Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 83 354 364 Longwood Av Boston Ma 02215 Install tempered water non potable hot water non potable cold water co2 reverse osmosis deionized water (rodi) vaccuum lab waste lab vent and high purity nitrogen piping and (3) emergency showers and (18) lab sinks for the dana farber cancer institute? S chemistry lab renovation project on the 3rd floor of the longwood center building located at 3 longwood avenue boston ma 02115. Client: Diabetes Founda | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl526693 | Parcel: 0401988000 | |||||
SCORE 83 Blossom St Boston Ma 02114 Renovation of 7th floor - gray building dept. Of medicine space. Scope is remove existing pendent sprinklers when ceilings are removed and install upright sprinklers for the core shell condition. Date: June 17, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk474024 | Parcel: 0300370000 | |||||
SCORE 83 55 Fruit St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: December 21, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk549163 | |||||
SCORE 83 75 Francis St Boston Ma 02115 Note only one zone shall be impaired at any given time within the building.... All impairments shall be;coordinate with the buildings impairment coordinated which is required by 527 cmr 1. 00;section 16. 3 Date: July 30, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk491289 | Parcel: 0401896000 | |||||
SCORE 83 75 Francis St Boston Ma 02115 Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one zone shall be impaired in the building at any given time coordinate impairment with building management. Date: June 26, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk481817 | Parcel: 0401896000 | |||||
SCORE 83 Blossom St Boston Ma 02114 Coordinate impairment with building managment so that only one zone is impaired at any given time within the building. The work will be executed as daily drainfill. Date: June 29, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk484142 | Parcel: 0300370000 | |||||
SCORE 83 354 364 Longwood Av Boston Ma 02215 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 26, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd other | Permit status: Na | Permit id: Sprk515943 | Parcel: 0401988000 | |||||
SCORE 83 125 Parker Hill Av Mission Hill Ma 02120 Install (1) new water closet and (1) new lavatory and all associated hot water cold water waste and vent piping on the 4th floor of the new england baptist hospital main building 4th floor. Client: New England Baptist Hospital | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl545531 | Parcel: 1001213001 | |||||
SCORE 83 354364 Longwood Av Boston Ma 02215 Install tempered water non potable hot water non potable cold water co2 reverse osmosis deionized water (rodi) vaccuum lab waste lab vent and high purity nitrogen piping and (3) emergency showers and (18) lab sinks for the dana farber cancer institutes chemistry lab renovation project on the 3rd floor of the longwood center building located at 3 longwood avenue boston ma 02115. Client: Diabetes Foundation Inc | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl526693 | Parcel: 0401988000 | |||||
SCORE 83 3 Brookline Av Boston Ma 02115 Installation of (11) new roof drains and associated piping on the 13th floor of the feldberg/raisman building of beth israel deaconess hospital located at 3 brookline avenue boston ma 02115. Client: Beth Israel Deaconess | Permit type: Plumbing | Permit status: Expired | Current use: Other | Permit id: Pl491683 | Parcel: 0401862000 | |||||
SCORE 83 4 Blackfan Ci Boston Ma 02115 Install (1) new lab sink and (1) new mop sink and associated piping and relocate cold water hot water tempered water vent sanitary waste lab vacuum lab gas co2 and reverse osmosis piping for the 2nd and 3rd floor radiation oncology lab in the harvard institute of medicine building at dana farber cancer institute at 4 blackfan circle boston ma 02115. Client: President And Fellows | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl555314 | Parcel: 0401849000 | |||||
SCORE 83 221 Longwood Av Boston Ma Impairment shall be coordinated with the buildings impairment coordinator so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. Date: October 24, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk526725 | Parcel: 0401845000 | |||||
SCORE 83 15 Francis St Boston Ma Cap an existing 3" sprinkler main to enable full demolition of the brigham and womens hospital renal service building located at 15 francis street boston ma 02115 per the included impairment plan. Total building impairment duration will be 3 weeks. Date: December 7, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk530270 | Parcel: 0401896000 | |||||
SCORE 83 125 Parker Hill Av Mission Hill Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: December 15, 2015 Contractor: Thomas G. Gallagher Client: I Street Condo | Permit type: Bfd sprinkler system | Permit id: Sprk546378 | Parcel: 1001213001 | |||||
SCORE 83 125 Parker Hill Av Mission Hill Ma Install (1) new water closet and (1) new lavatory and all associated hot water cold water waste and vent piping on the 4th floor of the new england baptist hospital main building 4th floor. Client: Figueredo Chris | Permit type: Plumbing permit | Expiration date: June 16, 2016 | Current use: Comm | Permit id: Pl545531 | Parcel: 1001213000 | |||||
SCORE 83 55 Fruit St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: December 21, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk549163 | |||||
SCORE 83 4 Blackfan Ci Boston Ma Install (1) new lab sink and (1) new mop sink and associated piping and relocate cold water hot water tempered water vent sanitary waste lab vacuum lab gas co2 and reverse osmosis piping for the 2nd and 3rd floor radiation oncology lab in the harvard institute of medicine building at dana farber cancer institute at 4 blackfan circle boston ma 02115. Client: Bodyscape Fitness | Permit type: Plumbing permit | Expiration date: July 15, 2016 | Current use: Comm | Permit id: Pl555314 | Parcel: 0401849000 | |||||
