Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 6 Ithaca Dr Boulder Co Installation of 4. 18 kw,rooftop, flush-mounted, grid-tied photovoltaic solar energy system on single-family residence. Date: May 12, 2011 Contractor: Sunoneness Solar Client: J Beaver | Applicant: Sunoneness Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 17, 2011 | Current use: Single family d | |||||
SCORE 64 Client: Developmen Creekside | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 16, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02470 | |||||
SCORE 64 4245 Whitney Pl Boulder Co Owner contractor installation of a 9 kw grid tied flush mount pv system on the roof of a single family dwelling in one array. Client: William Delamere | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 16, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-05193 | |||||
SCORE 64 6 Ithaca Dr Boulder Co Installation of 4. 18 kw,rooftop, flush-mounted, grid-tied photovoltaic solar energy system on single-family residence. Client: J Beaver | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 17, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01910 |