 48 Balboa Ave Los Angeles Ca 91316 Pv1. Install 9. Kw roof-mounted, utility-interactive pv system. 40 Date: September 11, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-238 | |||||
SCORE 86 Pv1. Install roof mounted pv system on sfd and detached garage. Interc Date: January 15, 2015 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-349 | |||||
SCORE 86 11332 Kingsland St Los Angeles Ca 90066 Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 6735 Babcock Ave Los Angeles Ca 91606 Pv1 roof-mounted solar array installation, interconnecting to main in Date: October 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-256 | |||||
SCORE 86 575 Hanley Ave Los Angeles Ca 90049 Pv1. Install 4. Kw roof-mounted pv system, interconnect with main s Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 11261 Blix St Los Angeles Ca 91602 Pv1 5. 184kwac. 240v. Microinverter. Std. 1story. Roofmount. [(24) inve Date: October 10, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-282 | |||||
SCORE 86 6056 Simpson Ave Los Angeles Ca 91606 6kw pv1 roof-mounted system with (24) solarworld poly sw2 modules, a Date: June 10, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-154 | |||||
SCORE 86 2126 Beverly Dr Los Angeles Ca 90034 Pv1 6. 45kwac. 240v. Microinverter. Nonstd. 2story. Roofmount. [(30) in Date: February 5, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 158 Yarnell St Los Angeles Ca 91342 Pv1. Roof mounted solar system. Standard microinverter plan. System si Date: May 30, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-144 | |||||
SCORE 86 2681 Cunard St Los Angeles Ca 90065 6kw standard pv1 roof-mounted system with (24) enphase m215 microinver Date: June 27, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-174 | |||||
SCORE 86 Date: March 28, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 19112 Halsted St Los Angeles Ca 91324 Pv1 microinverter standard plan. Install roof-mounted solar array on s Date: July 7, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 101 Wealtha Ave Los Angeles Ca 91352 6kw standard pv1 roof-mounted system with (24) enphase m215 microinver Date: June 27, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-174 | |||||
SCORE 86 6525 Quinton Lane Los Angeles Ca 91042 Pv1. Roofmounted solar system. Standard microinverter plan. System siz Date: April 4, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 19745 Lassen St Los Angeles Ca 91311 Pv1, roof-mounted microinverter solar array installation interconnecti Date: October 29, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-299 | |||||
SCORE 86 891 Bronson Ave Los Angeles Ca 90005 Pv1. Install roof mounted pv system on sfd and detached garage. Interc Date: January 15, 2015 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-349 | |||||
SCORE 86 8614 Amestoy Ave Los Angeles Ca 91325 Pv1 6kwdc. 240v. Negative gnd. Nonstd. 1story. Roofmount. [(1) inverte Date: February 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 40 Rogen Dr Los Angeles Ca 91436 Pv1, roof-mounted solar installation, interconnecting with 200a main. S Date: March 24, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-346 | |||||
SCORE 86 9019 Balcom Ave Los Angeles Ca 91325 Pv1. Install 9 kw roof-mounted pv system, interconnect with main serv Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 11186 Chalon Road Los Angeles Ca 90049 Pv1. Roof-mounted 7 kw dc solar array, interconnect into existing mai Date: July 8, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-140 | |||||
SCORE 86 24 Lake View Ave Los Angeles Ca 90039 Pv1. Install 6 kw roof-mounted pv system, interconnect with main se Date: April 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 13337 Astoria St Los Angeles Ca 91342 Pv1 roof-mounted solar array, interconnecting with main panel. System Date: October 10, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-250 | |||||
SCORE 86 5065 Alhama Dr Los Angeles Ca 91364 Pv1. Install 4. 75 kw roof-mounted pv system, interconnect with main s Date: May 2, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 722 Gramercy Pl Los Angeles Ca 90005 Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 7, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 21618 Los Alimos St Los Angeles Ca 91311 Pv1, install 5 kw dc roof-mounted solar array, interconnect with exist Date: January 13, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-009 | |||||
