Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3 16th St Ne, Washington, Dc 20002 Basment: refinish existing bathroom first floor: remove existing fullbath and install new half bath second floor: reconfigure refinish existing bath and add a new fullbath. Upgrade repair electrical wiring, repair duct, repair and upgrade plumbging Date: December 20, 2013 Contractor: Thomas Gedle Client: Isse Gaal | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1402686 |