SCORE 83 75 Francis St Boston Ma Note only one zone shall be impaired at any given time within the building.... All impairments shall be;coordinate with the buildings impairment coordinated which is required by 527 cmr 1. 00;section 16. 3 Date: July 30, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk491289 | Parcel: 0401896000 | |||||
SCORE 83 75 Francis St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one zone shall be impaired in the building at any given time coordinate impairment with building management. Date: June 26, 2015 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk481817 | Parcel: 0401896000 | |||||
SCORE 83 354 364 Longwood Av Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 26, 2015 Contractor: Thomas G. Gallagher Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk515943 | Parcel: 0401988000 | |||||
SCORE 83 354 364 Longwood Av Boston Ma Install tempered water non potable hot water non potable cold water co2 reverse osmosis deionized water (rodi) vaccuum lab waste lab vent and high purity nitrogen piping and (3) emergency showers and (18) lab sinks for the dana farber cancer institutes chemistry lab renovation project on the 3rd floor of the longwood center building located at 3 longwood avenue boston ma 02115. Client: Diabetes Founda | Permit type: Plumbing permit | Expiration date: April 13, 2016 | Current use: Comm | Permit id: Pl526693 | Parcel: 0401988000 | |||||
SCORE 83 1 Childrens Rd Boston Ma Demo (34) sprinklers and install temporary uprights until (31) new sprinkler heads and their associated branch lines can be installed on the 6th floor of the main south building at boston childrens hospital Date: July 14, 2016 Contractor: Thomas G. Gallagher Client: Childrens Hospital Corp The | Permit type: Bfd sprinkler system | Permit id: Sprk598468 | Parcel: 0401895000 | |||||
SCORE 83 75 Francis St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: April 1, 2016 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk572017 | |||||
SCORE 83 354364 Longwood Av Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 26, 2015 Contractor: Thomas G. Gallagher Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk515943 | Parcel: 0401988000 | |||||
SCORE 83 Date: September 6, 2016 Contractor: Thomas G. Gallagher Client: Brigham& Womens Hosp Inc | Permit type: Bfd sprinkler system | Permit id: Sprk604095 | Parcel: 0401896000 | |||||
SCORE 83 125 Parker Hill Av Mission Hill Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: February 3, 2016 Contractor: Thomas G. Gallagher Client: New England Baptist Hospital | Permit type: Bfd sprinkler system | Permit id: Sprk552036 | Parcel: 1001213001 | |||||
SCORE 83 45 Francis St Boston Ma Only one floor shall be impaired at a time and the entire sprinkler system for that floor shall be fully restored that day. The impairment of the sprinkler system shall be coordinated with the designated building impairment coordinator. Date: May 19, 2016 Contractor: Thomas G. Gallagher Permit type: Bfd sprinkler system | Permit id: Sprk584792 | |||||
SCORE 83 35 Binney St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: February 3, 2016 Contractor: Thomas G. Gallagher Client: Dana-Farber Cancer Institute | Permit type: Bfd sprinkler system | Permit id: Sprk552021 | Parcel: 0401898000 | |||||
SCORE 83 75 Francis St Boston Ma Install (71) new sprinkler heads and their associated mains and branch lines for phase 2 of the brigham and womens nicu project on the 6th floor of the cwn building installation shall be in-accordance with 7 cmr and nfpa 13. Only one floor shall be impaired at any given time within the building. Date: August 11, 2016 Contractor: Thomas G. Gallagher Client: Brigham& Womens Hosp Inc | Permit type: Bfd sprinkler system | Permit id: Sprk595774 | Parcel: 0401896000 | |||||
SCORE 83 4 Blackfan Ci Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. Date: February 16, 2016 Contractor: Thomas G. Gallagher Client: President And Fellows | Permit type: Bfd sprinkler system | Permit id: Sprk555306 | Parcel: 0401849000 | |||||
SCORE 83 354364 Longwood Av Boston Ma Install tempered water non potable hot water non potable cold water co2 reverse osmosis deionized water (rodi) vaccuum lab waste lab vent and high purity nitrogen piping and (3) emergency showers and (18) lab sinks for the dana farber cancer institutes chemistry lab renovation project on the 3rd floor of the longwood center building located at 3 longwood avenue boston ma 02115. Client: Diabetes Foundation Inc | Permit type: Plumbing permit | Expiration date: April 13, 2016 | Current use: Comm | Permit id: Pl526693 | Parcel: 0401988000 | |||||
SCORE 83 Blossom St Boston Ma Renovation of 7th floor - gray building dept. Of medicine space. Scope is remove existing pendent sprinklers when ceilings are removed and install upright sprinklers for the core / shell condition. Date: June 17, 2015 Contractor: Thomas G. Gallagher Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk474024 | Parcel: 0300370000 | |||||
SCORE 83 Blossom St Boston Ma Coordinate impairment with building managment so that only one zone is impaired at any given time within the building. The work will be executed as daily drain/fill. Date: June 29, 2015 Contractor: Thomas G. Gallagher Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk484142 | Parcel: 0300370000 | |||||
SCORE 83 3 Brookline Av Boston Ma Installation of (11) new roof drains and associated piping on the 13th floor of the feldberg/raisman building of beth israel deaconess hospital located at 3 brookline avenue boston ma 02115. Client: Beth Israel Deaconess | Permit type: Plumbing permit | Expiration date: January 9, 2016 | Current use: Other | Permit id: Pl491683 | Parcel: 0401862000 | |||||
SCORE 83 Client: Childrens Hospital | Client Address: 482 Bedford St. Lexington Ma | Permit id: 97 |