SCORE 86 Date: August 8, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 12611 San Vicente Blvd Los Angeles Ca 90049 Pv1, roof-mounted solar installation in a single story home. Interconn Date: October 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-290 | |||||
SCORE 86 4337 Clarinda Dr Los Angeles Ca 91356 Pv1. Install 6 kw roof-mounted, utility-interactive pv system. Cen Date: August 6, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 Date: May 21, 2013 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-128 | |||||
SCORE 86 5341 Natick Ave Los Angeles Ca 91411 Pv1. Install 6 kw roof-mounted pv system, interconnect with main se Date: April 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 393 Kenter Ave Los Angeles Ca 90049 Pv1 install roof-mounted solar array on sfd. System size: 4. 73kw (22) Date: July 22, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 19824 Falcon Crest Ct Los Angeles Ca 91326 Pv1 7. 74kwdc. 240v. Microinverter. Nonstd. 2story. Roofmount. [(36) in Date: January 23, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-018 | |||||
SCORE 86 13367 Canyon Ridge Lane Los Angeles Ca 91344 Pv1. Install 6. 0 kw roof-mounted, utility-interactive pv system. C Date: August 29, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-238 | |||||
SCORE 86 Date: April 2, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 2045 Prosser Ave Los Angeles Ca 90025 Pv1 4. 5kwdc. 240v. Xmfrless/ungnd. Std. 1story. Roofmount. [(1) invert Date: April 1, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-085 | |||||
SCORE 86 8617 Jayseel St Los Angeles Ca 91040 Pv1 4. 5kwdc. 240v. Xmfrless/ungnd. Nonstd. 1story. Roofmount. [(1) inv Date: February 25, 2014 Contractor: Tiffany Garza Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 11332 Kingsland St Los Angeles Ca 90066 San Diego Ca Pv1 roof-mounted installation, interconnect with main panel. System si Date: September 17, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-255 | |||||
SCORE 86 6735 Babcock Ave Los Angeles Ca 91606 San Diego Ca Pv1 roof-mounted solar array installation, interconnecting to main in Date: October 21, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-256 | |||||
SCORE 86 24 Lake View Ave Los Angeles Ca 90039 San Diego Ca Pv1. Install 6 kw roof-mounted pv system, interconnect with main se Date: April 25, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 2045 Prosser Ave Los Angeles Ca 90025 San Diego Ca Pv1 4. 5kwdc. 240v. Xmfrless ungnd. Std. 1story. Roofmount. [(1) invert Date: April 1, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-085 | |||||
SCORE 86 13337 Astoria St Los Angeles Ca 91342 San Diego Ca Pv1 roof-mounted solar array, interconnecting with main panel. System Date: October 10, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-250 | |||||
SCORE 86 5065 Alhama Dr Los Angeles Ca 91364 San Diego Ca Pv1. Install 4. 75 kw roof-mounted pv system, interconnect with main s Date: May 2, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 722 Gramercy Pl Los Angeles Ca 90005 San Diego Ca Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 7, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 21618 Los Alimos St Los Angeles Ca 91311 San Diego Ca Pv1, install 5 kw dc roof-mounted solar array, interconnect with exist Date: January 13, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-009 | |||||
SCORE 86 Date: August 8, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 12611 San Vicente Blvd Los Angeles Ca 90049 San Diego Ca Pv1, roof-mounted solar installation in a single story home. Interconn Date: October 21, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-290 | |||||
SCORE 86 4337 Clarinda Dr Los Angeles Ca 91356 San Diego Ca Pv1. Install 6 kw roof-mounted, utility-interactive pv system. Cen Date: August 6, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 86 47 Janet Pl Los Angeles Ca 90041 San Diego Ca Pv1, roof-mounted system on 2-story house (6 kw dc) {24 modules: ca Date: May 21, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-128 | |||||
SCORE 86 5341 Natick Ave Los Angeles Ca 91411 San Diego Ca Pv1. Install 6 kw roof-mounted pv system, interconnect with main se Date: April 25, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-109 | |||||
