Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 2301 Foxhall Rd Nw, Washington, Dc 20007 The interior renovation of the aude building includes classrooms, offices, corridors, and coffee station on 1st ? 2nd levels of an existing three tory building. Date: April 27, 2012 Contractor: The Field School; Lorena Checa Client: Field School The | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207159 | |||||
SCORE 61 2301 Foxhall Rd Nw, Washington, Dc 20007 The partial interior renovation of the cafritz building, 3rd floor including two classrooms, offices and corridor. Area of work is 1827 sq. Ft. Date: April 27, 2012 Contractor: The Field School; Lorena Checa Client: Field School The | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207647 | |||||
SCORE 61 2301 Foxhall Rd Nw Cafritz Bu, Washington, Dc 20007 The partial interior renovation of the admissions office on the 2nd level of the cafritz building, including 3 rooms of new finishes, moved partition, outlet relocation, and new sliding doors area of work is 4 sq. Ft. Date: July 10, 2012 Contractor: The Field School; Lorena Checa Client: Field School The | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1211332 |