Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 952 Portola Dr San Francisco Ca Remodel 1 existing kitchen replace counters cabinets & fixtures. Convert existing half baths into full bathroom. & add one new full bath in master bedroom at 2nd floor. 14 lights 8 switches 2 fans. Date: April 2, 2015 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201504027474 | |||||
SCORE 92 1261 32nd Av San Francisco Ca Rewire all new wire outlets switch 1 sub panel in ground floor. 12 lights receptacles 2 fans 35 switches 5 smoke detectors. . 12 lights 35 switches receptalces 2 fans 5 smoke detectors. Date: December 4, 2014 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201412044834 | |||||
SCORE 92 4 Head St San Francisco Ca Remodel kitchen rms & add one new bath room at 2nd floor. Construct three bedrooms two bathrooms ground floor 15 lts switches 5 fans smoke detects 1 dishwashers Date: December 17, 2015 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201512173621 | |||||
SCORE 92 952 Portola Dr San Francisco Ca Remodel existing kitchen replace counters cabinets & fixture convert eixsting half bathroom into full bathroom & add one new full bathroom in master bedroom at 2nd floor. Date: April 2, 2015 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150402369 | |||||
SCORE 92 Date: December 4, 2014 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20141204305 | |||||
SCORE 92 Date: December 4, 2014 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20141204310 | |||||
SCORE 92 4 Head St San Francisco Ca Remodel kitchen rms & add one new bath room at 2nd floor. Construct three bedrooms two bathrooms ground floor Date: December 17, 2015 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151217409 | |||||
SCORE 92 Date: March 17, 2015 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20150317883 | |||||
SCORE 92 31 Whittier St San Francisco Ca Remodel existing kitchen two bathroom & add one new bath room at 2nd floor. Construct two bedroom home office study room play room in laundry area one new bath room & legalize two bathroom at ground floor. New pipe with underground work. Date: March 17, 2015 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150317882 | |||||
SCORE 92 Date: October 25, 2013 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20131025425 | |||||
SCORE 92 Date: September 17, 2015 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150917040 | |||||
SCORE 92 372 Stratford Dr San Francisco Ca Remodel existing kitchen and 2 bathrooms change existing panel not for the service lights 9 switches receptacles 3 fans 1 dishwasher 1 garbage disposal 1 microwave 1 range. Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201509171565 | |||||
SCORE 92 311 Grafton Av San Francisco Ca Relocate (e) kitchen install cabinets counter & fixtures install new ellectrical & lighting all work at 2nd floor. Relocate range hood. Install 18 lights 5 switches 5 receptacles 1 fan 1 dishwasher 1 microwave range 3 smoke detertors. Date: August 25, 2017 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201708257245 | |||||
SCORE 92 311 Grafton Av San Francisco Ca Relocate (e) kitchen install cabinets counter & fixtures. Install new electrical & lighting. All work at 2nd floor. Date: August 25, 2017 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170825198 | |||||
SCORE 92 2132 Ulloa St San Francisco Ca Remodel kitchen convert 1 bathroom into 2 bathrooms at 2/f. Lights switches 1 fan 1 smoke detector. Date: July 14, 2014 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201407141137 | |||||
SCORE 92 2132 Ulloa St San Francisco Ca Remodel kitchen convert bathroom into 2 bathrooms at 2/f. One shower pan. Date: July 14, 2014 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140714311 | |||||
SCORE 92 Date: June 27, 2017 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20170627533 | |||||
SCORE 92 135 Farallones St San Francisco Ca Remodel kitchen bathroom at 2nd floor. Legalize bathroom at ground floor. Date: June 27, 2017 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170627532 | |||||
SCORE 92 31 Whittier St San Francisco Ca Remodel existing kitchen two bathroom & add one new bath room at 2nd floor. Construct two bedroom home office study room play room in laundry area one new bath room & legalize two bathroom at ground floor. 125 amp service 2 panelboard/switchboard. 12/24. Lights 52 switches 88 receptacles 6 fans 1 dishwasher 1 garbage disposal 1 microwave 1 range smoke detectors. Date: March 17, 2015 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201503177081 | |||||
SCORE 92 13 41st Av San Francisco Ca Change new subpanel in ground floor. Legalize two bedroom new bathroom media room & laundry room at ground floor. Remodel (2) kitchen bathroom construct one new bathroom & rewire electrical lighting at second floor. 1 amp subpanel 25 lights 25 switches receptacles 4 fans 1 dishwasher 2 garbage disposal 1 range. Date: March 24, 2017 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201703243801 | |||||
SCORE 92 13 41st Av San Francisco Ca Legalize two bedroom new bathroom media room & laundry room at ground floor. Remodel (2) kitchen bathroom construct one new bathroom & rewire electrical lighting at second floor. Date: March 24, 2017 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170324990 | |||||
SCORE 92 Date: November 30, 2016 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E20161108972 | |||||
SCORE 92 137 Thrift St San Francisco Ca G/f: legalize one bedroom one bathroom & construction one bedroom one bathroom. Remodel (e) kitchen & bathroom on 2/f. Date: October 25, 2013 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201310254680 | |||||
SCORE 92 137 Thrift St San Francisco Ca Legalize 1 one bathroom & add one new bathroopm on g/f remodel (e)_ bathroom & kitchen on 2/f. Date: October 25, 2013 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20131025421 | |||||
SCORE 92 204 Sagamore St San Francisco Ca Remodel and rewire bathroom lights 12 switches 12 receptacles 2 smoke detectors. Date: October 21, 2016 Contractor: Taos Construction Permit type: Electrical permit | Permit status: Filed | Permit id: E20161021594 | |||||
SCORE 92 Date: October 21, 2016 Contractor: Taos Construction Permit type: Plumbing permit | Permit status: Pos sent | Permit id: Pp20161021056 |