SCORE 86 393 Kenter Ave Los Angeles Ca 90049 San Diego Ca Pv1 install roof-mounted solar array on sfd. System size: 4. 73kw (22) Date: July 22, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 19824 Falcon Crest Ct Los Angeles Ca 91326 San Diego Ca Pv1 7. 74kwdc. 240v. Microinverter. Nonstd. 2story. Roofmount. [(36) in Date: January 23, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-018 | |||||
SCORE 86 13367 Canyon Ridge Lane Los Angeles Ca 91344 San Diego Ca Pv1. Install 6. 0 kw roof-mounted, utility-interactive pv system. C Date: August 29, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-238 | |||||
SCORE 86 Date: April 2, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 575 Hanley Ave Los Angeles Ca 90049 San Diego Ca Pv1. Install 4. Kw roof-mounted pv system, interconnect with main s Date: April 1, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 11261 Blix St Los Angeles Ca 91602 San Diego Ca Pv1 5. 184kwac. 240v. Microinverter. Std. 1story. Roofmount. [(24) inve Date: October 10, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-282 | |||||
SCORE 86 6056 Simpson Ave Los Angeles Ca 91606 San Diego Ca 6kw pv1 roof-mounted system with (24) solarworld poly sw2 modules, a Date: June 10, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-154 | |||||
SCORE 86 2126 Beverly Dr Los Angeles Ca 90034 San Diego Ca Pv1 6. 45kwac. 240v. Microinverter. Nonstd. 2story. Roofmount. [(30) in Date: February 5, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 158 Yarnell St Los Angeles Ca 91342 San Diego Ca Pv1. Roof mounted solar system. Standard microinverter plan. System si Date: May 30, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-144 | |||||
SCORE 86 2681 Cunard St Los Angeles Ca 90065 San Diego Ca 6kw standard pv1 roof-mounted system with (24) enphase m215 microinver Date: June 27, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-174 | |||||
SCORE 86 326 65th St Los Angeles Ca 90003 San Diego Ca Pv1. Install 1. Kw roof-mounted pv system, interconnect with main s Date: March 28, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 891 Bronson Ave Los Angeles Ca 90005 San Diego Ca Pv1. Install roof mounted pv system on sfd and detached garage. Interc Date: January 15, 2015 Contractor: Tiffany Garza Permit status: Permit closed | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-349 | |||||
SCORE 86 8617 Jayseel St Los Angeles Ca 91040 San Diego Ca Pv1 4. 5kwdc. 240v. Xmfrless ungnd. Nonstd. 1story. Roofmount. [(1) inv Date: February 25, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 19112 Halsted St Los Angeles Ca 91324 San Diego Ca Pv1 microinverter standard plan. Install roof-mounted solar array on s Date: July 7, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-181 | |||||
SCORE 86 101 Wealtha Ave Los Angeles Ca 91352 San Diego Ca 6kw standard pv1 roof-mounted system with (24) enphase m215 microinver Date: June 27, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-174 | |||||
SCORE 86 6525 Quinton Lane Los Angeles Ca 91042 San Diego Ca Pv1. Roofmounted solar system. Standard microinverter plan. System siz Date: April 4, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-084 | |||||
SCORE 86 19745 Lassen St Los Angeles Ca 91311 San Diego Ca Pv1, roof-mounted microinverter solar array installation interconnecti Date: October 29, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-299 | |||||
SCORE 86 8614 Amestoy Ave Los Angeles Ca 91325 San Diego Ca Pv1 6kwdc. 240v. Negative gnd. Nonstd. 1story. Roofmount. [(1) inverte Date: February 25, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-025 | |||||
SCORE 86 48 Balboa Ave Los Angeles Ca 91316 San Diego Ca Pv1. Install 9. Kw roof-mounted, utility-interactive pv system. 40 Date: September 11, 2014 Contractor: Tiffany Garza Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-238 | |||||
SCORE 86 40 Rogen Dr Los Angeles Ca 91436 San Diego Ca Pv1, roof-mounted solar installation, interconnecting with 200a main. S Date: March 24, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-346 | |||||
SCORE 86 9019 Balcom Ave Los Angeles Ca 91325 San Diego Ca Pv1. Install 9 kw roof-mounted pv system, interconnect with main serv Date: April 1, 2014 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-086 | |||||
SCORE 86 11186 Chalon Road Los Angeles Ca 90049 San Diego Ca Pv1. Roof-mounted 7 kw dc solar array, interconnect into existing mai Date: July 8, 2013 Contractor: Tiffany Garza Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-140 |